Text
0=
NOV 24 ]981
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
3000 George Washington
Way
Richland, Mashington
99352
Attention:
Dr. R.
G. Matlock
Program Director MNP-2
Gentlemen:
Q)
oEt:2 1 >98tt
<<<<<<@fgj~f+~ip~tl~!t~g
DXL'RATQLISGRE!ll <<R
rtoc
HqTnt corR
C
Subject:
Project Status
Meeting at Region
V Office, Walnut Creek,
California, on November 6, 1981
This refers to the meeting held with Dr. Matlock and
member s of his
staff at the Region
V Office on November
6, 1981, regarding activities
authorized
under
NRC Construction Permit No. CPPR-93.
Subjects
discussed
during this meeting are described in the enclosed
report.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the
enclosed report will be placed in the NRC's Public Document
Room.
Sincerely,
ORIGINAL SlGHEO
Q'.
T. OOODS
B. H. Faulkenberry,
Chief
Reactor Construction Projects
Branch
Enclosure:
IE Report No. 50-397/81-23
Distrib ted by RV:
S
"" Engelke
(>v/o encl)
~ ~ ~
SURNAME/
~ ~ ~ ~
ate
o
e is
,
esi
en
nspec or
"RV)'jV"cjpj
-DGDEIS"~"
11/Pg/81
~ ~ ~ ~
~
~ ~
" fAULKENLERR
11/~/81
sssmaos97
ssiiao >
ADDCK 000003III7I'i...
0
'RC
FORM 3I33FOIROFMRCM ORRO .
OFFICIAL R EGO R 0 COPY
cc w/o enclosure:
R. B. Glasscock,
equality Assurance
Director .
MPPSS
W.
C. Bibb, Project Manager,
MPPSS
G.
C. Sorensen,
Supervisor,
Licensing Engineering,
MPPSS
bcc:
8MB/Document Control
Desk
(RIDS)
lCO~
I(
~
~ ~ ~ ~ \\
~ ~ ~ ~
~ ~ ~ ~ ~
0 USGPO: 1980329 824
~
I
~f
~
~
II 0
If ~ 4
I II ~ ~ t ~ ~ 1