Wp0 gy I
Q) 0 C
0
+a*++
t UNITED STATES t
NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 JUN 20 l994 NOTICE OF LICENSEE MEETING Name of Licensee:
Name of Facility:
Docket No.:
50-397 EA:
94-092 Washington Public Power Supply System Washington Nuclear Project 2
(WNP-2)
Date and Time of Meeting:
June 30, 1994 9:30 a.m.
(CDT)
Location of Meeting:
Region IV office, Arlington, Texas Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
Other Attendee:
Enforcement conference regarding the failure to take adequate corrective action in response to deterioration of the scram pilot solenoid valves and failure to follow procedures L. Callan, Regional Administrator A. Beach, Director, Division of Reactor Projects K. Perkins, Director, Walnut Creek Field Office T. quay, Director, Project Directorate V,
NRR H. Ornstein, Senior Reactor Systems
- Engineer, AEOD D. Kirsch, Chief, Project Branch E
W. Brown, Regional Counsel F.
- Huey, Enforcement Officer, WCFO R. Barr, Senior Resident Inspector W. Counsil, Managing Director J. Parrish, Assistant Managing Director for Operations P.
- Bemis, Manager, Regulatory Programs J. Swailes, Plant Manager R. Webring,
- Manager, Support Services J. Gearhart, Director, equality Assurance H. Flasch, Director, Engineering D. Giroux, System Engineer J. Lasalle, Materials Engineer R. Noyes,
- Manager, Engineering Programs H.
Reddemann,
- Manager, Technical Services Division J, Zeller, Washington State Energy Facility Site Evaluation Council NOTE:
(1)
Due to the subject matter and nature of this meeting, this meeting is not open to attendance by members of the general public.
qgPg280015
++06>0>97 PDR ADOCK 050 Q
Washington Public Power Supply System (2)
NRC personnel, not listed above, that desire to attend this meeting should notify D. F. Kirsch at (510) 975-0290 by COB on June 27.
Approved By:
eac
>rector Division of Reactor Projects
Washington Public Power Supply System Distribution:
E-Mail to:
CJG (Carol Gordon)
DMKl (D. H. Kunihiro)
GNC (G.
N. Cook)
NRC. Attendees p'.DMB (IE 45)
J.
L. Hilhoan, DEDR (HS 17G21)
H. L. Thompson, DEDS (MS 17G21)
W. T. Russell, D/NRR (MS 12D1)
A. C. Thadani, ADT/NRR (MS 12G18)
L. A. Reyes, ADP/NRR (MS 12D9)
J.
Lieberman, D/OE (HS 7H5)
L. J. Chandler, OGC (MS 15B18)
J. Clifford, Project Manager, NRR (MS 13E16)
OEDO RIV Coordinator (MS 17G21)
J.
M. Montgomery, DRA G.
F. Sanborn, EO C. A. Hackney,
- RSLO, RIV J.
T. Gilliland,
L. S.
Ousley RIV File Senior Resident Inspector Washington Public Power Supply System ATTN:
J.
Y. Parrish, Assistant Managing Director for Operations 3000 George Washington Way P.O.
Box 968, MD 1023
- Richland, Washington 99352 Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968, MD 927M
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
G.
E.
C.
- Doupe, Esq, 3000 George Washington Way P.O.
Box 968, MD 396
- Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Warren Bishop, Chairman P.O.
Box 43172 Olympia, Washington 98504-3172
Washington Public Power Supply System Distribution:
E-Mail to:
CJG (Carol Gordon)
DMK1 (D.
M. Kunihiro)
GNC (G.
N. Cook)
NRC Attendees DMB (IE 45)
J.
L. Hilhoan, DEDR (MS 17G21)
H. L. Thompson, DEDS (HS 17G21)
W. T, Russell, D/NRR (MS 12D1)
A. C. Thadani, ADT/NRR (MS 12G18)
L. A. Reyes, ADP/NRR (MS 12D9)
J.
Lieberman, D/OE (HS 7H5)
L. J. Chandler, OGC (MS 15B18)
J. Clifford, Project Manager, NRR (MS 13E16)
OEDO RIV Coordinator (MS 17G21)
J.
M. Montgomery, DRA G,
F, Sanborn, EO C. A. Hackney,
- RSLO, RIV J.
T. Gilliland, PAO, RIV RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP, WCFO)
L. S. Ousley RIV File Senior Resident Inspector Washington Public Power Supply System ATTN:
J.
V. Parrish, Assistant Managing Director for Operations 3000 George Washington Way P.O.
Box 968, HD 1023
- Richland, Washington 99352 Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968, HD 927H
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
G.
E.
C.
- Doupe, Esq.
3000 George Washington Way P.O.
Box 968, MD 396
- Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Warren Bishop, Chairman P.O.
Box 43172 Olympia, Washington 98504-3172
Cg Washington Public Power Supply System Washington Public Power Supply System ATTN:
H. K. Kook, WNP-2 Licensing Manager P.O.
Box 968, MD PE20
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
P.
R. Bemis, Regulatory Programs Manager P.O.
Box 968, (Mail Drop PE20)
- Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190
- Prosser, Washington 99350-0190 Winston
& Strawn ATTN:
M. H. Philips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
Washington Public Power Supply System JUN 20 l994 RIV:C:DRP/E DKirsch;df 6/2/94 D:WCFO KEPerkins 6/3/94 PAO-g RSLO~
D' JTGi'I iland CAHackney A
B 6/( l/94 6/+i/94 6/gg/94