ML17276A952
| ML17276A952 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/11/1982 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17276A953 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.2, TASK-TM GO2-82-24, NUDOCS 8201260006 | |
| Download: ML17276A952 (3) | |
Text
0 RKGULIATORY I>>VFORMATION DCSTRIBUTIOIVf SYSTEM (RIDS)
ACCESSIONI >>VBR: 8201260006 DOC>, DATE'2/01/11 VOTIARIZEO'! NOI FACIL':50 397 rIPPSS VuCil carr P'rO'J eCt<
Uni t 2E
'mfa'ShingtOn Publ iCT POWe AUTH,iVA'vIKI AUTHOR. AF.FALIIATION BOUCHEIYRG;D ~.
mfa'shington Publiic Power S'uppl y System RECIP>>,NANSEI RKCflPIIKhllTI AFFIILIIATION>>
SCHHENCERRA ~
Lficensing Branch 2
5~
SUBJECfl':
Forwairds "Inter imf Shi eflding E!valuation Raffia'tion Rept'"
oer commitment stated in response to~ NURKGI.0737 Item II,B;2',
DISTRISUTION CDDE".
SSOIS CDRCES RECEIVED:LER Jl ENCLI SIZE!:
TITLE: PSAR/FGAR AivIO~TG ahd< Rel ated Corr esoondence NOTES:2 cooi esi al lf mat 1.:PR'.,
OOCKEiTI fff:
05000397 05000397>>
R ECIIPil EIVTf ID COOKT/ VALKI ACT'IOiV:
A/D LIICEIVSVGi LIIC, BRI C2 LIA COPil KS LITITR ENCL'.
0 1
0 RECIP>>IElVTI IO'OOK'/VAHEI LIICI BR 02 3CI AULUCK'rR,'1, COPIES'fl'TR KNCLI 1
0' 1
I >>VTERNALI! KLO IE'/DEPT EPOBI 3o>>
%PA NRR/DK'/EQBI 13 NRR/OKI/HGKBi 30 VRR/DKI/4ITKB~
1,7 VRR/OK'/SABA 2.4>>
IVRR/DHFG/HFEB40 IVRR/OHr"6/OI.B 34'RR/OS>>I/A" 8<
26 VRR/OS>>I/CPS<
10
>>VRR/DS'I/KITSB 12.
VRR'/D Sil/PGBI 1.9 N
I /RSB 23 RKG'iILEI 04'.
0 1
1 0
3-3 2
?
1 1
1, 1
1 1
1>>
1 1
1 1
1 1
1 1
1 1,
1 I EI 06 IK'/OEP/EPLBi 36 iVRR/DE'/CK9>>
11 NRR/OET/GB NRR/DK'/4lEBT 18 NRR/DE/GAB 21 iVRR/DE'/SEBr 25 iVRR/DHFS/LQB" 32 VRR/DHFS/PITR82.0 iVRR/OS I/AS3f 27>>
NRR/OS I/C33f 09 NRR/DSI/ICGBi ib NRR/DSI/RASf 22.
NRR/OST/LGBf 3
3 1
1 2
2 1
1 1,
1, 1
1 11 1
1 1
1 1
1 1,
1 1
EXTKRNALI! ACRS 4'1.
FEMA REP OIIVf 39 NRC" POR 02 NT'IS ib 16 1
1 1
1' BNLI(AMDTS< ONLIY)
=
LPDR 03-iVSICI 05>>
1-1 1.
1 TOTALI IVU',LIBER OF( COPIIE8 REQ'J'IRED:
LITTR Q
ENCLf PS
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Docket No. 50-397 January 11, 1982 G02-82-24 SS-L-02-CDT-82-006 Hr. A. Schwencer, Director Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington D.C.
20555
Dear Nr. Schwencer:
Subject:
NUCLEAR PROJECT NO.
2 INTERIH SHIELDING EVALUATION RADIATION REPORT alp '+PP~
Enclosed are sixty (60) copies of the Interim Shielding Evaluation Radiation Report.
This report is being submitted per the WNP-2 commitment stated in the response to regulatory issue II,B.2, Appendix B of the WNP-2 FSAR.
Very truly yours, 6 ~
D. Bouchey Deputy Director, Safety and Security CDT/ct Enclosures cc:
R. Auluck, NRC WS Chin, BPA R. Feil, NRC-site OK Ear le, BSR-RO PDR AOOCK PDR 8gOi260006085000397 A
t C
c, HI'