Forwards IE Insp Rept 50-397/80-10 on 800701-31.No Noncompliance Noted
ML17275A661
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/12/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A662 List:
References
NUDOCS 8010310307
Download: ML17275A661 (3)


See also: IR 05000397/1980010

Text

~pl AE0y

~o

~y

0O

I

3e

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLA2A

WALNUTCREEK, CALIFORNIA94696

Docket No. 50-397

SEP I2

>SS>

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Nr.

R. L. Ferguson

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP-2

This refers to the inspection

conducted

by Messrs.

A. Toth and

D. Haist

of this office during July 1-31,

1980, of activities authorized

by

NRC

Construction

Permit No.

CPPR-93,

and to the discussion of our findings

held. by the inspector with Hr.

R. Johnson at the conclusion of the

inspection.

Areas

examined during this inspection are described-in

the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If this report contains

any information that you believe to be

proprietary, it is necessary

that you submit a written application to this

office, within 30 days of the date of this letter, requesting that such

information be withheld from public disclosure.

The application must

include

a full statement of the reasons

why it is claimed that the

-

SO>OS~~ g p'V

lJashington

Public Power Supply System

information is proprietary.

The application should

be prepared

so that any

proprietary information identified is contained in an enclosure

to the

application, since the application without the enclosure will also

be placed

in the Public Document

Room.

If we do not hear

from you in this regard

within the specified period, the report will be placed in the Public

Document

Room.

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sin'cerely,

Enclosures:

A.

Notice of Violation

B.

IE Inspection

Report

No. 50-397/80-10

t

cc'w/o enclosure

B:

M.

E. 1Jitherspoon,

Division Manager

guality Assurance,

1JPPSS

M.

C. Bibb, Manager,

HNP-2 Project,

lJPPSS

G. S. Spencer,

Chief

Reactor Construction

and

Engineering

Support Branch