Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17341A417 + (ML17341A417)
- IR 05000250/1981014 + (ML17341A420)
- L-81-330, Advises That Reactor Has Been Defueled Due to Outage for Steam Generator Repair.Equipment Will Be Tested Prior to Reload When Normal Surveillance Testing Frequency Will Be Resumed + (ML17341A422)
- ML17341A423 + (ML17341A423)
- ML17341A424 + (ML17341A424)
- L-81-343, Responds to NUREG-0737,TMI Action Plan Item II.k.3.5 Re Reactor Coolant Pump Automatic Trip in Event of Loca.Concurs W/Westinghouse Owners Group 810615 Proposal to Submit Trip Design After NRC Approval of Small Break Mode 1 + (ML17341A425)
- L-81-339, Outlines Westinghouse Topical Repts Re Evaluation of Effects of Asymmetric LOCA Loads as Applicable to Facility.Repts Are Part of Response to 780125 Info Request.Submittal Completes Util Planned Effort Re Task Action Plan A-2 + (ML17341A427)
- ML17341A428 + (ML17341A428)
- ML17341A429 + (ML17341A429)
- ML17341A430 + (ML17341A430)
- ML17341A431 + (ML17341A431)
- L-81-346, Advises That Procedure MRS 2.2.2 GEN-15 & Change 1 ,re Steam Generator Repair Channel Head Decontamination,Provided to Resident Inspector.Work Scheduled for 810817 + (ML17341A433)
- L-78-206, Forwards Info from Diesel Generator Questionnaire,In Response to NRC + (ML17341A434)
- L-81-345, Informs That Operator Shifts Will Be Limited to Two Shifts Approx 12-h Long for Transferring Spent Fuel from One Spent Fuel Pit to Other.Previous Shifts Were Limied to Three Shifts Approx 8-h Long + (ML17341A436)
- L-81-174, Responds to NRC Re Violations Noted in IE Insp Rept 50-250/81-01.Corrective Actions:Surveillance Area Redefined,Permanent Red Colored Floor Tiles Installed & Changes Made to Administrative Procedure 0103.2 + (ML17341A437)
- ML17341A439 + (ML17341A439)
- IR 05000250/1981001 + (ML17341A440)
- ML17341A442 + (ML17341A442)
- ML17341A446 + (ML17341A446)
- ML17341A448 + (ML17341A448)
- ML17341A449 + (ML17341A449)
- L-81-349, Advises That Dolan Farm Radiological Sample Shed Will Be Moved Approx 200 Yards Southeast.Present Location Has Left Shed Vulnerable to Repeated Acts of Vandalism.New Location Will Be within Weyerhauser Corp Security Area + (ML17341A450)
- L-81-357, Notifies That Proposed Changes to Radiological Effluent Tech Specs Submitted on 790417 Will Be Resubmitted by 811130.Tech Specs Will Include Changes in Equipment & Operating Conditions That Have Occured in Past 2 Yrs + (ML17341A451)
- ML17341A459 + (ML17341A459)
- ML17341A461 + (ML17341A461)
- ML17341A471 + (ML17341A471)
- L-81-331, Responds to NRC Re Deviations Noted in IE Insp Repts 50-250/81-12 & 50-251/81-12.No Proprietary Info. Corrective Actions:Containment Purge Exhaust Filters Changed & Preventive Maint Program Developed + (ML17341A474)
- ML17341A475 + (ML17341A475)
- ML17341A476 + (ML17341A476)
- IR 05000250/1981012 + (ML17341A477)
- IR 05000250/1981011 + (ML17341A479)
- L-81-324, Suppls 810630 Response to NRC Re Violations Noted in IE Insp Repts 50-250/81-11 & 50-251/81-11.Corrective Actions:Tech Spec Requirements Will Be Implemented within 60 Days & Semiannual Test of Fire Detectors Will Be Completed + (ML17341A481)
- IR 05000324/2017405 + (ML17341A482)
- ML17341A483 + (ML17341A483)
- L-81-300, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/81-13 & 50-251/81-13.Corrective Actions:Work Site Cleaned.No Proprietary Info + (ML17341A485)
- ML17341A486 + (ML17341A486)
- ML17341A488 + (ML17341A488)
- IR 05000250/1981013 + (ML17341A489)
- ML17341A490 + (ML17341A490)
- L-81-301, Forwards Public Version of Schedule to Revise Radiological Emergency Plan + (ML17341A492)
- ML17341A493 + (ML17341A493)
- L-81-309, Forwards Public Version of Emergency Plan Implementing Procedure 20107, Fire/Explosion Emergencies + (ML17341A495)
- ML17341A496 + (ML17341A496)
- L-81-374, Forwards Info Re Removal of Used Steam Generator Lower Assemblies from Unit 3 Containment Bldg Per Requirements of Special License Conditions,Section 9 of Amend 69 to DPR-31 & Amend 61 to DPR-41 + (ML17341A497)
- L-81-370, Forwards Annual Ground Water Monitoring Program,Summary Rept,Jul 1980-June 1981. Rept Suppls Facility Annual Nonradiological Environ Monitoring Rept Submitted on 810331 + (ML17341A498)
- ML17341A499 + (ML17341A499)
- ML17341A500 + (ML17341A500)
- L-81-373, Forwards Revision 4 to Security Plan.Revision Withheld (Ref 10CFR2.790) + (ML17341A501)
- ML17341A506 + (ML17341A506)
- L-81-372, Informs That Response to Safety Evaluation Re Environ Qualification of safety-related Electrical Equipment Will Be Submitted by 810905 + (ML17341A507)
- ML17341A508 + (ML17341A508)