GO2-94-130, Monthly Operating Rept for May 1994 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1994 for WNP-2
ML17291A113
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-130, NUDOCS 9406090113
Download: ML17291A113 (7)


Text

ACCELERANT+ DOCUMENT DISTRIBUTION SYSTEM

~ ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

" DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public.Powe 05000397 AUTH.NAME AUTHOR AFFILXATXON EMBREE,D.G.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System I

RECIP.NAME RECIPIENT AFFILIATION D

SUBJECT:

Monthly operating rept for May 1994 for WNP-2.

940603 DXSTRIBUTION CODE:

IE24D COPIES RECEIVED:LTRj ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Speds)

NOTES:

'S RECIPIENT ID CODE/NAME PDIV-3 PD INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN4 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECXPIENT ID CODE/NAME CLIFFORD,J AEOD/DOA DORSJOEAB REG LE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE} CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL,NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 21 D

/

ff J

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bax 96'8 ~ 3000 George Wasbtngton Way ~ Richland, 1Wasbtngton 993524968

~ (509) 372-5000

~ un 3, i994

<G02-94-"130 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MAY1994 Transmitted herewith is the Monthly Operating Report for the month of May, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, c~f,A G. O. Smith Operations Division Manager (MD 9270)

GOS:DGE CC; Mr. W.H. Lovelace, NRC, Washington, DC Mx. K.E. Perkins, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (927N)

Mr. J.T, Wheelock, INPO Mr. C. Bergesen, UtilityData Institute Mr. J.T. Irish, BPA (399) 9406090113 940531 PDR ADOCK 05000397 PDR

s,),')P

'I g

1>

6

<Nll hg "I I,

OPERATING STATUS REPORT for WNP-2 Date:

June 1, 1994 2.

3.

4.

5.

6.

7.

3323 1200.9 1120 1132 1086 n/a Docket:

50-397 Reporting Period; MAY 1994 Outage + On-Line Hours:

744.0 UtilityContact:

David G. Embree (509) 377-,8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur abc. e s'.nce hst

."epoit, gi.e reasons:

10.

Power to which restricted, ifany (Net MW,):

Reasons for restrictions, ifany:

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MVH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity.,Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 0.0 0.0 0.0 0.0 0

0

- 6,198 0.0%

0.0%

0.0%

0.0%

0.0%

0.0 YEAR 3,623.0 2,769.2 0.0 2,769.2 0.0 8,330,944 2,846,410 2,720,965 76.4%

76.4%

69.2%

67.1%

3.0%

85.8 CUMULATIVE 82,951.2 58,879.4 340.4 56,836.2 381.7 167,092,250 56,158,620 53,806,350 68.5%

69.0%

59.4%

58.8%

12.3%

7,971.1 26.

27.

Shutdowns scheduled over the next 6 months (type, date, duration):

Annual Refueling Outage, April30, 1994, about 60 days.

Ifcurrently shutdown estimated startup date:

June 29, 1994 Note:

Cumulative Unit Capacity Factors (MDC 8I, DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

MAY1994 DOCKET NO.:

50-397 UNIT:

WNP-2 DATE:

June 1, 1994 COMPLETED BY:

D. G. Embree TELEPHONE:

(509) 377-8448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)

, AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14

-14

-14

-12

-8

-8

-7

-8

-8

-8

-7 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

-7

-7

-8

-8

-8

-9

-9

-9

-8 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 Fo line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

MAY 1994 DOCKET NO.:

50-397 UNIT NAME:

WNP-2 DATE:

June 1, 1994 COMPLETED BY:

D.G. EmSree TELEPHONE:

(509) 3774448 C

No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9443 April30 S

744.0 C

RC FUELXX Plant officiallyentered the annual refueling outage (R-9) on April30.

SUMMARY

WNP-2 was in the annual refueling and maintenance outage (R-9) for the entire month.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREGW161 Exhibits F &H