accEX.ERm OomMEm'ST m"<OX SYSTEM REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)
- ~'4
- FACIL 80-400 Shearon Harris Nucleai 'Power -Plant, Unit 1, Carolina 05000400 AUTH.HAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power 6 Light Co.
ROBINSON,W.R.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operat'r June 1993 for Harris Nuclear Plant, Unit 1
/930712'-'-
r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
D 05000400 i
RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 3
3 1
1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 D
D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 10 10 AEOD/DOA 1
1 NRR/j)QRSQOEAB 1
1
~ZN~~FP Ol 1
1 1
1 1
1 1
1 EXTERNAL: EGSG BRYCEgJ.H NSIC 1
1 1
1 NRC PDR 1
1 D
S A
D NOTE TO ALL"RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
Carolina Power 8 Light Company HARRIS NUCLEAR PLANT P. 0.
Box 165 New Hill, North Carolina 27562 I:JUL )
2 1993 File Number:
SHF/10-15505 Letter Number:
H0931023 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of June 1993.
Yours very truly, W.
R. Robinson General Manager Harris Nuclear Plant APC:smh Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. J.
E. Tedrow (NRC-SHNPP) 19009,V MIS/MTH-OPR.RPT/1/OS4 9307i90i22 930630 PDR ADQCN 05000400 R
r I
C l
E 1E V-
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
050-400 Harris Unit 1 June 1993 Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 100.06 percent Capacity Factor.
There were no significant power reductions.
There are 157 fuel assemblies in the reactor vessel and 929 spent fuel assemblies stored in the spent fuel pools.
481 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.
224 of the spent fuel assemblies are from CP&L's Robinson Plant.
MISXMTH-OPR.RPTQ2%0S4
CPbL CO RUN DATE 07/08/93 RUN TIME. 14:21:63 ANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2868 2 J 3 4 4.
5 k 6.
7 I 8.
UNIT NAME:
HARRIS UNIT 1
NOTES REPORTING PERIOD:
JUNE 93 LICENSED THERMAL POWER (MWT): 2775 I
NAMEPLATE RATING (GROSS MWE): 950.9 I
DESIGN ELECTRICAL RATING (HET MWE): 960.0 I
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 MAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: None.
10.
POWER LEVEL TO WHICH RESTRICTED IF ANY (HET MWE):
None.
REASONS FOR RESTRICTION IF ANY:
N/A THIS MONTH YR TO DATE CUMUL ATIVE 12.
13.
14.
$ 5.
<6.
17.
18.
20.
23.
22.
23.
24.
HOURS IH REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR OH LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEH.
(MWH)
GROSS ELEC.
ENERGY GEN.
(MWH)
HET ELEC.
ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.
FACTOR (USING MDC NET)
UNIT CAP.
FACTOR (USING DER HET)
UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS 726.00 720.00
.06 726.60
.00 3995216.12 659662.00 619596.66 166.66
$ 60.66 106.66 95.62
.00 (TYPE,
- DATE, 4343. 60 4336.41
.66 4364.45
.06 33778343.26 3980925.60 3737060.00 99.11 99.f1 366.66 95.61
.66 AND DURATION 54648.66 43885.31
.66 43366.63
.00 335329448.64 38395766.06 35742736.60 80.23 80.23 76.90 73.48 3.67 OF EACH):
25.
26.
IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 3.16-9 MIS/HTH-OPR.RPT/3/OS4
II 9
I I
4 PI 4
~ 4$
, II' jll Wl'i I
'4 4lj VII',
4 i
~
V jl I, V I I V
V II I
Pl II Il"4'l
,W 4 Ir W 4
'r I ~
V j
4 d
I II ll "
W I
j II II ill IIV '
I I,
I V
I 4 4
5 Ii rj 44'W V
W II f
~ CJ hL'GS RUN DATE e7xeSr93 RUN TIME. 14:21:02 t I
Pl ANT PERFORMANCE DATA SYSTEM APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 1
PAGE RPD39-000 JUNE DAY AVG. DAILY POWER LEVEL (MWE-NET) 868 DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362"2808 DAY AVG. DAILY POWER LEVEL (MWE-NET) 860 872 864 858 860 873 865 19 20 858 852 858 860 863 854 850 25 863 10 861 859 871 30 860 860 861 15 1.16 8
MIS/MTH-OPR.RPT/4/OS4
0 4>>
I
~
~
s
~'
II 4
I
~1 H