ML17275A725

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions
ML17275A725
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 11/14/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8012040233
Download: ML17275A725 (2)


Text

~ iiaql

+'

i O

r+

'~

M*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALlFORNIABOULEVARD SUlTE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNfA94596 November 14 1980 Docket Nos.. 50-397, 50-460, 50-508 50-509, 50-513 ic

<<1 C ~~

Mashfngton Public Power. Supply System P

0. Box 968, 3000 George Mashfngton May Richland,. Mas hi ngton 99352 Attentfon:

Mr. R. L. Ferguson Yanagfng Director Gentlemen:

Enclosed is lE BuIIetfn Ho.. 80-23 which requires. action by you. with regard to your nuclear power facility(fes) with an-operating I,icense or construction permit.

In order to assist. the.iIRC in evaluating the-value/impact of each bulletin on Ifcensees, it. would,be heIpful.ff;yo0.wouId.provide,-us; an; estimate of.;

the manpower expended in conduct of the review and preparation of the report(s).'="

required. by tt e buII'etin.

Please estimate separateIy ihe manpower associated with corrective actions-necessary fo11owing identification of problems, through the bulletin ShouId you have. any ques ions regarding this. bulletin or the: action required by you, please: contact this-office.

Sincerely, R.

H'., Engelkerr Director

Enclosures:

IF Bulletin No. 80-23 2.

Recently issued IE BuIIetfns cc w/encIosures:

H'. E.. Mftherspoon,,

MPPSS M. C. Bibb, MPPSS J'.

P. Thomas, MPPSS O. E. Oobson, MPPSS G. C. Sorensen, MPPSS