~pl AE0y
~o
~y
0O
I
3e
++*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLA2A
WALNUTCREEK, CALIFORNIA94696
Docket No. 50-397
SEP I2
>SS>
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Nr.
R. L. Ferguson
Managing Director
Gentlemen:
Subject:
NRC Inspection of WNP-2
This refers to the inspection
conducted
by Messrs.
A. Toth and
D. Haist
of this office during July 1-31,
1980, of activities authorized
by
NRC
Construction
Permit No.
CPPR-93,
and to the discussion of our findings
held. by the inspector with Hr.
R. Johnson at the conclusion of the
inspection.
Areas
examined during this inspection are described-in
the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspectors.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the
NRC's Public Document
Room.
If this report contains
any information that you believe to be
proprietary, it is necessary
that you submit a written application to this
office, within 30 days of the date of this letter, requesting that such
information be withheld from public disclosure.
The application must
include
a full statement of the reasons
why it is claimed that the
-
SO>OS~~ g p'V
lJashington
Public Power Supply System
information is proprietary.
The application should
be prepared
so that any
proprietary information identified is contained in an enclosure
to the
application, since the application without the enclosure will also
be placed
in the Public Document
Room.
If we do not hear
from you in this regard
within the specified period, the report will be placed in the Public
Document
Room.
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sin'cerely,
Enclosures:
A.
B.
IE Inspection
Report
No. 50-397/80-10
t
cc'w/o enclosure
B:
M.
E. 1Jitherspoon,
Division Manager
guality Assurance,
1JPPSS
M.
C. Bibb, Manager,
HNP-2 Project,
lJPPSS
G. S. Spencer,
Chief
Reactor Construction
and
Engineering
Support Branch