Forwards LER 98-008-00 Re Inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.LER Being Submitted Per 10CFR50.73(a)(2)(i)(B) Requirements
Date released: 11/29/2018 Download: ML18106A560


LER 98-008-00:on 980323,inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.Caused by less-than-adequate Work Practices During Replacement of Equalizing Valve.Salem Unit 2 Airlocks Were Inspected
ML18106A561
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/20/1998
From: Enrique Villar
Public Service Enterprise Group
To:
References
Download: ML18106A561 (5)
Forwards LER 98-008-00 Re Inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.LER Being Submitted Per 10CFR50.73(a)(2)(i)(B) Requirements
ML18106A559
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/20/1998
From: Bakken A
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18106A559 (1)