FORD 1
REGULATORY INFORMATiON DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9406290146
DOC.DATE: 94/06/23
NOTARIZED: NO
DOCKET I
FACIL:50-397
WPPSS Nuclear Project,
Unit 2, Washington Public
Powe
05000397
t
~AUTH.NAME
AUTHOR AFFILIATION
EACH,A.B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards
insp rept 50-397/94-14
on 940402-0514
& notice of
violation.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTRl ENCL J
SIZE: S + ~CA
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PDIV-3 PD
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS3
RES/HFB
RNAL
EG&G/BRYCEI J
~ H ~
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/PMAS/IRCB-.E
OE DIR
~~R'EG FILE~
0 2
~-RGN4
- 'ILE
01
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
~ NOTE TO JILL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOhI P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAhIE FROh< DISTRIBUTION
LISTS I OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
4~
.
~
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
JUN 23 l994
Docket:
50-397
License:
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Assistant
Hanaging
Director for Operations
3000 George
Way
P.O.
Box 968,
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/94-14
This refers to the inspection
conducted
by Mr.
R.
C. Barr,
and the inspectors
identified in the enclosed
report, of this office on April 2 through
Hay 14,
1994.
This inspection
included
a review of activities authorized for your
Washington Nuclear Project
2.
At the conclusion of the. inspection,
the
,findings were discussed
with you and those
members of your staff identified in
the enclosed report.
Areas
examined during this inspection
are described
in the enclosed
inspection
report,
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
These violations concerned
your failure to adhere to
procedures
for refueling
and for the control of compressed
gas cylinders
and
your failure to provide effective corrective actions for erratic recirculation
flow control valve operation.
The failure to restrain
compressed
gas
cylinders
was
a repeat violation that
NRC inspectors first identified in
NRC
Inspection
Report 50-397/93-50.
These violations reinforce the need for
Supply System
management
to continue efforts to assure
procedure
adherence
in
your future activities.
An additional violation concerned
the failure to
provide
an adequate
procedure for refueling operations
in that
an error in the
Nuclear
Component Transfer List allowed
a fuel bundle to be misoriented.
This
violation is not being cited because
the criteria of paragraph
VII.B of
Appendix
C to
10 CFR Part 2 of the
NRC's "Rules of Practice,"
were satisfied.
We are concerned
about the problems which you experienced
during the conduct
of refueling activities
and the circumstances
involved in the trip of the
These
problems resulted
from weaknesses
in your processes
that included:
(1) inadequate
communication
and coordination within and
between organizations,
(2) inadequate
independent
supervisory oversight
and
verification of activities,
and
(3) personnel
not adhering to procedures.
We
9406290146
940623
ADOCK 05000397
6
Washington Public
Power Supply
System
-2-
acknowledge your efforts to preclude
these- situations;
however,
we urge you to
continue those efforts with an
e'ven greater
sense of purpose
and self-critical
behavior.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspection,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
The response
directed, by this letter and the accompanying
notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork
Reduction Act of 1980,
Pub.
L.96-511.
Shouad
you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
W A. Bill Beach, Director
Division of Reactor Projects
Enclosures:
l.
Appendix
2.
Appendix
B -
NRC Inspection
Report w/attachment
cc w/enclosures:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
G.
E,
C.
Doupe,
Esq.
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Warren Bishop,
Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply
System
-3-
Washington Public Power Supply System
ATTN: ,H. K. Kook,
WNP-2 Licensing Hanager
P.O.
Box 968,
HD PE20
Richland;
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Regulatory
Programs
Hanager
P.O.
Box 968,
(Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser
99350-01""
Winston
8 Strawn
ATTN:-
H.
H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
JUN 2 3 l994
E-Mail to:
D. Sullivan
(DJS)
D. Kirsch
(DFK)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
K. Perkins,
WCFO
D. Kirsch,
WCFO
A. Bill Beach,
(D:DRP)
Leah Tremper,
OC/LFDCB,
MS:
MNBB 4503
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
J. Clifford (NRR)
G. Cook,
WCFO
RI:SRI: WCFO
RCBarr
6/I /94
PI:WCFO
DECor orand
6/1/94
C:DRP
E
DFKirsch
6/1'794
D:WC 0
n
KEPerkins
6/2/94
D:DRP
ABBeac
6/S/94
Washington Public Power Supply
System
JUN 2 3 l994
E-Hail to:
D. Sullivan
(DJS)
D. Kirsch (DFK)
bcc to
DMB (IE01) ) y
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
K. Perkins,
WCFO
D. Kirsch,
WCFO
A. Bill Beach,
(D:DRP)
Leah Tremper,
OC/LFDCB, HS:
HNBB 4503
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
J. Clifford (NRR)
G. Cook,
WCFO
RI:SRI: WCFO
RCBarr
PI:WCFO'ECor
orand
C:DRP
E
DFKirsch
D:WC 0
/7
D:DRP
KEPerkins
ABBeac
6/I /94
6/1/94
6/I'794
6/2/94
6/g/94