HASllINGTON PUBLIC POWER SUPPLY SYSTBl WPPSS NUCLEAR PLANT NO.
2 DOCKET NO. 50-397 ORDER EXTENDING CONSTRUCTION CNPLETION DATE Washington Public Power Supply System (WPPSS) is the holder of Construc-tion Permit No. CPPR-93 issued by the Atomic Energy Commission* on tlarch 19, 1973 and extended on August 29, 1978, for construction of the HPPSS Nuclear Plant No.
2 which is presently under construction at the Permittee's site in Benton County, Washington.
On September 4, 1981, the Permittee filed a request pursuant to the Code of Federal Regulations, Title 10, Part 50, Section 50.55(b) for an extension of the construction completion date for HNP-2 because construction has been delayed due to the following factors:
1.
Changes in the scope of the project including increases in the amount of material and engineering required as a result of regulatory actions, in particular those subsequent to the TNI-2 accident.
2.
Construction delays and lower than estimated productivity, which resulted in delays fn installation of material and equipment and delays in completion of systems necessitating rescheduling of press operational testing.
3.
Strikes by portions of the construction work force.
4.
Changes in plant design.
5.
Delays in delivery of equipment and materials.
ect ve January 19, 1975, the Atomic Energy Commission became the Nuclear Regulatory Commission and Permits in effect on that day were continued under the authority of the Nuclear Regulatory Commission.
I', 8202030174 820i27
', 'DR,ADOCK '05000397 I
ir I
,'.. A ','-
PDR ~
goo ~ ooo ~ oo ~ ~ ~ oo ~ oo ~ ~ ~ ~ ~
DATE$
~ o ~ ooooo ~ ooooosooooooooo
~ ~ ~ ~ ooo ~ ~ ~ ~ ~ ~ ~ ooo ~ ~ ~ ~ ~ ~ ~
~ oo ~ oo ~ ooo ~ ~ ~ ~ o ~ ooo ~ ~ ~ ~ ~
NRO FORM 318 (10-80) NRCM 0240 OFFjclAL RECORD COPY USGPO: 1981 33&960
"1 C
,r
. I
~
~
0' 04
This action involves no significant hazards consideration; good cause has been shown for the delays; and the requested extension is for a reason-able period, the bases for which are set forth in the staff's evaluation of the request for extension.
The Commission has determined that this action will not result in any significant environmental impact and, pursuant to 10 CFR 51.5(d)(4),
an environmental impact statement, or negative declaration and environmental impact appriasal, need not be prepared in connection with this action.
The NRC staff evaluation of the request for extension of the construc-tion permit is available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N. W., l<ashington, D. C.
20555 and at the Richland Public Library, Richland, Washington 99352.
IT IS HEREBY ORDERED THAT the latest completion date for CPPR-93 is extended from December 1, 1981 to February 1, 1984.
FOR THE NUCLEAR REGULATORY CONIISSION Original signed by Darrell G. Eisenhut dao 27
>98?
Date of Issuance:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
- See previous pa 0604vi<E or snstsals l"
OFFICEI SURNAME$
DATE Q DL:I.gg
~ ~ ok
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
..12/.2:P8.1....
DL:LBb ASchwe OELD
~,[$
DL:AD:L c r lJPatonU RTed o
/81 DL:DI bE'"enhut 2/
NRC FORM 310 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~960
OO 1 ~
o P
4 l
,pwi v'tt, y
4g~
1 a