Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A240 + (ML17354A240)
- ML17354A241 + (ML17354A241)
- ML17354A242 + (ML17354A242)
- ML17354A243 + (ML17354A243)
- ML17354A244 + (ML17354A244)
- ML17354A245 + (ML17354A245)
- ML17354A247 + (ML17354A247)
- BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (ML17354A248)
- ML17354A249 + (ML17354A249)
- CNL-17-138, Plants Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (ML17354A250)
- ML17354A251 + (ML17354A251)
- ML17354A252 + (ML17354A252)
- ML17354A253 + (ML17354A253)
- ML17354A256 + (ML17354A256)
- L-83-115, Responds to 830106,14 & 0218 Ltrs by Confirming Agreements of 830223 Meeting That Util Will Suppl Fire Protection Proposals to Reflect Recent Work Showing Addl Compliance W/App R Requirements.Suppls to Be Submitted by 830408 + (ML17354A260)
- IR 05000250/1989029 + (ML17354A270)
- ML17354A272 + (ML17354A272)
- ML17354A273 + (ML17354A273)
- IR 05000250/1989053 + (ML17354A274)
- ML17354A275 + (ML17354A275)
- L-96-235, Forwards Util Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval, for Period from 941114 to 960407.Reload SE Summaries for Unit 3 Cycle 15,dtd 951013 & Unit 4 Cycle 16,dtd 960520 Also Provided + (ML17354A282)
- ML17354A283 + (ML17354A283)
- ML17354A284 + (ML17354A284)
- L-96-200, Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 + (ML17354A285)
- ML17354A286 + (ML17354A286)
- ML17354A287 + (ML17354A287)
- ML17354A290 + (ML17354A290)
- PNO-II-96-073, on 961018,Hurricane Lili Was Located in Vicinity of Plant.Licensee Has Completed Preparations for Hurricane.State of Fl Has Been Informed + (ML17354A292)
- PNO-II-96-073A, on 961018,Hurricane Lili Update Made.Tropical Storm Warning Discontinued for Fl Keys & Bay.Region II Continues to Monitor Hurricane Lili & Resident Inspectors Onsite to Monitor Licensee Activities + (ML17354A293)
- L-96-262, Forwards Uprated COLR for Turkey Point Unit 3 + (ML17354A294)
- ML17354A295 + (ML17354A295)
- ML17354A296 + (ML17354A296)
- ML17354A297 + (ML17354A297)
- L-96-266, Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4 + (ML17354A298)
- ML17354A299 + (ML17354A299)
- ML17354A301 + (ML17354A301)
- ML17354A303 + (ML17354A303)
- ML17354A304 + (ML17354A304)
- L-96-258, Forwards Response to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (ML17354A306)
- 05000250/LER-1996-010-01, :on 960924,manual Reactor Shutdown Occurred. Caused by Failed Rod Control Sys Regulation Card in 2AC Power cabinet.2AC Power Cabinet DC Power Supplies,Cabling & Connectors Checked + (ML17354A307)
- L-96-270, Forwards Response to GL 96-06, Assurance of Equipment Ooperability & Containment Integrity During Design Basis Accident Conditions + (ML17354A308)
- ML17354A310 + (ML17354A310)
- ML17354A312 + (ML17354A312)
- ML17354A314 + (ML17354A314)
- L-96-268, Forwards Response to NRC Bulletin 96-001, CR Insertion Problems + (ML17354A316)
- ML17354A318 + (ML17354A318)
- ML17354A319 + (ML17354A319)
- L-96-282, Informs That Several Plant Mods Have Been Completed to Support Thermal Power Uprate.Revised Descriptions in ERDS Data Point Library Encl + (ML17354A322)
- L-96-286, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML17354A323)
- 05000250/LER-1996-011-01, :on 961009,potential for Overpressurizing Post Accident Containment Vent Filter Housings Occurred.Caused by Improper Change Mgt.Monitoring Sys Operating Procedures Revised + (ML17354A326)
- L-96-279, Forwards Results of Use of Revised ECCS Evaluation Models to Support Implementation of TS Amendments 191/185 + (ML17354A327)