Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276A936 + (ML17276A936)
- ML17276A941 + (ML17276A941)
- ML17276A948 + (ML17276A948)
- ML17276A951 + (ML17276A951)
- ML17276A952 + (ML17276A952)
- ML17276A953 + (ML17276A953)
- ML17276A954 + (ML17276A954)
- ML17276A955 + (ML17276A955)
- ML17276A956 + (ML17276A956)
- ML17276A957 + (ML17276A957)
- ML17276A958 + (ML17276A958)
- ML17276A960 + (ML17276A960)
- ML17276A964 + (ML17276A964)
- ML17276A968 + (ML17276A968)
- ML17276A971 + (ML17276A971)
- ML17276A972 + (ML17276A972)
- ML17276A975 + (ML17276A975)
- ML17276A976 + (ML17276A976)
- ML17276A977 + (ML17276A977)
- ML17276A994 + (ML17276A994)
- ML17276A997 + (ML17276A997)
- ML17276A998 + (ML17276A998)
- ML17276A999 + (ML17276A999)
- IR 05000397/1981022 + (ML17276B000)
- ML17276B002 + (ML17276B002)
- ML17276B005 + (ML17276B005)
- GO2-82-116, Responds to 820126 & 25 Requests for Commitment to Close Out Open Fire Protection Issues.Fire Detection Circuits That Actuate Fire Suppression Sys in safety-related Areas Will Be Converted to Class a + (ML17276B008)
- ML17276B009 + (ML17276B009)
- ML17276B010 + (ML17276B010)
- ML17276B012 + (ML17276B012)
- ML17276B013 + (ML17276B013)
- ML17276B019 + (ML17276B019)
- ML17276B023 + (ML17276B023)
- ML17276B027 + (ML17276B027)
- ML17276B029 + (ML17276B029)
- ML17276B032 + (ML17276B032)
- GO2-82-117, Forwards Revised FSAR Pages Covering Miscellaneous Changes to Fuel Pool Cooling write-up,in Response to Open Item from Auxiliary Sys Branch 811007 Meeting.Pages Will Be Incorporated Into FSAR Amend 24 + (ML17276B034)
- GO2-82-119, Forwards Responses to Questions 371.019 & 371.020 from Hydrologic Engineering Branch Review for Incorporation in Amend 24 to FSAR + (ML17276B035)
- ML17276B037 + (ML17276B037)
- ML17276B039 + (ML17276B039)
- GO2-82-125, Forwards Updated Response to Revised Sections of App B Per 820112-14 Meetings.Response to Be Incorporated in Amend 24 of FSAR + (ML17276B043)
- GO2-82-130, Forwards App a Draft Tech Specs,In Response to NRC Request + (ML17276B044)
- GO2-82-120, Forwards marked-up Response to Containment Sys Branch Issue 47a-f, Acceptable SRV Design Load Spec from 810914-17 Meeting.Revised Page 5 to Response to Issue 48,submitted 820113,encl + (ML17276B048)
- GO2-82-121, Requests Relief from ASME Section XI Requirements Re Welds Found to Be Partially Inaccessible During First 90% of Preservice Insp Baseline.Remaining 10% of Baseline Exams Should Be Completed Before June 1982 + (ML17276B049)
- GO2-82-129, Forwards Table & Sketches Providing Info Requested by NRC That Pool Temp Monitoring Sys Meets Requirements of NUREG-0487 Re Location of Temp Sensors & Electrical Div Redundancy + (ML17276B050)
- GO2-82-144, Forwards 820205 Transmittal Ltr to L Dallas & Nd Lewis & Certificate of Svc Re Amend 21 to FSAR + (ML17276B051)
- GO2-82-147, Submits Proposed Outline of Facility Fuel Rack Surveillance Program Per 820122 Telcon + (ML17276B052)
- ML17276B053 + (ML17276B053)
- ML17276B054 + (ML17276B054)
- GO2-82-128, Forwards Response to Draft SER Open Issues & Outstanding Open Branch Meeting Issues.Info Provided Re Internally Generated Missiles Outside & Inside Containment,Radwaste Bldg Analysis & Thermal Overload Test Program + (ML17276B055)
- ML17276B056 + (ML17276B056)