Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000400/LER-1997-005, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-03.Corrective Actions:Submitted LER 97-005-00 on 970317 & Reviewed Violation W/Individuals Involved to Ensure Understanding Re Identification of Reportable Conditions + (ML18012A793)
- ML18012A794 + (ML18012A794)
- 05000400/LER-1996-023, :on 961114,design Deficiency in EDG Protection Circuitry Was Identified.Caused by Inadequate Original Plant Design.Surveillance Test Procedures OST-1013 & OST-1073 Revised + (ML18012A795)
- ML18012A796 + (ML18012A796)
- HNP-97-114, Forwards Revised TS Pp B3/4 5-1,B 3/4 5-1a & B 3/4 5-2 Bases,Which Incorporates Changes from Amend 71,as Well as 970310 Proposed Changes + (ML18012A797)
- ML18012A798 + (ML18012A798)
- ML18012A799 + (ML18012A799)
- 05000400/LER-1997-012, :on 970505,determined That Previous Auxiliary Control Panel Had Not Verified Operability of Interposing Relays.Caused by Misinterpretation of Tss.Reviewed Other Remote Shutdown Panel Transfer Circuitry + (ML18012A801)
- ML18012A803 + (ML18012A803)
- ML18012A805 + (ML18012A805)
- ML18012A806 + (ML18012A806)
- 05000400/LER-1997-013, :on 970508,entry Into Mode-6 Without Operable Components,Resulting in TS 3.0.4 Violation Occurred.Caused by Personnel Error.Personnel Involved Counseled + (ML18012A808)
- HNP-97-100, Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f + (ML18012A810)
- ML18012A811 + (ML18012A811)
- ML18012A812 + (ML18012A812)
- ML18012A813 + (ML18012A813)
- ML18012A817 + (ML18012A817)
- IR 05000400/1997003 + (ML18012A818)
- ML18012A819 + (ML18012A819)
- IR 05000400/1997005 + (ML18012A821)
- IR 05000400/1997001 + (ML18012A822)
- ML18012A823 + (ML18012A823)
- 05000400/LER-1997-015, :on 970602,inadequate Auxiliary Feedwater Sys Flow Control Valve Surveillance Testing Deficiency Was Identified.Caused by Failure to Recognize Impact on TS 4.7.1.2.1.Readjusted AFW FCV Actuator Spring + (ML18012A824)
- HNP-97-133, Submits Emergency Preparedness Exercise Scope & Objectives 75 Day Submittal for Exercise Scheduled for 971007 + (ML18012A825)
- HNP-97-130, Forwards Proprietary List of SROs That Have Been Reassigned within Util from Position Which Util Previously Certified Need for SRO License.Termination of Licenses,Requested. Encl Withheld,Per 10CFR2.790(a)(6) + (ML18012A826)
- 05000400/LER-1997-017, :on 970612,failed to Recognize Inoperable Reactor Afd Monitor.Caused by Personnel Error.Operators Involved in Event Will Be Counseled Prior to Assuming Shift Duties + (ML18012A829)
- HNP-97-132, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:New Operations Mgt Team Has Been Put in Place & re-evaluation Was Also Conducted for Current Supervisory Assignments + (ML18012A831)
- HNP-97-142, Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant + (ML18012A832)
- PNO-II-97-040, on 970720,automatic Reactor Trip Occurred Due to Main Generator Lockout.Main Generator Lockout Caused by Loss of Generator Excitation Caused by Electrical Fault in Exciter.Afws Automatically Started as Expected + (ML18012A833)
- HNP-97-136, Notifies NRC of Schedule Change for Util Conversion to Improved Std TS for Hnp.Nrc License Amend Issuance Will Be Requested by July 2000 + (ML18012A834)
- HNP-97-149, Forwards LER 97-S01-00,describing Instances Involving Contract Outage Workers Being Inappropriately Granted Access at Plant During Refueling Outage 7 + (ML18012A835)
- ML18012A836 + (ML18012A836)
- ML18012A837 + (ML18012A837)
- ML18012A838 + (ML18012A838)
- ML18012A839 + (ML18012A839)
- ML18012A841 + (ML18012A841)
- ML18012A842 + (ML18012A842)
- HNP-97-147, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-01.Corrective Actions:Seven Doors Were Alarmed & Ten Doors Were Locked Requiring Operations Approval of Breach Request Prior to Blocking Open + (ML18012A843)
- ML18012A844 + (ML18012A844)
- HNP-97-152, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (ML18012A845)
- HNP-97-148, Submits Change in Schedule for Completion of Corrective Actions Made in Response to Violation Noted in Insp Rept 50-400/96-06 + (ML18012A846)
- 05000400/LER-1997-018, :on 970701,determined That Plant Procedures Had Not Received Proper Reviews & Approvals.Caused by Failure to Comply W/Plant Administrative Procedure AP-006.Counseled Involved Individuals + (ML18012A847)
- HNP-97-155, Forwards Proprietary Info Re Notification of Change in Reactor Operator Status.Encl Withheld Per 10CFR2.790(a)(6) + (ML18012A848)
- HNP-97-146, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/97-06.Corrective Actions:Compliance Was Achieved on 970608 W/Issuance of Operations Night Order + (ML18012A852)
- 05000400/LER-1996-013-02, Forwards LER 96-013-02 Per 10CFR50.73.Rev Reports Results of Addl Analysis That Was Performed to Determine Safety Consequences Associated W/Potential Loss of Ccws + (ML18012A853)
- ML18012A854 + (ML18012A854)
- 05000400/LER-1996-013, :on 961028,condition Outside of Design Basis Where RWST Had Been Aligned w/non-seismically Qualified Sys Was Identified.Caused by Failure to Reconcile Operating Procedure Lineups.Established Administrative Controls + (ML18012A855)
- 05000400/LER-1996-018-01, Forwards LER 96-018-01 Per 10CFR50.73.Rev Provides Addl Info Related to Cause of a Normal Svc Water Pump Trip That Occurred on 960903,following Loss of Running Normal Svc Water Pump + (ML18012A856)
- ML18012A857 + (ML18012A857)
- 05000400/LER-1996-018, :on 960903,manual Reactor Trip Occurred Due to Loss of Normal Sw.Caused by Mechanical Failure of B Water Pump & a Normal SW to Remain Running Once Manually Started.Restored a Normal SW Pump to Svc + (ML18012A858)
- HNP-97-161, Monthly Operating Rept for July 1997 for Shnpp + (ML18012A859)