Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290B270 + (ML17290B270)
- PNP 2017-062, Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report + (ML17291A006)
- ML17291A008 + (ML17291A008)
- ML17291A009 + (ML17291A009)
- ML17291A039 + (ML17291A039)
- ML17291A045 + (ML17291A045)
- ML17291A052 + (ML17291A052)
- ML17291A081 + (ML17291A081)
- ML17291A104 + (ML17291A104)
- ML17291A106 + (ML17291A106)
- ML17291A112 + (ML17291A112)
- GO2-94-130, Monthly Operating Rept for May 1994 for WNP-2 + (ML17291A113)
- GO2-94-128, Informs of Completion of Updated Ipe,Including Review Comments.However,Addl Mgt Review Will Allow More Effective Implementation of IPE Recommendations & Insights,Therefore, Supply Sys Will Submit IPE by 940727 + (ML17291A115)
- ML17291A116 + (ML17291A116)
- GO2-94-134, Forwards Proprietary Overhead Slides to Be Presented During Meeting W/Nrc Staff.Encl Withheld (Ref 10CFR2.790(b) + (ML17291A117)
- 05000397/LER-1993-001, :on 930213,determined That Both Trains of SPC of RHR System Were Inoperable Due to LOP Coincident W/Lpci Safety Function.Reviews & Safety Evaluations Has Been Enhanced + (ML17291A121)
- GO2-94-135, Transmits Results of Exam & Evaluation of Flaw in Recirculation Piping Weld 20RRC(6)-8,per GL 88-01 & Results of Evaluation of Nascrac Methodology,In Response to 930611 Request Re Review of Insp Rept on Flaw in Subj Piping + (ML17291A123)
- ML17291A127 + (ML17291A127)
- ML17291A129 + (ML17291A129)
- ML17291A130 + (ML17291A130)
- ML17291A132 + (ML17291A132)
- ML17291A134 + (ML17291A134)
- ML17291A135 + (ML17291A135)
- ML17291A137 + (ML17291A137)
- ML17291A138 + (ML17291A138)
- ML17291A140 + (ML17291A140)
- ML17291A141 + (ML17291A141)
- IR 05000397/1994002 + (ML17291A142)
- IR 05000397/1994012 + (ML17291A143)
- GO2-94-141, Responds to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers + (ML17291A144)
- ML17291A145 + (ML17291A145)
- ML17291A148 + (ML17291A148)
- ML17291A150 + (ML17291A150)
- ML17291A151 + (ML17291A151)
- ML17291A152 + (ML17291A152)
- ML17291A153 + (ML17291A153)
- GO2-94-144, Requests to Amend TS to Support Hydrostatic Testing + (ML17291A154)
- ML17291A155 + (ML17291A155)
- ML17291A156 + (ML17291A156)
- GO2-94-143, Informs of Change of Address for License Operator Eb Mcgowan + (ML17291A157)
- PNO-IV-94-034, on 940622,licensee Placed Steam Separator on Top of Reactor Core as Part of Ongoing post-refueling Reactor Vessel Reassembly.Licensee Suspended Reassembly Activities.State of Wa Informed + (ML17291A158)
- ML17291A159 + (ML17291A159)
- ML17291A161 + (ML17291A161)
- IR 05000397/1994014 + (ML17291A164)
- GO2-94-142, Forwards Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Correction to Cycle 10 & List of Reused Channels,Assemblies & Projected EOC 10 Exposures + (ML17291A165)
- 05000397/LER-1994-005, :on 940326,control Rod Failed to Scram Due to Degradation of Pilot Valve Elastomers.Caused by Inservice Aging.Scram Time Tests Performed Weekly of Operable Control Rods & SSPVs Replaced + (ML17291A166)
- ML17291A167 + (ML17291A167)
- ML17291A169 + (ML17291A169)
- ML17291A172 + (ML17291A172)
- ML17291A173 + (ML17291A173)
- GO2-94-148, Forwards Description of Three 1994 Refueling Outage Restart Issues & Util Plans to Resolve Issues Prior to Restart + (ML17291A177)