Text

,f~

r

G"'(LOV

f 6

1981

Docket No. 50-397

Washington Public Power Supply System

P, 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director

Gentlemen:

Subject:

NRC Inspection

~cma

~Eel g )@]

a~~~~g

Iy

This refers to the routine inspection

conducted

by Mr. A. Toth of this

office during September

1981, of activities authorized

by

NRC Construction

Permit No. CPPR-93,

and to the discussion of his findings held with Mr.

C. 0. Wright, Mr. H. Crisp,

and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection

are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

inter views with personnel,

and

observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790 of the Comnission's regulations,

a copy

of this letter

and the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If this report contains

any information that

you believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is

necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to withhold such information. If

your receipt of this letter has

been

delayed

such that less

than seven

(7) days are avai lable for your review, please notify this office promptly

so that

a new due date

may be established.

Consistent with section 2.790

(b)(1), any such application must

be accompanied

by an affidavit executed

by the owner of the information which identifies the document or part sought

to be withheld,

and which contains

a full statement of the basis

on which

it is claimed that the inf'ormation should

be withheld from public disclosure.

This section further requires

the statement to to address

with specificity

the considerations

listed in 10 CFR 2.790(b)(4).

The information sought

~g J

to be withheld shall

be incorporated

as far as possible into a separate

OFF(CEO

SURNAME)

OATLI)

RV/dot

- -

TOT ",-

/F81

"'ODDS

iijii8i

"""'FOUL'LIENEE

" - ii'/I98i""

~ ~ ~ ~ ~ ~

~ t SI i22PPggg<<>< fpa

~ ~ ~ ~ ~ ~ ~

PDR

ADQCK 050003'7I7

~ ~ ~ ~ ~ ~ t

Paw ~"""

')C

FORM 318 llO/80)NRCM 0240

OFFIClAL RECORD COPY

ss USGPO: 1980

329 824

~ ! ~

I

~

I

Washington Public Power Supply System

-2-

I

iNOY 16 198l

part of the affidavit. If we do not hear from you in this regard within

the specified periods

noted above,

the report Hill be placed in the Public

Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,')

B.

H, Faulkenber y, Chief"

Reactor Construction Projects

Branch

Enclosure:

IE Inspection

Repor t

No. 50-397/81-18

cc w/o enclosure:

W. C. Bibb, Project Hanager

R.

B. Glasscock, guality Assurance Director

bcc:

DNB/Document Control

Desk

(RIDS)

Distributed by RV:

State'of

WA (Lewis)

RHE (w/oenc)

Res'ident

Inspectors

(3)

1

P

~,

( ~()Cgp @if(

I

P j

t

p

4