JUL 1 5 tS81
Florida Power and Light Company
ATTN:
Dr.
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
jp @LE Co
Gentlemen:
Subject:
Report Nos
0-250/81-14
and 50-251/81-14
This refers to the routine safety inspection
conducted
by Mr . J . J . Blake of this
office on June
23-26,
1981,
of activities authorized
by
NRC Operating
License
Nos.
DPR-31 and DPR-41 for the Turkey Point facility and to the discussion
of our
findings held with Mr. J.
K. Hays,
Nuclear Plant Manager,
at the conclusion of
the inspection.
Areas
examined
during
the
inspection
and
our
findings
are
discussed
in th'
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations or deviations were disclosed.
We
have
examined
actions
you
have
taken with regard
to previously identified
enforcement matter s and unresolved items.
The status of these
items is discussed
in the enclosed report.
One
new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item will be examined during subsequent
inspections.
In accordance
with 10
CFR 2.790 of the Commission'
regulations,
a copy of this
letter and the enclosed
report will be placed in the
NRC's Public Document
Room.
If the report contains
any information that you believe to be exempt
from disclo-
sure
under
10
CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office by
telephone within ten days
from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days
from the date
of this letter
a written application to this office to withhold such information.
If your receipt of this letter has
been delayed
such that less
than
seven
days
are available for your review, please notify this office promptly so that
a
new
due date
may be established.
Consistent with section 2.790(b)( 1),
such applica-
tion must be accompanied
by an affidavit executed
by the owner of the information
which identifies the document or part thereof sought to be withheld,
and
a full
statement of the reasons
on the basis of which it is claimed that the information
should
be withheld from public disclosure.
This section further requires
the
statement
to address
with specificity the considerations
listed in 10
CFR 2.790-
l
(b)(4).
The information sought to be withheld shall
be incorpo'rated
as far as ~/
5i(
8i08040623 8i05i5
ADOCK 05000250
6
~I
vrk
Florida Power and Light Company
(UL I R 1981
possible
into
a
separate
part of the affidavit. If we do not hear
from you in
thi s regard within the specified periods
noted above,
the report will be placed
in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them'with you.
Sincerely,
~+/o~~
P. J. Kellogg, Acting Chief
Reactor Projects Branch ¹2
Division of Resident
and
Reactor Project Inspection
Enclosures:
Inspection Report Nos. 50-250/81-14
and 50-251/81-14
cc w/encl:
J.
K. Hays, Plant Manager
bcc w/encl:
NRC Resident Inspector
Central Files
Local Public Document
Room
Washington Public Document
Room
Nuclear Safety Information Center
Technical Information Center
Document Management
Branch
State of Florida
RI
e:ht
7/i
81
RII
7/i
81
RI
rphy
7/]z/81
RI I
g. AF&son
7/jP/81
RI I
PJK 1logg
7/ /1
4