Forwards 120-day Response to NRC 810424 Concerns Re Pipe Breaks in BWR Scram Discharge Vol & Response to Generic Ltr 81-34 Re Breaks
ML17276A956
Person / Time
Site: Columbia 
Issue date: 01/13/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GL-81-34, GO2-82-37, NUDOCS 8201260194
Download: ML17276A956 (15)


Text

'>>j

~

REGULA'TORY., IVFOR>>MATIOI>>I DiISTRIBUT<IO>>Vr SYSTEM'RIOS)'CCESSION

<VBR'8201260194" OOCI,O'ATE': 82/01/13

>>VOLT'ARIZEOI:

NO OOCKK(TI 0:,

FAC>>II.I:50 397 APPSS Vuc>>l ea'r:, P'rorj act

Uni t>> 2'~

'rtIashi ngton Pub l i c>> P'owe 05000397(

,'U AUTHOR. A,=Fill.IIA,TION BOUCHE>>YE G'ED'.,

Ha'shington>>

PUbl>>i c Power Suopl y Sy'stew RECIP>>D>>VAiiIEI RKCIIPIIKNiTIAFF<ILIIATION>>

SCH'AE>>VCERg A;,

Llicensi ng Br anch 2

SUBJECf! F'r aa'r ds 120 day r esponse to= VRC 810424 coercer ns re pipei breat'cs in>> 8'riIR'crabt di'scharge votir 8 r espouse toI Gener i c>>

Lltr 81.-34'e breaks.

DXSTRISU>>i10<t'.CDDKtr SDOIS DRiIES RECEIVED;Lt>>R Lt =t>>Cl.t J SIZE>>

TITLE'. PSAR/F6AR=

Ab/OITS andi Related Corresoopdence iVOTES: 2, copi esi aIlilr,wa'ttli;Pier.,

05000397>>

F RECtIP>>IKIV>>TI I 0 CODEr/ V A>>MKI ACIT-ION:

A/0 LIICENS'.4G'IICI BRI rtr2 LIAI INTERNALI: ELO IK'/OK>>o/KPOBI 35>>

'(IP A VRR/DK>>/KQBr 13>>

>>VRR/DK'/HGEBi 30

<VRR/D="'/'>>I'TKSr 1<7>>

,VRR/D~>>/S A'r3r 2'4'RR/OHFS/

Hr;KB'40 NRR/DHF>>S/OLSr 34 VRR/OSil/AESi 2&'RR/DSll

/CtPtBI 1,0 NRR/OS>>I/EITSBi 12:

<VRR/OiS>>I/PGBi 19 SBi 23 RKG! Fil 04 EKTERNALI! ACRS 4<1 FERA-REPr OilVI 39 NRCI PQR'?:

NT>>IS COP<IKS Lll'ITR EN C LI 0

0 1.

0 1(

1 0

3(

3 2:

?

1(

1 1;

1 1

1 1(

1 1(

1 1.

1 1>>

1 1"

1 1(

1 1>>

1 16 16 1

1)~.

1 1

1 1

REC>>IP'IKN'Tl IDI COOKr/ V'Al>>IKI LrICI BR tr2 BCI AULUCI>>>>>> R ~'1.

I EI 06 IE>>/DEP/EPL,BI 36

<VRR/OE/CEB 11.

NRR/DE'/GB(

28" NRR/OE'/!>>IEBI 18'VRR/OE'/9AB>>21.

iVRR/DE'/SKB>>

25 NRR/OHF6/LQSr 32:

iVRR/DHFS/Pf R820

>>VRR/OSI/ASBr 27 NRR/OS I/CS3r 09

<VRR/DS I/IC>>SBr 16 NRR/DSI/RAB>>

22

<VRR/OST'/LGSr 33 BNLI(ARD>>TSr 3IVLIY)

LPDR 03 iVS I CI 05>>

COPIKS LITTR EiVCLI 1(

0 1

1 3

3 3

1, 1

2" 2"

1-1, 1

l.

1 1

1>>

1 1>>

1, 1

1 1

1, 1

11 l.

1 gV TOTALI iVUXBKR OF>> COP>>IK>>S REQ>>JXREO:-

LITTR ~

E>>VCLI

1 f

820i2bOi94 S20ii3 PDR ADGCK 0500Q397

'~

)

A 'DR eu Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 13, 1982 G02-82-37 SS-L-02-CDT-82-017 Docket No. 50-397 Mr. A. Schwencer, Director Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

BHCPiB/BD JALAP. J >gsgg Qhmg~

@RfRl@gg g

Subject:

Also, this is the Supply System's response to Generic Letter 81-34 (see Reference 4 to the Attachment).

