Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291B102 + (ML17291B102)
- IR 05000903/2010014 + (ML17291B104)
- ML17291B105 + (ML17291B105)
- ML17291B106 + (ML17291B106)
- GO2-95-241, Monthly Operating Rept for Oct 1995 for WNP-2 + (ML17291B107)
- ML17291B110 + (ML17291B110)
- ML17291B112 + (ML17291B112)
- ML17291B113 + (ML17291B113)
- GO2-95-247, Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (ML17291B115)
- ML17291B116 + (ML17291B116)
- GO2-95-248, Forwards Rev 16 to Emergency Preparedness Plan + (ML17291B117)
- ML17291B118 + (ML17291B118)
- ML17291B119 + (ML17291B119)
- ML17291B122 + (ML17291B122)
- ML17291B123 + (ML17291B123)
- ML17291B127 + (ML17291B127)
- IR 05000397/1995026 + (ML17291B129)
- ML17291B133 + (ML17291B133)
- ML17291B135 + (ML17291B135)
- SBK-L-17170, Non-Proprietary Enclosure 1 to SBK-L-17156 + (ML17291B136)
- ML17291B137 + (ML17291B137)
- ML17291B139 + (ML17291B139)
- ML17291B140 + (ML17291B140)
- GO2-95-251, Responds to SALP Insp Rept 50-397/95-99 for Period 940401- 950902 + (ML17291B141)
- GO2-95-252, Submits Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor + (ML17291B142)
- ML17291B144 + (ML17291B144)
- ML17291B145 + (ML17291B145)
- ML17291B147 + (ML17291B147)
- IR 05000397/1995098 + (ML17291B149)
- GO2-95-254, Washington Public Power Supply Sys Annual Rept 1995. W/ + (ML17291B150)
- ML17291B151 + (ML17291B151)
- GO2-95-264, Monthly Operating Rept for Nov 1995 for WNP-2 + (ML17291B154)
- ML17291B156 + (ML17291B156)
- ML17291B157 + (ML17291B157)
- ML17291B159 + (ML17291B159)
- GO2-95-268, Forwards Rev 9 to Procedure Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii, Per NUREG-0619 + (ML17291B160)
- ML17291B161 + (ML17291B161)
- ML17291B162 + (ML17291B162)
- ML17291B163 + (ML17291B163)
- GO2-95-269, Responds to NRC Re Violation Noted in Insp Rept 50-397/95-30 on 950925-28.Corrective Actions:Door C-115 & Similar Doors Modified to Incorporate Fixed Hasps Through Which Padlocks Used to Lock Doors + (ML17291B164)
- IR 05000397/1995020 + (ML17291B165)
- GO2-95-272, Responds to NRC Re Violations Noted in Insp Rept 50-397/95-29.Corrective Actions:Valve Tested & Degraded. Exercising Frequency for RCIC-V-28 Increased from Weekly to daily.RCIC-V-28 Replaced W/Swing Type Check Valve + (ML17291B166)
- GO2-95-271, Forwards Second 10-Yr ISI Program Plan Relief Request for Exam Category B-F + (ML17291B167)
- GO2-95-283, Provides Supplemental Info Re Water Level Calculation in Retran Model + (ML17291B168)
- GO2-95-274, Withdraws Request for Amend to TS to Relocate Component Lists in Accordance W/Gl 91-08 & Selected Implementation of Commissions Policy Statement on TS Improvements + (ML17291B169)
- GO2-95-275, Forwards Proposed Alternative Exams for 10CFR50.55a(g)(6), Augmented Exam of Rv & Requests That Proposed Alternate to 10CFR50.55a(g)(6) Be Accepted as Revised Relief Request 2-ISI-001 for First 10-yr ISI Interval + (ML17291B170)
- ML17291B171 + (ML17291B171)
- GO2-95-277, Reactor Power Uprate Startup Test Rept, for WNP-2 + (ML17291B175)
- GO2-95-281, Provides Suppl Info Re Relief Request for Temporary non-code Repair of Standby Svc Water Piping,Per GL 90-05 + (ML17291B177)
- GO2-95-282, Requests Approval for Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping + (ML17291B178)
- ML17291B179 + (ML17291B179)