Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276A209 + (ML17276A209)
- GO2-81-042, Forwards Response to Reactor Sys Branch Request for Addl Info Re Open Items,Per 811007 Telcon.Response Will Be Incorporated Into FSAR Amend 21 + (ML17276A218)
- GO2-81-473, Advises That Analysis Assumptions & Initial Conditions Used for Generic Response to NUREG-0737 Item II.K.3.44, Evaluation of Anticipated Transients Combined W/Single Failure Are Representative of Facility + (ML17276A221)
- ML17276A229 + (ML17276A229)
- GO2-81-424, Forwards Responses to Chemical Engineering Branch Questions, Per 810804 Request for Addl Info.Responses Will Be Incorporated Into FSAR Amend 21 + (ML17276A290)
- GO2-81-484, Forwards Responses to Containment Sys Branch Questions Per 810316 Request for Addl Info.Responses Will Be Incorporated Into FSAR Amend 21 + (ML17276A293)
- ML17276A297 + (ML17276A297)
- ML17276A301 + (ML17276A301)
- ML17276A318 + (ML17276A318)
- GO2-81-474, Forwards Response to Geosciences Branch 810722 Request for Addl Info.Five Oversize Figures Encl.Aperture Cards Are Available in PDR + (ML17276A324)
- ML17276A327 + (ML17276A327)
- ML17276A330 + (ML17276A330)
- CP-201700741, Submittal of Amendment No. 14 to Indemnity Agreement No. B-96 + (ML17276A337)
- GO2-81-475, Forwards Amend 20 to FSAR + (ML17276A339)
- BVY 17-035, Pre-Notice of Disbursement from Decommissioning Trust + (ML17276A340)
- CNS-17-048, Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-122 + (ML17276A345)
- ML17276A348 + (ML17276A348)
- ML17276A356 + (ML17276A356)
- GO2-81-511, Forwards Response to NRC Request for Info Re Fire Protection Evaluation Rept + (ML17276A375)
- ML17276A406 + (ML17276A406)
- ML17276A413 + (ML17276A413)
- BVY 17-036, Registration of Spent Fuel Cask Use + (ML17276A416)
- ML17276A420 + (ML17276A420)
- GO2-81-524, Forwards Results of Suppression Pool Temp Transient analysis.In-plant Test Will Be Conducted to Measure Difference Between Local & Bulk Pool Temps During Main Steam Valve Discharge + (ML17276A438)
- ML17276A445 + (ML17276A445)
- ML17276A449 + (ML17276A449)
- NLS2017083, ISFSI - Thirty-Day Notification for the Use of Three Spent Fuel Casks + (ML17276A454)
- GO2-81-527, Forwards Soil Backfill Testing Program, Vols 1 & 2,GA File 81-605,summarizing Results of Test Program & Conclusions Re Suspected Deficiency in Soil Backfill.Effects of Soil on safety-related Utils & Structures Acceptable + (ML17276A460)
- ML17276A465 + (ML17276A465)
- ML17276A470 + (ML17276A470)
- GO2-81-504, Forwards Certificate of Svc for Amend 20 to FSAR + (ML17276A479)
- ML17276A484 + (ML17276A484)
- IR 05000397/1981023 + (ML17276A493)
- ML17276A518 + (ML17276A518)
- GO2-81-538, Forwards Updated Organization Charts Reflecting Recent Consolidations of business,safety-related & Analytical Functions.Changes Will Be Documented in Revised FSAR Chapter 13.Requested Addl Matl Available Prior to Dec 1981 Visit + (ML17276A532)
- ML17276A538 + (ML17276A538)
- IR 05000397/1981018 + (ML17276A545)
- GO2-81-552, Forwards Proprietary & Nonproprietary Versions of Summary Rept, Comparison of Condensation Oscillation & Chugging Loads for Assessment of WPPSS Nuclear Project 2. Proprietary Version Withheld (Ref 10CFR2.790) + (ML17276A554)
- ML17276A557 + (ML17276A557)
- ML17276A562 + (ML17276A562)
- ML17276A577 + (ML17276A577)
- ML17276A586 + (ML17276A586)
- ML17276A593 + (ML17276A593)
- GO2-81-553, Discusses 811211 Telcon Between Nrc,Burns & Roe,Bechtel & Util on Question of Obtaining 3-h Fire Barrier for Cable Sys Tested to Meet App R requirements.One-hour Barrier W/O Sprinklers Could Be Used Selectively + (ML17276A600)
- GO2-81-545, Forwards Responses to NRC Questions 121.19 Through 121.22 Re Preservice Insp Program,Per 811016 Meeting + (ML17276A609)
- GO2-81-544, Provides Rationale for Changing Discharge Port Design from 18-inch Circular Pipe to 8-inch by 32-inch Slot,Noted in Des Section 4.2.2.4.Design Results in Greater Mixing by Providing Greater Jet Entrainment Surface.Related Info Encl + (ML17276A616)
- GO2-81-518, Forwards Open Items from Structural Engineering Branch 811005-08 Meeting in Woodbury,Ny + (ML17276A629)
- ML17276A633 + (ML17276A633)
- GO2-81-541, Forwards Responses to Open Items Discussed at 811117-18 Geosciences Meeting.Remaining Reponses Will Be Transmitted Prior to 811231 + (ML17276A636)
- ML17276A642 + (ML17276A642)
- GO2-81-551, Forwards Responses to Geosciences Branch Questions 360.14 & 360.17.Faults Along Rattlesnake-Wallula Alignment Are Not Capable According to NRC Criteria.Estimates of Potential Earthquake Magnitudes Encl + (ML17276A643)