ML18012A798

From kanterella
Jump to navigation Jump to search
Forwards Revised TS Pp B3/4 5-1,B 3/4 5-1a & B 3/4 5-2 Bases,Which Incorporates Changes from Amend 71,as Well as 970310 Proposed Changes
Date released: 08/31/2018 Download: ML18012A798


Proposed Tech Specs,Providing Retyped TS Pages Re Revised Action & Surveillance for ECCS Accumulators
ML18012A799
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/23/1997
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18012A799 (10)
Forwards Revised TS Pp B3/4 5-1,B 3/4 5-1a & B 3/4 5-2 Bases,Which Incorporates Changes from Amend 71,as Well as 970310 Proposed Changes
ML18012A797
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/23/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18012A797 (4)