Monthly Operating Rept for Jul 1993 for Harris Nuclear Plant,Unit 1
ML18010B167
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1993
From: Crenshaw A, Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
H0931025, H931025, NUDOCS 9308160182
Download: ML18010B167 (10)


Text

ACCEI ERA ED DOCUMENT DIST UTION SYSTEM.

REGUL RY INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9308160182 DOC.DATE: 93/07/31 NOTARIZED: NO DOCKET, 4 FAClL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.

.Carolina Power 6 Light.Co.

ROBIMNSON,W.R.

Carolina Power 6 Light Co.

R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jul 1993 for Harris Nuclear Plant, unit 1.W/930809 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

o5ooo4oo S

A RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL, 1

. 1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL: EG&G BRYCEiJ.H NSIC 10 10 1

1 1

1 1

1 1

1 1

1 AEOD/DOA NRR

-R

~ILE NRC PDR B

01 1

1 1

1 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-31 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRII3UTIOYi LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

I P

0

CME Carolina Power 8 Light Company HARRIS NUCLEAR PLANT P. 0.

Box 165 New Hill, North Carolina 27562 AUG 0 g iyyy File Number:

SHF/10-15505 Letter Number:

H0931025 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5, for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1993.

Yours very truly, W. R. Robinson General Manager Harris Nuclear Plant APC:dmw Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP) 9308160182 930731 PDR ADOCK 05000400 R

PDR

,MIS/MTH-OPR.RPT/1/OS4

C.

j a

(

I'l

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

050-400 Harris Unit 1 July 1993 Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100 percent Availability Factor for the referenced month.and a 99.16 percent Capacity Factor.

There were no significant power reductions.

There are 157 fuel assemblies in the reactor vessel and 963 spent fuel assemblies stored in the spent fuel pools.

515 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.

224 of the spent fuel assemblies are from CP&L's Robinson Plant.

MISKMTH-OPR.RPT/240S4

f 8

F

gQL CQ RUN DATE 08/05/93 RIJN TIME 11:11:29 LANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2868 2 ~

3.

5 4 6.

7 l 8.

UNIT NAHE:

HARRIS UNIT 1

NOTES REPORTING PERIOD:

JULY 93 I

LICENSED THERMAL POWER (MWT): 2775 See Operations Summary.

NAMEPLATE RATING (GROSS HWE): 950.9 I

DESIGN ELECTRICAL RATING (NET MWE): 900.0 HAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I

MAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

None.

9.

10.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET HWE):

None.

REASONS FOR RESTRICTION IF ANY:

N/A THIS MONTH YR TO DATE CUHUL ATIVE 32.

33.

f4.

35.

$ 6.

37.

18.

19.

20.

21.

22.

23.

24.

HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL'EACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.

(HWH)

GROSS ELEC.

ENERGY GEN.

(MWH)

NET ELEC.

ENERGY GENERATED (HWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.

FACTOR (USING HDC NET)

UNIT CAP.

FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 744.00 744.00

.00 744.00

.00 2063676.26 676851.00 634479.00 100.00 100.00 99.36 94.75

.00 (TYPE,

DATE, 5087.00 5060.41

.00 5048.45

.00 13846039.46 4657776.00 4371539.00 99.24 99.24 99.93 95.48

.00 AND DURATION 54792.00 44629.33

.00 44304.63

.00 117391124.90 39072617.00 36377235.00 80.49 80.49 77.20 73.77 3.6$

OF EACH):

25.

26.

None.

IF SHUTDOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF START UP:

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OPR.RPT/3/OS4 1.t6 9

/PAL CQ LANT PERFORHANCE DATA SYSTEH r RUN,DATE 08/05/93 API ENDIX B AVERAGE DAILY POWER LEVEL RIJN TINE 13:13:28 HARRIS UNIT 3

PAGE RPD39-009 JULY 1 993 DAY AVG. DAILY POWER LEVEL (HWE-NET) 858 858 DOCKET NO. 650-400 CONPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-NET) 855 855 20 853 854 856 855 852

$ 0 852 854 833 852 854 853 856 855 861 27 30 832 847 845 86) 1.36 8

MIS/MTH-OPR.RPT/4/OS4

V I

~

t 0

E f

4 I

E t

'l

,pl 1,