Very truly yours, NUCLEAR PROJECT NO.

2 RESPONSES TO REQUEST FOR INFORMATION Enclosed are sixty (60) copies of the Supply System 120-day response to the NRC's concern regarding Pipe Breaks in the BWR Scram Discharge Volume (see Reference 1 to the Attachment).

G.

D. Bouchey Deputy Director, Safety and Security CDT/jca Enclosures cc:

R Auluck -

NRC WS Chin BPA R

Feil NRC Site

rg',i n<

I y[ 'l b

II L

e L

'J

<'s

ATTACKNENT Safet Concerns Associated with Pi e Breaks

References:

in the BWR Scram S stem 1.

Letter from R. L. Tedesco (NRC) to R. L. Ferguson (Supply System),

"Safety Concerns Associated with Pipe Breaks.in the BMR Scram System",

dated April 24, 1981.

2.

GE Evaluation in Response to NRC Request Regarding BWR Scram System Pipe Breaks, NED0-24342, dated April, 1981.

3.

Letter MFN-091-81, G.

C. Sherwood (GE) to D. Eisenhut (NRC),

"NRC Report,

'Safety Concerns Associated with Pipe Breaks in the BMR Scram System'",

dated April 30, 1981.

4.

Generic Letter 81-34, Darrell G. Eisenhut (NRC) to All GE BWR Licensees, same title, dated August 31,

1981, NUREG 0803, enclosed.

1.0

- INTRODUCTION In response to your request for a generic evaluation within 45 days of the Scram Discharge Volume System, (SDV) (Reference 1),

GE reviewed the SDV against the general design criteria and it was concluded that the generic SDV design is in conformance with GDC 14, GDC 35, GDC 55, 50.2(v),

50.55a (including footnote 2),

and

$ 50.46 of the Commission's regulations.

The generic evaluation report (Reference 2) was transmitted to you on April 30, 1981 (Reference 3).

In addition to your request for the generic evaluation, you also requested, within 120 days, a plant specific evaluation of the applica-bility of the 45 day generic evaluation.

The MNP-2 SDV has been reviewed on a plant specific basis by a team of Supply System engineers using AE input and confirmed by a plant walkdown.

The generic report was found to envelop the MNP-2 plant design.

Further NRC guidance was provided in NUREG 0803 (Reference 4) as to an acceptable plant spe-cific, 120 day response for this issue.

The Supply System response is enclosed in a format compatible with Section 5 of NUREG 0803, i.e.,

after a section describing recent or proposed SDV changes, the follow-ing sections describe our response to Piping Integrity (Section 3.0),

Mitigation Capability (Section 4.0),

and Equipment gualification (Section 5.0).

2.0 SYSTEM DESIGN The MNP-2 SDV has been evaluated against the Generic Safety Evaluation

Report, "BMR Scram Discharge System",

dated December 1, 1980.

The evaluation indicated that the installed system design satisfies the

intent of the GE Generic Safety Evaluation Report and GE Design Speci-

, fication 22A4260.

The following changes will be required for compl i ance.

1.

The addition of redundant air-operated vent and drain isolation valves.

2.

The addition of six additional redundant and diverse level instru-ment ati on for scram.

3.

The relocation and replping of instrument piping directly to the scram instrument volume.

These changes are discussed in our detailed response to NRC guestion 010.41.

(Attached)

WNP-2's SDV header system is designed as a continually expanding path from the 185 3/4" individual scram discharge (withdrawal) lines to one of two integrated SDV/IV ( Instrument Volume) systems (one system per approximately half the drives).

Each integrated SDV/IV system consists of a continuously downsloping piping run expanding from the SOV (con-sisting of seven 6" return headers from the indiv>dual hydraulic con-trol unit (HCU) banks to an 8" combined return header) to the 12" vertically oriented IV.

WNP-2's IVs have been designed as vertical extensions attached directly to the SDV.

This configuration provides a

direct hydraulic couple between the SOV and IVs and ensures immediate and continuous liquid level monitor in the SDV.

Redundant air-operated vent and drain valves will be added on the SOV in series to ensure system, isolation during reactor scrams.

This includes independent solenoid valves for each set of air-operated vent and drain valves.

The SDY is designed with an integral IV which provides direct and imnediate detection of liquid accumulation.

The SOV instrumentation is redundant and single-failure proof (including partial loss of service functions).

