ML17341A488
| ML17341A488 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/17/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML17341A484 | List: |
| References | |
| 50-250-81-13, NUDOCS 8109010485 | |
| Download: ML17341A488 (1) | |
Text
APPENDIX A NOTICE OF VIOLATION Florida Power and Light Turkey Point Docket No. 50-250 License No. DPR-31 As a result'f the inspection conducted on Apri 1 25, May 25,
- 1981, and in accordance with the Interim Enforcement Policy,'5 FR 66754 (October 7, 1980),
the following violation was identified.
Technical Specification 6.8. 1 requires implementation of written procedures and administrative'olicies that meet or exceed the requirement and recom-mendations of section 5. 1 of ANSI 18.7-1972 and USNRC Regulatory Guide 1.33.
Administrative Procedure 0103. 11, Housekeeping, requires that following maintenance under their cognizance, a supervisor or foreman will verify that the work site is clean and that all trash and debris has been removed from the area.
Contrary to the
- above, during facility tours of units 3
and 4 this inspection period, it was noted that maintenance supervisors failed to implement existing procedures to verify post'aintenance cleanliness in that:
1.
Debris consisting of several pieces of a replaced waste Gas Compressor were left on the floor of the Auxiliary Building hallway at the four foot elevation for several months after completion of the replacement compressor installation (December 1980 April 1981),
and I
2.
The defectiv'e valve 4-895L and an attached length of contaminated tygon tubing, were left on the floor of the Unit 4 spray pump room for several months after the replacement of the valve (May 1980 April 1981).
This is a Severity Level V Violation (Supplement I.F.).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause 'shown.
Under the authority of Section 182 of the Atomic Energy Act of
- 1954, as amended, this response shall be submitted under oath or affirmation.,
Date. JUN 1 7 ]98l r ~~<>q<>ggqg5 Si081+ 4 ppggg 05000250]
P DR/
', 6