Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17289A475 + (ML17289A475)
- GO2-92-088, Application for Amend to License NPF-21,revising TS 3/4.4.6 to Relocate fluence-dependent Pressure/Temp Limits to Pressure/Temp Limits Rept,In Ref to Generic Ltr 88-16, Removal of Cycle-Specific Parameter Limits from Tss + (ML17289A476)
- ML17289A478 + (ML17289A478)
- ML17289A479 + (ML17289A479)
- ML17289A480 + (ML17289A480)
- IR 05000397/1992004 + (ML17289A482)
- GO2-92-089, Advises That Effective 920214,JV Parrish Was Appointed to Assistant Managing Director for Operations,Replacing AL Oxsen + (ML17289A483)
- ML17289A486 + (ML17289A486)
- ML17289A488 + (ML17289A488)
- ML17289A490 + (ML17289A490)
- ML17289A491 + (ML17289A491)
- IR 05000397/1991046 + (ML17289A492)
- GO2-92-082, Monthly Operating Rept for Mar 1992 for Washington Public Power Supply Nuclear Plant 2 + (ML17289A493)
- GO2-92-105, Corrects Info Re Cutoffs for Cocaine & Amphetamines Described in Performance Data Rept for Jul-Dec 1991, Transmitted Via Util + (ML17289A494)
- ML17289A495 + (ML17289A495)
- IR 05000397/1992011 + (ML17289A497)
- GO2-92-100, Forwards Washington Nuclear Plant - 2 Licensed Operator Requalification Program Corrective Action Plan,Resolution Documentation, in Response to NRC 920402 Request + (ML17289A501)
- ML17289A502 + (ML17289A502)
- ML17289A503 + (ML17289A503)
- GO2-92-111, Requests Extension of Operator Licensing Exams from Aug 1992 to Nov 1992,per Generic Ltr 89-03.Exams for New Licenses & License Upgrades Will Be Administered in Mar & Requalification Exams Will Be Administered in Nov + (ML17289A504)
- ML17289A517 + (ML17289A517)
- GO2-92-112, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-16 on 910916.Corrective Actions:Motor Operated Valves within Scope of Generic Ltr 89-10 Will Be Evaluated for Differential Pressure Conditions + (ML17289A518)
- ML17289A519 + (ML17289A519)
- IR 05000397/1992010 + (ML17289A521)
- ML17289A522 + (ML17289A522)
- IR 05000397/1992008 + (ML17289A524)
- GO2-92-102, Forwards 1991 Annual Environ Operating Rept. One NPDES Permit Violation Occurred on 920521 Re Ph Exceeding 9.0 for One H,Reaching Max of 10.1.No Design or Operational Changes or Tests in 1991 Involved Unreviewed Environ Questions + (ML17289A526)
- ML17289A527 + (ML17289A527)
- GO2-92-109, Radiological Environ Monitoring Program 1991 Annual Rept for Nuclear Plant 2 + (ML17289A528)
- ML17289A532 + (ML17289A532)
- GO2-92-118, Forwards App B, 8X8 Extended Burnup, of EMF-92-040 for Review & Approval of Mechanical Design Analysis to Extend Assembly Exposure Limits from 35 Gwd/Mtu to 37 Gwd/Mtu + (ML17289A533)
- ML17289A534 + (ML17289A534)
- ML17289A535 + (ML17289A535)
- ML17289A536 + (ML17289A536)
- 05000397/LER-1992-015, :on 920413,unexplained Pressure Drop in ADS B Section of Containment Instrument Air Sys Header Occurred. Caused by Inadequate Written Procedures.Valve CIA-V-41B Inspected & PPM-8.9.130 Replaced + (ML17289A537)
- ML17289A540 + (ML17289A540)
- ML17289A542 + (ML17289A542)
- ML17289A543 + (ML17289A543)
- GO2-92-123, Submits Rept on Flaw in Reactor Recirculation Piping,Per Generic Ltr 88-01.Indication in ISI Weld 20RRC(6)-8 Reexamined on 920421 to Determine Any Size Change.Results Listed on Encl Submitted for Approval for Restart on 920629 + (ML17289A544)
- 05000397/LER-1992-012, :on 920318,determined That Removal of Access Plugs Over RHR Pump Rooms a & B Exposed Both Rooms to Potential Flooding from Common Source.Caused by Faulty Mgt Methods.Interim Guidance Provided + (ML17289A545)
- 05000397/LER-1992-013, :on 920318,annunciator for RHR B/C VLV Open Permissive Found Lit & RHR Pressure Switch Found Isolated During Startup.Cause Not Determined.Pressure Switch Returned to Svc & Annunicator & Permissive Cleared + (ML17289A547)
- GO2-92-120, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-03 on 920124-0308.Corrective Actions:Test Procedure PPM 8.3.230TP Revised to Require Drywell to Drywell Test Flow Path to Satisfy TS Requirements + (ML17289A548)
- GO2-92-119, Forwards Supplemental Ltr Re Unsatisfactory HHS-certified Lab Performance.Services of Laboratory of Pathology Not Used Until Inconsistencies Resolved.New Lab Is Compuchem Laboratories + (ML17289A549)
- GO2-92-115, Monthly Operating Rept for Apr 1992 for WNP-2 + (ML17289A554)
- ML17289A559 + (ML17289A559)
- ML17289A560 + (ML17289A560)
- ML17289A561 + (ML17289A561)
- ML17289A563 + (ML17289A563)
- ML17289A564 + (ML17289A564)
- ML17289A565 + (ML17289A565)
- GO2-92-117, Informs of Completion of Harsh Environ Setpoint Calculations for Equipment Setpoint Methodology Program Plan,Per Mar 1992 Commitment.Implementation of Equipment Setpoint Changes in Process + (ML17289A566)