Text
~g Ilfgy
O
oO
I
/y
)fy*y4
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CAUFQRNIA94596-5368
APR 2 3 igS2
Docket No.
50-397
License No. NPF-21
Mashington Public Power Supply System
i'. 0.
Box 968
3000 George Mashington
May
Richland,
99352
Attention:
Hr. G.
C. Sorensen,
Hanager
Regulatory
Programs
SUBJECT:
NRC INSPECTION
REPORT
NO. 50-397/92-10
OF MASHINGTON PUBLIC POMER
SUPPLY SYSTEH NUCLEAR PROJECT
2 (MNP-2)
EROSION/CORROSION
PROGRAH
This letter refers to the inspection conducted
by Hr. Hichael J.
Royack of
this office on Harch
23 through 27,
1992, of activities authorized
by NRC
License
No. NPF-21.
The inspector discussed
the findings with Hr. C. H.
Powers,
Director of Engineering,
and members of your staff at the conclusion
of the inspection.
Areas examined during this inspection
are described
in the enclosed
inspection
report.
Mithin these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
The inspection of your erosion/corrosion
monitoring program concluded that the
Supply System
has
an effective program in place.
However,
we are concerned
that the Supply System did not use approved, written procedures
to implement
the program.
Further,
based
on the inspection results,
the program appeared
to lack clear evidence of management
or quality assurance
overview.
This lack
of standards
for implementing programs
has
been previously identified as
a
problem area,
and has
been the subject of prior reports
and management
meetings.
Me understand that you are developing engineering
management
guidelines,
and
are committed to incorporate the erosion corrosion program into the
engineering
management
guidelines.
Within the scope of this inspection,
no violations or deviations
were
identified.
9205110045
920423
ADOCK 05000397
Q
In accordance
with 10 CFR 2.790 of the NRC's "Rules
and Practices,"
a copy of
this letter and enclosure will be placed in the Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sine rely,
wis F. Hiller, Jr., Chief
Reactor Safety Branch
Enclosure:
Inspection Report No. 50-397/92-10
cc w/enclosure:
Hr. J.
M. Baker,
WNP-2 Plant Hanager
Hr. A. G. Hosier,
MNP-2 Licensing Hanager
Hr. L. L. Grumme, Acting Director, Licensing
8 Assurance
Hr. G.
E. Doupe,
Esq.,
MPPSS
Hr. A. Lee Oxsen,
Deputy Hanaging Director
Hr. J.
V. Parrish, Assistant
Managing Director of Operations
State of Mashington
Hr. H. H. Phillips,
Esq.
(Winston
& Strawn,
1400
L Street,
NW,
D. C.
20005-3502)
'\\
APR 2 3 1992
RV:jb
Y S
0
ROYACK
/tV/92
c~-
t
0
E
NO
NO
NO
Prew'lovely 0iQ
NARBUT
PJOHNSON
"+~
LMILLER
K
RKINS
4/A+92
4/
/92
,4//A/92
4/ /92
R
HERNN
/92
NO
E
NO
S
HO
1
i
1
H