Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1996-005-15, Forwards LER 96-005-15, Inadequate TS Testing - Feedwater Sys Isolation Functional Test/Component Cooling Water Heat Exchanger Service Water Flow Control Valves + (ML18106A268)
- ML18106A269 + (ML18106A269)
- ML18106A271 + (ML18106A271)
- ML18106A272 + (ML18106A272)
- LR-N980008, Discusses Option Chosen by Util to Resolve Issues Re Spent Fuel Pool Liner Analysis.Util Will Seismically Qualify Spent Fuel Pool Cooling Sys Which Will Eliminate Need to Postulate Loss of Forced Cooling + (ML18106A274)
- ML18106A275 + (ML18106A275)
- ML18106A276 + (ML18106A276)
- ML18106A277 + (ML18106A277)
- ML18106A278 + (ML18106A278)
- ML18106A279 + (ML18106A279)
- ML18106A282 + (ML18106A282)
- LR-N970817, Informs That Util Revising Commitment Contained in to State,Min Shift Staffing Levels Necessary to Perform Simultaneous Alternate Shutdown of Units 1 & 2,controlled Under Administrative Procedures + (ML18106A284)
- ML18106A285 + (ML18106A285)
- ML18106A286 + (ML18106A286)
- ML18106A287 + (ML18106A287)
- ML18106A288 + (ML18106A288)
- ML18106A289 + (ML18106A289)
- ML18106A290 + (ML18106A290)
- ML18106A291 + (ML18106A291)
- ML18106A292 + (ML18106A292)
- ML18106A295 + (ML18106A295)
- LR-N980044, Forwards Response to 980122 Telcon RAI Re Plant Primary to Secondary Leakage History,Per 971029 Lar.New Insert a Which Modifies Listed Statement,Encl + (ML18106A297)
- LR-N980049, Forwards Rev 16 to Salem Generating Station UFSAR IAW Requirements of 10CFR50.71(e).Rev Contains Identified Text, Table & Figure Changes Required to Reflect Plant Configuration as of 970731 + (ML18106A298)
- LR-N980026, Provides Status of TS Surveillance Improvement Project (Tssip) as of End of 1997 & Schedule for Completion of Remainder of Tssip Scope + (ML18106A301)
- LR-N980055, Provides Revised TS Bases Pages for Spec 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumetation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation + (ML18106A302)
- ML18106A303 + (ML18106A303)
- ML18106A305 + (ML18106A305)
- ML18106A307 + (ML18106A307)
- PNO-I-98-004, on 980211,PSE&G Commenced Shut Down of Unit 2 in Order to Make Repairs to 2A EDG & Other Plant Equipment. Operators Noted Abnormal Noise While Securing 2A EDG During Post Maint Surveillance Test + (ML18106A308)
- ML18106A309 + (ML18106A309)
- ML18106A310 + (ML18106A310)
- ML18106A311 + (ML18106A311)
- LR-N970770, Forwards Response to 970404 RAI Re Resolution of USI A-46, Seismic Qualification of Equipment in Operating Plants. Outlier Resolution Schedule Is Being Revised Since Implementation Issues May Affect Number of Outliers + (ML18106A312)
- ML18106A313 + (ML18106A313)
- LR-N980031, Forwards QA Program for Hope Creek & Salem Generating Stations,As Documented in Section 17.2 of Respective Ufsars, for NRC Approval + (ML18106A314)
- ML18106A315 + (ML18106A315)
- ML18106A316 + (ML18106A316)
- ML18106A320 + (ML18106A320)
- ML18106A321 + (ML18106A321)
- ML18106A322 + (ML18106A322)
- ML18106A323 + (ML18106A323)
- ML18106A324 + (ML18106A324)
- ML18106A325 + (ML18106A325)
- ML18106A327 + (ML18106A327)
- ML18106A328 + (ML18106A328)
- LR-N980011, Transmits Review of Final CEOG Rept, Best Estimate Cu & Ni in CE Fabricated Reactor Vessel Welds Dtd June,1997.Closure to NRC Ser,Provided.Transmittal Is in Response to GL 92-01, Rev 1,suppl 1 + (ML18106A329)
- 05000272/LER-1998-001, :on 980116,AFP Internal Flooding Protection Was Installed Incorrectly.Caused by Installation Error During Construction.Pipe Alley Flood Gate counter-weight Was Properly Positioned on 980124 + (ML18106A330)
- ML18106A331 + (ML18106A331)
- IR 05000272/1998002 + (ML18106A333)
- ML18106A336 + (ML18106A336)
- 05000311/LER-1998-001-01, :on 970705,failed to Meet TS 3.3.3.7 Table 3.3-11 Item 19 -RVLIS.Caused by Test Equipment Had Not Been Evaluated for Effect on Sys Operability.Installation of Isolators Has Been Included in Rev 5 + (ML18106A342)