Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18100B268 + (ML18100B268)
- ML18100B271 + (ML18100B271)
- 05000271/LER-1992-015, :on 920424,RCIC Sys Declared Inoperable When Sys Flow Controller Meter Indicated Approx 30 Gpm Flow W/ RCIC Not Operating.Caused by Setpoint Drift.Work Orders Initiated to Correct Meter Indication + (ML18100B276)
- 05000271/LER-1992-016, :on 920422,discovered That TS Quarterly Flow Test Not Performed During safety-related HVAC Sys Surveillance of Chilled Water Pump.Caused by Personnel Error.Procedure Re Ref Valves Revised + (ML18100B277)
- ML18100B279 + (ML18100B279)
- ML18100B280 + (ML18100B280)
- JPN-93-025, Forwards Revised Station Battery Capacity Calculations & Evaluation of Operator SBO Procedure for Agreement W/Numarc 87-00.EDG Reliability Program & Reg Guide 1.155 Will Be Implemented by 930930 + (ML18100B289)
- ML18100B293 + (ML18100B293)
- ML18100B295 + (ML18100B295)
- 05000275/LER-1994-014, :on 940426,SG 1-2 Automatically Started When Two Indicating Light Sockets Shorted Together Due to Personnel Error.Description of Event & Lessons Learned Will Be Published in Operations Incident Summary + (ML18100B298)
- ML18100B299 + (ML18100B299)
- 05000416/LER-2017-008, Failure to Perform/Document Diesel Generator Common Mode Failure Evaluations + (ML18100B300)
- ML18100B301 + (ML18100B301)
- ML18100B302 + (ML18100B302)
- GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control + (ML18100B304)
- ML18100B305 + (ML18100B305)
- RAIO-0418-59465, LLC Supplemental Response to NRC Request for Additional Information No. 198 (Erai No. 9068) on the NuScale Design Certification Application + (ML18100B306)
- ML18101A001 + (ML18101A001)
- ML18101A002 + (ML18101A002)
- ML18101A003 + (ML18101A003)
- ML18101A004 + (ML18101A004)
- ML18101A005 + (ML18101A005)
- ML18101A006 + (ML18101A006)
- ML18101A007 + (ML18101A007)
- ML18101A008 + (ML18101A008)
- ML18101A014 + (ML18101A014)
- IR 05000285/2018001 + (ML18101A018)
- ML18101A020 + (ML18101A020)
- ML18101A022 + (ML18101A022)
- ML18101A024 + (ML18101A024)
- ML18101A026 + (ML18101A026)
- ML18101A030 + (ML18101A030)
- NL-18-019, Relief Request Number IP2-ISI-RR-06 - Proposed Alternative to Use Reactor Vessel Head Penetration Flaw Weld Repair Method + (ML18101A032)
- 05000443/LER-2018-001, Re Pressurizer Safety Valve Outside of Technical Specification Limits Discovered During As-Found Set Point Testing + (ML18101A033)
- ML18101A034 + (ML18101A034)
- ML18101A035 + (ML18101A035)
- ML18101A042 + (ML18101A042)
- NL-18-0367, 1 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report, and Revised NRC Commitments Report + (ML18101A046)
- RA-18-0008, Response to Request for Additional Information Regarding Duke Energys Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installations (Isfsis) + (ML18101A058)
- ML18101A070 + (ML18101A070)
- ML18101A096 + (ML18101A096)
- ML18101A101 + (ML18101A101)
- ML18101A110 + (ML18101A110)
- ML18101A112 + (ML18101A112)
- ML18101A113 + (ML18101A113)
- ML18101A116 + (ML18101A116)
- ML18101A117 + (ML18101A117)
- ML18101A118 + (ML18101A118)
- ML18101A119 + (ML18101A119)
- ML18101A122 + (ML18101A122)
- IR 05000327/2018410 + (ML18101A132)