Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000400/LER-1993-007-01, :on 930523,SUT to Auxiliary Bus E Supply Breaker 121 Failed to Open Automatically Due to Misaligned Mechanism Operated Cell Switch in Breaker 122.Insp of Other 6.9 Kv Breakers Performed + (ML18010B119)
- 05000400/LER-1993-008-01, :on 930525,TS Violation Occurred Due to Improper Wiring in Containment Penetration Current Limiting Breaker.C/As:Breaker Satisfactorily Tested Per MST-E0006 on 930618 + (ML18010B120)
- ML18010B123 + (ML18010B123)
- HNP-93-824, Notifies That WR Robinson,General Manager Has Been Authorized to Provide Certifications,Including Oath or Affirmation on Matters Relating to Plant + (ML18010B124)
- ML18010B127 + (ML18010B127)
- ML18010B128 + (ML18010B128)
- ML18010B129 + (ML18010B129)
- ML18010B130 + (ML18010B130)
- ML18010B131 + (ML18010B131)
- ML18010B132 + (ML18010B132)
- IR 05000400/1993008 + (ML18010B133)
- ML18010B134 + (ML18010B134)
- ML18010B136 + (ML18010B136)
- ML18010B137 + (ML18010B137)
- HNP-93-826, Application for Amend to License NPF-63,revising TS 3/4.2.1, 3/4.2.2,6.9.1.6 & Associated Bases Re Transition from Nuclear Fuel Supplied by Westinghouse to Nuclear Fuel Supplied by Siemens Power Corp Beginning W/Cycle 6 + (ML18010B140)
- ML18010B141 + (ML18010B141)
- ML18010B142 + (ML18010B142)
- ML18010B143 + (ML18010B143)
- 05000400/LER-1993-009-01, :on 930622,TS Violation Occurred Due to Axial Flux Difference Logging Error.Caused by Personnel Error. Individuals Involved Counseled & Afd Operations Surveillance Test OST-1070 Revised + (ML18010B144)
- ML18010B145 + (ML18010B145)
- HNP-93-821, Application for Amend to License NPF-63,proposing Changes Incorporating AFW Sys TS 3.7.1.2 Surveillance Subparagraph b.1 Revised Capabilities of AFW Initiation Signal + (ML18010B146)
- ML18010B147 + (ML18010B147)
- ML18010B148 + (ML18010B148)
- ML18010B149 + (ML18010B149)
- IR 05000400/1993014 + (ML18010B151)
- ML18010B152 + (ML18010B152)
- ML18010B154 + (ML18010B154)
- ML18010B156 + (ML18010B156)
- ML18010B157 + (ML18010B157)
- ML18010B159 + (ML18010B159)
- ML18010B160 + (ML18010B160)
- IR 05000400/1993015 + (ML18010B162)
- IR 05000400/1993011 + (ML18010B163)
- HNP-93-830, Forwards Response to GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Control Cluster Assemblies, Summarizing Compensatory Actions Taken in Response to Salem Rod Control Sys Failure Event + (ML18010B164)
- IR 05000400/1993003 + (ML18010B166)
- ML18010B167 + (ML18010B167)
- ML18010B171 + (ML18010B171)
- ML18010B172 + (ML18010B172)
- ML18010B195 + (ML18010B195)
- RAIO-0118-58116, LLC Supplemental Response to NRC Request for Additional Information No. 171 (Erai No. 9032) on the NuScale Design Certification Application + (ML18010B198)
- ML18011A006 + (ML18011A006)
- ML18011A010 + (ML18011A010)
- ML18011A011 + (ML18011A011)
- ML18011A013 + (ML18011A013)
- ML18011A014 + (ML18011A014)
- ML18011A025 + (ML18011A025)
- ML18011A027 + (ML18011A027)
- ML18011A035 + (ML18011A035)
- ML18011A037 + (ML18011A037)
- ML18011A040 + (ML18011A040)
- 05000306/LER-1917-003, Regarding Both Containment Spray Pump Control Switches in Pull-Out in Mode 4 + (ML18011A041)