Forwards Insp Rept 50-397/92-10 on 920323-27.No Violations Noted
ML17289A519
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/23/1992
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289A520 List:
References
NUDOCS 9205110045
Download: ML17289A519 (4)


See also: IR 05000397/1992010

Text

~g Ilfgy

O

oO

I

/y

)fy*y4

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFQRNIA94596-5368

APR 2 3 igS2

Docket No.

50-397

License No. NPF-21

Mashington Public Power Supply System

i'. 0.

Box 968

3000 George Mashington

May

Richland,

Washington

99352

Attention:

Hr. G.

C. Sorensen,

Hanager

Regulatory

Programs

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-397/92-10

OF MASHINGTON PUBLIC POMER

SUPPLY SYSTEH NUCLEAR PROJECT

2 (MNP-2)

EROSION/CORROSION

PROGRAH

This letter refers to the inspection conducted

by Hr. Hichael J.

Royack of

this office on Harch

23 through 27,

1992, of activities authorized

by NRC

License

No. NPF-21.

The inspector discussed

the findings with Hr. C. H.

Powers,

Director of Engineering,

and members of your staff at the conclusion

of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection

report.

Mithin these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

The inspection of your erosion/corrosion

monitoring program concluded that the

Supply System

has

an effective program in place.

However,

we are concerned

that the Supply System did not use approved, written procedures

to implement

the program.

Further,

based

on the inspection results,

the program appeared

to lack clear evidence of management

or quality assurance

overview.

This lack

of standards

for implementing programs

has

been previously identified as

a

problem area,

and has

been the subject of prior reports

and management

meetings.

Me understand that you are developing engineering

management

guidelines,

and

are committed to incorporate the erosion corrosion program into the

engineering

management

guidelines.

Within the scope of this inspection,

no violations or deviations

were

identified.

9205110045

920423

PDR

ADOCK 05000397

Q

PDR

In accordance

with 10 CFR 2.790 of the NRC's "Rules

and Practices,"

a copy of

this letter and enclosure will be placed in the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sine rely,

wis F. Hiller, Jr., Chief

Reactor Safety Branch

Enclosure:

Inspection Report No. 50-397/92-10

cc w/enclosure:

Hr. J.

M. Baker,

WNP-2 Plant Hanager

Hr. A. G. Hosier,

MNP-2 Licensing Hanager

Hr. L. L. Grumme, Acting Director, Licensing

8 Assurance

Hr. G.

E. Doupe,

Esq.,

MPPSS

Hr. A. Lee Oxsen,

Deputy Hanaging Director

Hr. J.

V. Parrish, Assistant

Managing Director of Operations

State of Mashington

Hr. H. H. Phillips,

Esq.

(Winston

& Strawn,

1400

L Street,

NW,

Washington

D. C.

20005-3502)

'\\

APR 2 3 1992

RV:jb

Y S

0

ROYACK

/tV/92

c~-

t

ES

0

E

NO

ES

NO

NO

Prew'lovely 0iQ

NARBUT

PJOHNSON

"+~

LMILLER

K

RKINS

4/A+92

4/

/92

,4//A/92

4/ /92

R

HERNN

/92

NO

E

NO

S

HO

1

i

1

H