Text
,f~
r
G"'(LOV
f 6
1981
Docket No. 50-397
Washington Public Power Supply System
P, 0.
Box 968
Richland,
99352
Attention:
Mr. R.
G. Matlock
Program Director
Gentlemen:
Subject:
NRC Inspection
~cma
~Eel g )@]
a~~~~g
Iy
This refers to the routine inspection
conducted
by Mr. A. Toth of this
office during September
1981, of activities authorized
by
NRC Construction
Permit No. CPPR-93,
and to the discussion of his findings held with Mr.
C. 0. Wright, Mr. H. Crisp,
and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection
are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
inter views with personnel,
and
observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790 of the Comnission's regulations,
a copy
of this letter
and the enclosed
inspection report will be placed in the
NRC's Public Document
Room.
If this report contains
any information that
you believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is
necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within 25 days from the date of this letter
a written application to this office to withhold such information. If
your receipt of this letter has
been
delayed
such that less
than seven
(7) days are avai lable for your review, please notify this office promptly
so that
a new due date
may be established.
Consistent with section 2.790
(b)(1), any such application must
be accompanied
by an affidavit executed
by the owner of the information which identifies the document or part sought
to be withheld,
and which contains
a full statement of the basis
on which
it is claimed that the inf'ormation should
be withheld from public disclosure.
This section further requires
the statement to to address
with specificity
the considerations
listed in 10 CFR 2.790(b)(4).
The information sought
~g J
to be withheld shall
be incorporated
as far as possible into a separate
OFF(CEO
SURNAME)
OATLI)
RV/dot
- -
TOT ",-
/F81
"'ODDS
iijii8i
"""'FOUL'LIENEE
" - ii'/I98i""
~ ~ ~ ~ ~ ~
~ t SI i22PPggg<<>< fpa
~ ~ ~ ~ ~ ~ ~
ADQCK 050003'7I7
~ ~ ~ ~ ~ ~ t
Paw ~"""
')C
FORM 318 llO/80)NRCM 0240
OFFIClAL RECORD COPY
ss USGPO: 1980
329 824
~ ! ~
I
~
I
Washington Public Power Supply System
-2-
I
iNOY 16 198l
part of the affidavit. If we do not hear from you in this regard within
the specified periods
noted above,
the report Hill be placed in the Public
Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,')
B.
H, Faulkenber y, Chief"
Reactor Construction Projects
Branch
Enclosure:
IE Inspection
Repor t
No. 50-397/81-18
cc w/o enclosure:
W. C. Bibb, Project Hanager
R.
B. Glasscock, guality Assurance Director
bcc:
DNB/Document Control
Desk
(RIDS)
Distributed by RV:
State'of
WA (Lewis)
RHE (w/oenc)
Res'ident
Inspectors
(3)
1
P
~,
( ~()Cgp @if(
I
P j
t
p
4