REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9308050058
DOC.DATE: 93/07/02
NOTARIZED: NO
ACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina
UTH.NAME
AUTHOR AFFILIATION
ERRELLI,D.M.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
ROBINSON,W.R.
Carolina
Power
& Light Co.
SUBJECT:
Forwards
insp rept 50-400/93-12
on 930515-0618
& notice of
violation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
DOCKET
05000400
05000400'
F
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRlL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
RES/HFB
ERNAL'G &G/BRYCE g J
~ H ~
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LE,N
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
M@"G ZXL
02
RGH2
FILE
01
'RC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
JUL -2
1993
Docket No.:
50-400
License No.:
Carolina
Power and Light Company
ATTN:
Mr.
W.
R. Robinson
Plant Manager
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165
Mail Zone:
1
New Hill, NC 27562
Gentlemen:
SUBJECT'OTICE
OF VIOLATION
(NRC INSPECTION REPORT
NO. 50-400/93-12)
This refers to the inspection
conducted
by J.
Tedrow of this office on
May 15 - June
18,
1993.
The inspection
included
a review of activities
authorized for your Harris facility.
At the conclusion of the inspection,
the
findings were discussed
with those
members of your staff identified in the
enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
We are particularly concerned
about the violation
involving an inoperable
containment electrical penetration
conductor
overcurrent protective device.
Your previous review of such devices
should
have revealed
the existing deficiencies.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions taken
and any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.-
In accordance
with 10 CFR 2.790, of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
9308050058
930702
ADOCK 05000400
PDR~
~Eo l
JUg -2
1993
Carolina
Power
and Light Company
2
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Original signed
by:
Floyd.S. Cantrell/for
David M. Verrelli, Chief
Reactor Projects
Branch 1
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
Mr.
W. S. Orser
Executive Vice President
Nuclear Generation
Carolina
Power
& Company
P. 0.
Box 1551 - Mail Code
CPB
12
Raleigh,
NC
27602
Mr. H.
W. Habermeyer,
Jr.
Vice President
Nuclear Services
Department
Carolina
Power
& Light Company
P. 0.
Box 1551
- Mail OHS7
Raleigh,
NC
27602
M. Hamby,
Manager
Regulatory Compliance
Harris Nuclear Project
P. 0.
Box 165
New Hill, NC
27562
H.
Ray Starling
Vice President
- Legal Department
Carolina
Power
and Light Co.
P. 0.
Box 1551
Raleigh,
NC
27602
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health
& Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
Ms. Gayle B. Nichols
Staff Counsel
SC Public Service
Commission
P. 0.
Box 11649
Columbia,
SC
29211
Carolina
Power
and Light Company
bcc w/encls:
H. Christensen,
RII
S. Vias, RII
N. Le,
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
Route 1,.Box 315B
New Hill, NC
27562
p
1993
RII:
07/] /93
I:D
HCh istensen