Each IV is provided with high level and rod block instru-mentation attached directly to it to alert the operator to liquid accumulation in the SDV.

The system logic is designed in a one out of two, twice configuration.

Each of the associated instrument channels is capable of being sepa-rately isolated for maintenance, testing or calibration without inad-vertentlyy scramming the reactor.

All the WNP-2 SDV instrumentation will be relocated and repiped directly to the IV instead of the vent and drain piping.

Procedures will be modified to include functional testing of SDV level instrumen-tation after each scram.

Six additional diverse level sensors will be added to the SDV system to ensure diversity and redundancy in level monitoring and scram functions.

The addition of the level switches described above and periodic surveillance testing of, the instruments will provide a continuous means of monitoring the SDV liquid level and ensuring instr ument re liability.

3.0 PIPING INTEGRITY NUREG 0803 reconmendations in this area include as-built inspection, Each seismic analysis, procedure

review, and in-service inspection.

Eac topic is discussed separately below.

3.1 Recomnendation/Guidance

- Provide the results of or a schedule for as-built inspection of the SDV/HCU piping and supports.

WNP-2 Response:

The current schedule to recieve as-built inspection results for the SDV/HCU piping and supports is second quar ter of 1983.

These results will be included as part of the turn-over package for the CRD system in the form of verified (QA/QC'd) drawings.

See Supply System response to IE Bulletin 79-14 for further discussion of the as-built procedure.

3.2 Recommendation/Guidance

- Provide any seismic reanalysis of the SDV piping and supports conducted in accordance with IE Bulletins (specifically 79-14) or otherwise.

WNP-2 Response:

The WNP-2 SDV/HCU system has been designed, built and inspected to the requirements of Seismic Category I.

Therefore, as detailed in our previous response to IE Bulletin 79-14 and in our response to NRC Question 010.41, no further seismic re-analysis is necessary.

3.3 Recommendation/Guidance

- Provide a schedule and program for reviewing and revising, as appropriate, the HCU-SOV maintenance, surveillance, and modification procedures.

WNP-2 Response:

The surveillance and maintenance procedures are currently being written and approved for WNP-2.

The WNP-2 operational staff has been notified of this concern and will assure adequate precautions and sufficient guidelines are contained to minimize the potential for loss of the SOV system integrity when such integrity should be available.

3.4 Recoamendation/Guidance

- Provide a program of periodic inservice inspection for the SDV system meeting the requirements for Class 2

piping in the Section XI ASNE Code.

WNP-2 Response:

The inservice inspection for the CRO Scram Oischarge Headers will consist of a visual examination for evidence of leakage which will be performed in accordance with ASME Section XI.

All piping connecting to the 'scram discharge headers is less than 4" nominal pipe size and subject only to a visual examination for evidence of leakage.

Furthermore, the headers are on the dis-charge side of the scram discharge system and their failure would not prevent a scram.

The only connections with the RPV are via the 3/4" CRD tubing.

A minimal amount of leakage due to water bypassing the drives during scram will occur, but following scram the leakage will essentially cease upon closure of the scram valves.

In any event, the sum of the bypass leakages from all drives is anticipated to be much less than the reactor makeup system capacity.

Therefore, a failure of a header or any connect-ing piping would not impair the ability to makeup the resulting loss of reactor water using normal makeup systems.

A visual exam-ination for evidence of leakage is, therefore, adequate and com-mensurate with the low operability and safety implications of a loss of integrity of that pipe.

4.0 MITIGATION CAPABILITY NUREG 0803 recomnendations in this area include addressing the BWR emergency, operating procedures and permissible coolant activity.

Each topic is discussed separately below.

4.1 Recomnendation/Guidance

- Commit to revising the BWR Owner's Group Emergency Procedure Guidelines to instruct the operator into a controlled blowdown of

>100oF/hr when a trip occurs with no reset and coincident with indication of a leak in the reactor building.

The rate of depressurization must be compatible with the qualification of equipment in the reactor building.

WNP-2 Response:

A break in the scram discharge volume does not present a new event requiring special training and is handled in accordance with existing procedures for, the small break LOCA event.

Also, since WNP-2 will have symptom-based emergency procedures, a specific problem such as this will not be addressed in the procedures.

Should such a problem arise, however, it will be covered under existing procedures by virtue of its effect on plant systems.

