ML18023A002

From kanterella
Jump to navigation Jump to search
Forwards LER 81-068/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML18023A002


Forwards LER 81-068/03L-0.Detailed Event Analysis Encl
ML20010A261
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/04/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010A261 (2)
LER 81-068/03L-0:on 810706,following Reactor Scram,Hpci Sys Auto Initiated,Tripped on High Reactor Water Level,Then Failed to Restart,Due to Failure of Turbine Stop Valve to Open.Caused by Overspeed Trip Sys Malfunction
ML18023A001
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/04/1981
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18023A001 (4)