Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-80-210, Confirms 800930 & 1001 Meeting Schedules W/Reactor Sys Branch & Structural Engineering Branch,Respectively,Re Sacrificial Shield Wall at Facility + (ML17275A613)
- GO2-80-212, Deficiency Rept Re Lack of Installation Documentation for Class IE Cables in Main Control Room Raceways.Evaluation Revealed Inadequate Insp Criteria & QA Program for Installation of Electrical Cables.Procedures Being Revised + (ML17275A614)
- ML17275A615 + (ML17275A615)
- GO2-80-211, Deficiency Rept Re Primary Containment Pressure Monitoring Instrumentation Sensing Line Routing to Initiate Eccs.Ped 220-I-324 & -329 Issued,Reassigning Instrumentation Sensing Lines to Penetrations Below Instrument Rack Elevation + (ML17275A616)
- ML17275A617 + (ML17275A617)
- GO2-80-215, Requests Addl NRC Branch Reviews Required on Util Safety Relief Valve Rept.Potential Need Exists for Review of Refinements to Generic Mark II Condensation Oscillation Load or Alternative Load Definition & Methodology + (ML17275A620)
- GO2-80-196, Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Initial Response of 800808 Indicated Review Due by 800915.Due to Delay in Obtaining Info,Review Will Be Completed 801103 + (ML17275A621)
- GO2-80-200, Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Initial Response of 790918 Indicated Action Would Be Taken.Responses Received from Suppliers Indicate No Operational Problems Experienced w/safety-related Pumps + (ML17275A622)
- GO2-80-199, Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Facility Does Not Use Westinghouse Type W-2 Control Switches in Any Safety Sys Design + (ML17275A623)
- ML17275A624 + (ML17275A624)
- IR 05000397/1980002 + (ML17275A628)
- IR 05000397/1980004 + (ML17275A630)
- ML17275A631 + (ML17275A631)
- GO2-80-220, Forwards Amend 11 to Fsar.Affidavit Will Be Provided within 10 Days + (ML17275A632)
- ML17275A635 + (ML17275A635)
- IR 05000397/1980013 + (ML17275A638)
- GO2-80-221, Forwards Amend 4 to Environ Rept.Amend Suppls Ecological Baseline Data & Updates Description of Environ Monitoring Programs + (ML17275A639)
- ML17275A640 + (ML17275A640)
- ML17275A641 + (ML17275A641)
- ML17275A644 + (ML17275A644)
- ML17275A649 + (ML17275A649)
- ML17275A650 + (ML17275A650)
- IR 05000397/1980015 + (ML17275A651)
- GO2-80-227, Final Deficiency Rept Re Installation of Missile Producing Equipment in Class IE Area.Protective Barriers Have Been Designed to Prevent Motor Generator Set Flywheel Failure from Damaging Adjacent Class IE Equipment + (ML17275A653)
- GO2-80-228, Forwards 801022 Transmittal Ltr & Certificate of Svc Re Amend 11 to FSAR + (ML17275A654)
- ML17275A656 + (ML17275A656)
- ML17275A657 + (ML17275A657)
- ML17275A659 + (ML17275A659)
- ML17275A661 + (ML17275A661)
- IR 05000397/1980010 + (ML17275A663)
- ML17275A664 + (ML17275A664)
- GO2-80-237, Deficiency Rept Re Limitorque Dc Valve Operators W/Class B Insulation Not Qualified to IEEE 382.Caused by Failure of Reliance Electric Co to Impose Matls Control on Subsuppliers for Dc Motors.Defective Operator Will Be Replaced + (ML17275A671)
- ML17275A672 + (ML17275A672)
- ML17275A673 + (ML17275A673)
- ML17275A676 + (ML17275A676)
- ML17275A679 + (ML17275A679)
- ML17275A682 + (ML17275A682)
- ML17275A683 + (ML17275A683)
- ML17275A685 + (ML17275A685)
- ML17275A690 + (ML17275A690)
- ML17275A694 + (ML17275A694)
- ML17275A696 + (ML17275A696)
- GO2-80-242, Forwards Sections of FSAR & Plant Design Assessment Rept for Safety Relief Valves & LOCA Loads to Assist in Understanding Nature of Hydrodynamic Loading Phenomenon in Mark II Containments & Use in Facility Buckling Analysis.W/O Encls + (ML17275A700)
- ML17275A702 + (ML17275A702)
- GO2-80-257, Requests 801216 Meeting W/Nrc to Discuss Geology Issues Raised During NRC 801016-17 Site Visit.List of Attendees Requested + (ML17275A708)
- ML17275A710 + (ML17275A710)
- GO2-80-269, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-397/80-16.Corrective Actions:Const Deficiencies Reviewed for Reporting as Potential 10CFR.50.55e Items,Repts Submitted & Instruction Drafted + (ML17275A718)
- GO2-80-271, Interim Deficiency Rept Re Inadequacy of Sway Brace Brackets Mfg by Power Piping Co,Initially Reported on 800820.Caused by Undersized Welds & Poor Weld quality.In-plant Insp of Brackets Performed.Next Rept Is Scheduled for 810202 + (ML17275A720)
- ML17275A722 + (ML17275A722)
- ML17275A724 + (ML17275A724)
- ML17275A725 + (ML17275A725)