The compatibility of the equipment qualification with the time frame implied by this cooldown rate is discussed in Section 5.0 of this response, as is the flooding concern.

e

4.2 Recoamendati on/Guidance - Implement the Standard Technical Specification for coolant activity.

WNP-2 Response:

The pipe break in the SDV piping system is a low probability event with low offsite consequences.

.Hence, the Supply System does not agree with the recomnendation in NUREG 0803.

Our technical speci-fications will be submitted prior to fuel load and contain a cool-ant activity limit consistent with the WNP-2 safety and environ-mental evaluations.

Immediate operator entry into the SDV/HCU area is not required.

The preferred method for mitigating a'ostulated leak or rupture would be a) scram reset, or b) depressurization such that the leak

rate, and hence, dose rate, is small.

This would allow time for later personnel entry to manually isolate the leak or rupture.

5. 0 EN V IRONMENTAL UAI I FICATION NUREG 0803 recomnendations include identification of equipment used to detect and to mitigate a break and/or leak in the SDV system.

Each topic is discussed separately below.

5.1 Recomnendati on/Guidance - Identify the equipment that would be used to detect a break and/or leak in the SDY system and include

-the qualification of this equipment in the NRC's ongoing Eg program.

WNP-2 Response:

Using a symptom-based approach to the emergency procedures means that identification of a SDV leak or rupture is not the operator's prima y concern.

However, the Supply System agrees that early detection and mitigation is desirable to limit the amount of cool-ant spilled.

It is important to note the reactor conditions in that this is the atmosphere in which the operator makes his diagnosis {i.e., the reactor is tripped but unable to reset the scram, and greater than normal makeup is required to maintain vessel level).

The primary indication will be from the Reactor Building CRD Hydraulic Equip-ment Area Radiation Monitors (Area "E"Station 4, ARM-RE-4 and Area "W"--Station 5, ARM-RE-5).

These monitors operate at an estimated background reading of 1 mR/hr and would increase in reading by approximately

.17 mR/hr per gallon of coolant spilled.

This would be an imnediate and localized response to a SDY/HCU leak or rupture.

In addition, the equipment drain system at WNP-2 contains leak flow detectors at each floor -level of the Reactor Building {Ref:

FSAR, Fig. 9.3-5).

The signal from these detectors are displayed and annunciated in the control room.

This provides the operator with unambiguous indications of which floor level the leak started on.

As discussed in NUREG 0803, further diagnostic indicators would be CRO temperature and CRD position indications.

Also, following a normal scram, certain SDV/IV temperature,

pressure, and level indications would be expected.

These indications would not neces-sarily be present or would be off-normal with a SDV pipe break, again pinpointing the SOV/HCU as the trouble-spot.

The large number of diverse, redundant signals available for diag-nosis of a SOV leak or pipe break render environmental qualifi-cation of any single indicator as non-productive in increasing pl ant saf ety.

5.2 Recommendation/Guidance Identify the equipment-needed to mitigate an unisolable break in the SOV system and include its qualifica-tion in the NRC's ongoing Eg program; address specifically:

1)

Equipment used for depressurization, 2)

ECCS equipment designed for water impingement, 3),

ECCS equipment qualified for wetdown by 212oF water, 4) feedwater and condensate system operation independent of the reactor building environment, 5) availability of HPCI-LPCI turbines due to high ambient tem-perature trips, 6) essential components qualified for service at 212oF and 100Ã humidity.

WNP-2 Response:

The preferred mitigation of a pipe break in the SDV system is for the operator to achieve a scram rese'.,

thereby isolating the flow path from the break opening.

There are several means of bypassing or temporarily disabling scram signals in the control room to achieve scram reset and hence, isolation.

If scram reset cannot be achieved, then reactor vessel depressuri-zation is used to greatly reduce the break mass flow rate until the operators can manually close the isolation valves on the HCU.

In order to depressurize and continue to remove decay heat, the following equipment is needed or could be used:

1)

Equipment used for Depressurization The equipment essential for depressur ization is a means for steam relief and a source of'ake-up water.

For steam relief, the operator can use either the turbine bypass system or, if that's not available, the safety-relief valves.

Both of these systems are inde-pendent of a postulated SDV pipe break environment.

For make-up flow, the operator can use the feedwater system or the ECCS (HPCS and LPCS) systems.

Their environmental qualification for a SOV pipe break are discussed in 2), 3),

4 ),

and 5) below.

2)

ECCS Equipment Designed for Water Impingement The pump motors for the ECCS pumps are a drip-proof design, i.e., they are shrouded for protection against water impingement.

