r ACCESSION NBR:
FACIL:50-400 AUTH.NAME ROGERS,S.
DONAHUE,J.N.
RECIP.NAME CATEGORY, 1 REGULA I INFORMATION DISTRIBUTION ZSTEM (RIDS)
Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTHOR AFFILIATION Carolina Power s Light Co.
Carolina Power
& Light Co.
RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating rept for July 1997 for SHNPP.
970813 ltr.
D:STRISU'IION CODE:
IE24D COPIES RECEIVED:LTR II ENCL f
SIZE:
TITLE: Montnly Operating Report (per Tech Specs)
NOTES:Applicat,ion for permit renewal filed.
05000400 T
INTERNAL'ECIPIENT ID CODE/NAME PD2-1 PD FIL CENTE 01 D
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME ROONEY,V AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 G
'XTERN LITCO BRYCE IJ H
NRC PDR 1
1 1
1 NOAC 1
1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AUG 1 3 1997 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Serial: HNP-97-161 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power 0 Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report ofoperating statistics and shutdown experience for the month of July 1997 is provided.
Sin ly, J. W. Donahue Director of Site Operations Harris Plant SGR Enclosure c:
Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A.,Reyes - NRC Regional Administrator Mr. V. L. Rooney - NRC Project Manager h
9708200206 970781 PDR ADQCK 05000400 R
PDR lllllllllllllllllllllllllllllllllllllll
<Ooe07 5413 Shearon Harris Road New Hill NC
r
~
4 6
II I
h Enclosure to Serial HNP-97-161 Sheet l,of3 CP&L CO.
RUN DATE 08/07/97 RUN TIME 13:19:19 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1
RPD36"000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.
UNIT NAME:
HARRIS UNIT 1 NOTES 2.
REPORTING PERIOD:
JULY 97 3.
LICENSED THERMAL POWER (MWT):
2775 4.
NAMEPLATE RATING (GROSS MWE):
950.9 5.
DESIGN ELECTRICAL RATING (NET MWE):
900.0 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
MAX DEPENDABLE CAPACITY (NET MWE):
860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10.
REASONS FOR RESTRICTION IF ANY:
THIS MONTH YR TO DATE CUMUL ATIVE 11.
HOURS IN REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEN.
(MWH) 17.
GROSS ELEC.
ENERGY GEN (MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 744.00 610.18
.00 580.80
.00 1567597.50 512773.00 475450.00 78.06 78.06 74.31 71.01 21.94 5087.00 3416.65
'00 3315.93
.00 9009941.04 2999310.00 2787001.00 65.18 65.18 63.71 60.87 6.86 89856.00 74682.76
.00 73873.59
.00 197894274.30 65866562.00 61411740.00 82.21 82.21 79.47 75.94 3.49 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE,
- DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 1.16 9
Enclosure to Serial: HNP-97-161 Sheet 2 of3 CP&L CO.
PLANT PERFORMANCE DATA SYSTEM RUN DATE 08/07/97 APPENDIX B AVERAGE DAILY POWER LEVEL RUN TIME 13:19:22 HARRIS UNIT 1 PAGE 1
RPD39-000 JULY 1997 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362"2573 DAY AVG. DAILY POWER LEVEL (MWE-NET)
DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 15 16 857 855 846 848 852 854 852 854 853 854 857 860 856 853 850 853 17 18 19 20 21 22 23 25 26 27 28 29 30 31 855 851 851 73
-33
-28
-30
-30 311 832 847 859 865
J.
I
'P
Enclosure.tq Serial: HNP-97-1(11 Sheet 3 of 3.
UNITNAME:
Harris DATE:
08/0l/97 COMPLETED BY:S.G. Rogers TELEPHONE:
(919) 362-2573 REPORT MONTH UNITSHUTDOWNS AND POPOVER REDUCTION NUMBER 97406 DATE 970720 DURATION (HOURS) 163.20 REASON 2
METHODOF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORTS 97-19 SYSTEM CODE4 COMPONENT CODE 5 GENERA CAUSE AND CORRECTIVE ACflONTO PREVENT RECURRENCE Plant trip on 7/20/97 Q 02:56 caused by problem with the main generator exciter rotor. Plant sync to grid 7/26/97 IN22:08.
I F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8r, License Examination F-Administrative G&perational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation ofData Entry Sheets for Licensee Event Report (LER) File (NUREG4161) 5 Exhibit I - Same Source
J e
'L tl
\\
J hC'~yS-I
\\