Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-97-169, Forwards ISI Rept Which Covers Insps Performed During Cycle 7 Operation,Including Refueling Outage 7,in First 10-year Insp Interval + (ML18022B023)
- ML18022B024 + (ML18022B024)
- ML18022B025 + (ML18022B025)
- HNP-97-168, Forwards Revised Epips,Including Rev 2 to PEP-260,rev 6 to PEP-250,rev 3 to PEP-110,rev 1 to PEP-230,rev 2 to PEP-240, Rev 3 to PEP-270,rev 2 to PEP-330,rev 3 to PEP-350 & Rev 8 to PEP-500 + (ML18022B026)
- HNP-97-184, Forwards Rev 31 to PLP-201, Emergency Plan, IAW 10CFR50, App E.Changes Incorporated by Rev Includes Five Listed Categories + (ML18022B029)
- ML18022B035 + (ML18022B035)
- HNP-98-017, Responds to RAI on Shearon Harris IPEEE Submittal,Dtd 971215.Rev 0 to C-007, CP&L Harris IPEEE: HCLPF Capacity Calculations for 1X-SAB CST Tank & 1X-SN RWST Tank, Encl + (ML18022B036)
- ML18022B041 + (ML18022B041)
- HNP-98-073, Special Rept:On 970719,declared Channel 751 of Digital Metal Impact Monitoring Sys Monitors Inoperable.Caused by Noise Originating in Channel 751 pre-amplifier/accelerometer Sensor Located in Containment.Channel 751 in Containment + (ML18022B042)
- ML18022B043 + (ML18022B043)
- ML18022B045 + (ML18022B045)
- HNP-98-072, Forwards Corrected License Amend 77 TS Pages 3/4 7-11 & B 3/4 0-2,inadvertently Not Included or Not Issued as Part of Subject License Amend + (ML18022B047)
- ML18022B049 + (ML18022B049)
- ML18022B050 + (ML18022B050)
- HNP-98-066, Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant + (ML18022B052)
- ML18022B053 + (ML18022B053)
- 05000400/LER-1998-005, :on 980420,TS Verbatim non-compliance Was Determined.Caused by Misinterpretation of TS Requirements. Issued Memo to Reemphasize Need to Comply W/Literal Meaning of TS Requirements in Verbatim Manner + (ML18022B055)
- ML18022B059 + (ML18022B059)
- ML18022B063 + (ML18022B063)
- IR 05000400/1999011 + (ML18022B065)
- ML18022B103 + (ML18022B103)
- ML18022B105 + (ML18022B105)
- ML18022B106 + (ML18022B106)
- IR 05000331/2017004 + (ML18022B111)
- ML18022B114 + (ML18022B114)
- ML18022B116 + (ML18022B116)
- IR 05000313/2017501 + (ML18022B130)
- IR 05000397/2017501 + (ML18022B133)
- ML18022B135 + (ML18022B135)
- IR 05000445/2017501 + (ML18022B137)
- PMNS20180076, Public Meeting with NuScale Involving NuScale Response to Request for Additional Information (RAI) 8738 + (ML18022B138)
- ML18022B145 + (ML18022B145)
- IR 05000298/2017501 + (ML18022B148)
- IR 05000483/2017501 + (ML18022B151)
- IR 05000275/2017501 + (ML18022B156)
- IR 05000416/2017501 + (ML18022B163)
- IR 05000528/2017501 + (ML18022B168)
- ML18022B210 + (ML18022B210)
- ML18022B213 + (ML18022B213)
- IR 05000518/1980002 + (ML18022B214)
- ML18022B216 + (ML18022B216)
- ML18022B217 + (ML18022B217)
- 05000321/LER-1981-068-03, /03L-0:on 810706,following Reactor Scram,Hpci Sys Auto Initiated,Tripped on High Reactor Water Level,Then Failed to Restart,Due to Failure of Turbine Stop Valve to Open.Caused by Overspeed Trip Sys Malfunction + (ML18023A001)
- ML18023A002 + (ML18023A002)
- ML18023A003 + (ML18023A003)
- ML18023A005 + (ML18023A005)
- ML18023A007 + (ML18023A007)
- ML18023A010 + (ML18023A010)
- ML18023A015 + (ML18023A015)
- ML18023A017 + (ML18023A017)
- ML18023A018 + (ML18023A018)