Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1995028 + (ML17291B077)
- 05000397/LER-1995-009, :on 950907,unexpected Closure of Inboard & Outboard MSIV Occurred During Performance of Surveillance Test.Caused by Activity Performed Under Procedure That Did Not Define Necessary Steps.Updated Procedure + (ML17291B078)
- GO2-95-212, Requests Approval to Revise Tornado Design Criteria + (ML17291B079)
- ML17291B080 + (ML17291B080)
- ML17291B082 + (ML17291B082)
- ML17291B085 + (ML17291B085)
- ML17291B086 + (ML17291B086)
- SBK-L-17169, 8 - Non-Proprietary Enclosure 1 to SBK-L-17155 + (ML17291B087)
- GO2-95-221, Responds to GL 95-07 & Provides Requested Info Re Implementation Actions & Completion Schedule + (ML17291B088)
- 05000397/LER-1995-011, :on 950919,failed to Comply W/Ts SR for RCIC Sys Due to Analysis Deficiency That Resulted in Inadequate Surveillance Test Procedure.Surveillance Procedure Revised to Correct Deficiency + (ML17291B089)
- ML17291B090 + (ML17291B090)
- GO2-95-227, Notifies That on 951009,State of Wa Energy Facility Site Evaluation Council Approved Renewal of Facility NPDES Permit for five-yr Term.Renewed Permit WA-002515-1 Encl + (ML17291B091)
- GO2-95-228, Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys + (ML17291B092)
- ML17291B093 + (ML17291B093)
- ML17291B094 + (ML17291B094)
- GO2-95-235, Forwards Final Response to rev1,suppl 1 of GL 92-01, Reactor Vessel Structural Integrity + (ML17291B095)
- GO2-95-234, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-397/95-26.Corrective Actions:Performed Independent Verification of Valves Manipulated During Performance of PPM 7.4.3.3.1.53 + (ML17291B097)
- GO2-95-238, Special Rept:On 951026,RB Effluent Monitoring Sys Inoperable for 72 H Due to Failure of Mid Range Stack Monitor.Cryostat Cooling Assemblies for Mid & High Range Stack Monitors Returned to Vendor for Refurbishment + (ML17291B098)
- ML17291B099 + (ML17291B099)
- ML17291B101 + (ML17291B101)
- ML17291B102 + (ML17291B102)
- IR 05000903/2010014 + (ML17291B104)
- ML17291B105 + (ML17291B105)
- ML17291B106 + (ML17291B106)
- GO2-95-241, Monthly Operating Rept for Oct 1995 for WNP-2 + (ML17291B107)
- ML17291B110 + (ML17291B110)
- ML17291B112 + (ML17291B112)
- ML17291B113 + (ML17291B113)
- GO2-95-247, Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (ML17291B115)
- ML17291B116 + (ML17291B116)
- GO2-95-248, Forwards Rev 16 to Emergency Preparedness Plan + (ML17291B117)
- ML17291B118 + (ML17291B118)
- ML17291B119 + (ML17291B119)
- ML17291B122 + (ML17291B122)
- ML17291B123 + (ML17291B123)
- ML17291B127 + (ML17291B127)
- IR 05000397/1995026 + (ML17291B129)
- ML17291B133 + (ML17291B133)
- ML17291B135 + (ML17291B135)
- SBK-L-17170, Non-Proprietary Enclosure 1 to SBK-L-17156 + (ML17291B136)
- ML17291B137 + (ML17291B137)
- ML17291B139 + (ML17291B139)
- ML17291B140 + (ML17291B140)
- GO2-95-251, Responds to SALP Insp Rept 50-397/95-99 for Period 940401- 950902 + (ML17291B141)
- GO2-95-252, Submits Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor + (ML17291B142)
- ML17291B144 + (ML17291B144)
- ML17291B145 + (ML17291B145)
- ML17291B147 + (ML17291B147)
- IR 05000397/1995098 + (ML17291B149)
- GO2-95-254, Washington Public Power Supply Sys Annual Rept 1995. W/ + (ML17291B150)
- ML17291B151 + (ML17291B151)