3)

ECCS Equipment gualified for Metdown by 212oF Mater--The Supply System has madeplant specific calculation using the methods found in Reference 2.

The resulting flow rates and flooding data are tabulated below.

Our analysis is in agree-ment with the.conclusions and extends beyond the results pre-sented in Reference 2.

We agree with Reference 2 that 30 minutes is more than adequate time for the operator to recog-nize the situation and begin manual depressurization.

Since the SOV piping collects the seal leakage flow from all CRDs the worst case break would occur at Floor El. 522',

100'3" above the reactor building basement where ECCS pumps are

located, releasing initially 550 gpm from reactor vessel inventory.

Since analysis of this break size spectrum shows that the release is 30K steam (Reference 2), the following results are conservative in assuming that the flow is 100K sub-cooled water flowing directly to the ECCS pump rooms for the flooding condition.

Postulated SDV Pi e Break Oe ressurization at 6

Sum s

0 eratin No Sum s 0 eratin Time After RPV Pressure Break Min si a Rupture*~

~Fl ow m

Water Ho 1 dup~

Depth on Water Hol dup Depth on an Floor al

~Floor in an Floor a'I Floor in 0

30 40 70 180*

1050 1050 135 89 23.8 550 550 130 7,3 45 0

7,500 7,900 1,945 0

0.24 0.30 0

16,500 19,900 22,945 29,435 1.5 2.0 2.4 3.3 Leak isolated at 3 hrs.

(2-1/2 hours after depressurization per Reference 2)

The floor noted covers RHR pump rooms A and 8, the CRD pump room and the radwaste room; the ECCS drive motors, the only items possibly susceptible to water damage are more than 60" above the floor.

  • ~

The flow rate curve was integrated to give "water holdup" and "depth on floor".

The Reference 2 analysis notes that coolant activity and steam environment surrounding the HCU's following the break shows that 2-1/2 hours after depressurization begins is more than adequate time to allow operator access to close the HCU isolation valves.

The above results assume all watertight doors which separate ECCS compartments

-in the basement remain close'd.

However, in the above analysis, if any of these doors are left open, the effect would be to reduce the water depth on the floor and extend the time available for manual isolation of the HCU's.

This is a consequence of simply increasing the floor area available for flooding.

The only ECCS equipment susceptible to flooding is approximately 60" above the basement floor.

KCU isolation could occur as late as 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> and still not flood ECCS pump motors even in the event no sump pumps were running.

In WNP-2 the electrical, instrument and control equipment which is vital to the ECCS and which is located in the reactor building is designed to seal against penetration by steam.

The foregoing establishes the fact that the ECCS pump capability will not be lost due to flooding, and this coupled with the availability of other vessel injection loops meets the requirements of 50.46 of the Commission's regulations.

4)

Feedwater and Condensate System Operation Independent of the Reactor Building Environment - The only active components of the feedwater and condensate system operation that are exposed to the reactor building environment are the isolation valves RFW-V-065 A and B and the check valves RFW-V-32 A and B.

Since these valves and associated signals are part of the Reactor Building Isolation System, they are guality Class I, Seismic Category I components.

The motor operators for these valves are part of the Supply System Environmental gualifi-cation Program.

5)

'Availability of HPCI-LPCI Turbines due to High Ambient Temperature Trips - WNP-2 utilizes HPCS-LPCS systems with motor-driven, not turbine-driven, pumps.

These motors do not receive a trip signal from an area high temperature sensor and, therefore, are available in an adverse environ-ment.

6)

Essential Components gualified - The sections of NUREG 0803 applicable to this item discuss the availability of long-term cooling following an SDV pipe break.

At WNP-2 the RHR system is guality-Class I, Seismic Category I, Class lE.

Therefore, components of this system are a part of the Supply System Environmental gualification Program.

The above discussion demonstrates that adequate equipment exists, under SDV pipe break conditions, to miti'gate the break flow and continue core cooling.

5.3 Recommendation/Guidance

- For any equipment required for identifi-cation and/or mitigation that is not qualified for service at 212 F and 100/ humidity, provide a schedule for defining the plant-specific SDV break environment and a commitment to qualify the equipment in accordance with the NRC's ongoing Eg program.

WNP-2 Response:

The responses provided in the previous sections'have demonstrated that mitigation and long-term cooling can be achieved with quali-fied equipment following a pipe break in the SDV/HCU system.

Therefore, no further commitment of equipment to the Eg program is necessary.

The detection systems

employed, although not environmentally qualified, are numerous and redundant, alleviating the necessity of qualification for a low probability event.