Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-94-144, Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.8.1.1.2e & 4.8.1.1.2f Re EDG Fuel Oil Testing Program + (ML17352A727)
- ML17352A728 + (ML17352A728)
- ML17352A729 + (ML17352A729)
- L-94-176, Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.7.1 & Associated Bases Which Address Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves + (ML17352A730)
- ML17352A731 + (ML17352A731)
- ML17352A732 + (ML17352A732)
- ML17352A735 + (ML17352A735)
- ML17352A737 + (ML17352A737)
- ML17352A738 + (ML17352A738)
- 05000250/LER-1994-001, :on 940119,three Surveillance Failures Were Caused by Failure of Solenoids to Change Position When de-energized.Changed Solenoid Valves from de-energize to Actuate to Energize to Actuate Configuration + (ML17352A739)
- L-94-181, Special Rept:On 940702,3A Emergency Diesel Generator Failed.Caused by Failure of Speed Switch Module.Module Replaced + (ML17352A742)
- ML17352A743 + (ML17352A743)
- ML17352A744 + (ML17352A744)
- ML17352A748 + (ML17352A748)
- ML17352A749 + (ML17352A749)
- IR 05000250/1994011 + (ML17352A752)
- ML17352A753 + (ML17352A753)
- IR 05000250/1994015 + (ML17352A755)
- L-94-199, Informs That Util Will Conduct Investigation Into Concerns Identified in NRC Through Util Nuclear Safety Speakout Program & Results of Investigation Will Be Forwarded by 940912 + (ML17352A759)
- ML17352A760 + (ML17352A760)
- L-94-148, Provides Update to NRC on Items Completed Re Util Cycle 14 Refueling Outage + (ML17352A761)
- L-94-119, Responds to NRC RAI Re Administrative Controls,Audit Frequencies & Implementation of GL 93-07 + (ML17352A762)
- ML17352A763 + (ML17352A763)
- ML17352A764 + (ML17352A764)
- ML17352A766 + (ML17352A766)
- IR 05000250/1994016 + (ML17352A770)
- L-94-205, Monthly Operating Repts for Jul 1994 for Turkey Point Units 3 & 4 + (ML17352A771)
- L-94-196, Confirms Completion of All design-basis Reviews,Analysis, Verifications,Tests & Insps Performed to Comply W/Items a Through H of GL 89-10,per GL 89-10 Item M + (ML17352A772)
- ML17352A773 + (ML17352A773)
- L-94-190, Forwards Turkey Point Plant Unit 3 1994 ISI Rept & FP&L Turkey Point Nuclear Plant Unit 3 Refueling Outage 1994 Siemens Power Corp Final Rept + (ML17352A774)
- ML17352A775 + (ML17352A775)
- ML17352A776 + (ML17352A776)
- ML17352A777 + (ML17352A777)
- ML17352A778 + (ML17352A778)
- ML17352A779 + (ML17352A779)
- ML17352A781 + (ML17352A781)
- IR 05000250/1994013 + (ML17352A782)
- ML17352A783 + (ML17352A783)
- L-94-207, Forwards Response to Request for Addl Info Re 10CFR50.59 Evaluation of RHR Flaw Indications + (ML17352A785)
- L-94-216, Informs That Util Does Not Have Any Candidates from Turkey Point Units 3 & 4 Scheduled to Participate in Generic Fundamentals Exam Section of Written Operator Licensing Exam Scheduled for 941005 + (ML17352A786)
- L-94-225, Responds to Violation Noted in Insp Repts 50-250/94-13 & 50-251/94-13.Corrective Actions:Ist Coordinator Reassigned to Another Position & Independent Review of Surveillance Scheduling Program Being Performed by FP&L QA Dept + (ML17352A788)
- L-94-221, Forwards Responses to NRC 940728 RAI Re Revs 26 & 27 of Radiological Emergency Plan.Reconfirms Earlier Determination That Changes Made in Revs 26 & 27 of Radiological Emergency Plan Do Not Decrease Effectiveness of Emergency Plan + (ML17352A789)
- ML17352A790 + (ML17352A790)
- L-94-226, Monthly Operating Repts for Aug 1994 for Turkey Point Units 1 & 2 + (ML17352A791)
- ML17352A792 + (ML17352A792)
- ML17352A793 + (ML17352A793)
- IR 05000250/1994017 + (ML17352A795)
- ML17352A796 + (ML17352A796)
- ML17352A797 + (ML17352A797)
- L-94-244, Informs That Licensee Will Conduct Investigation Into Concern Through Nuclear Safety Speakout Program + (ML17352A798)
- ML17352A801 + (ML17352A801)