Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-81-482, Advises That Plant Design Data Re Containment Sump Info,Per NRC 811007 Request,Will Be Provided by 820305 + (ML17212B012)
- L-81-490, Notifies That Info Requested in NRC 810505 Generic Ltr 81-21 Re Natural Circulation Cooldown Was Provided During Review of OL Application + (ML17212B015)
- L-81-487, Advises That Util Will Provide Fully Authorized & Approved Emergency Operating Procedure for Station Blackout by 810331,in Confirmation of 811118 Telcon.Procedure Will Incorporate NRC & C-E Comments + (ML17212B016)
- M170193, GE-Hitachi Nuclear Energy Americas, LLC - Submittal of Response to NRC Request for Additional Information + (ML17212B019)
- ML17212B019 + (ML17212B019)
- ML17212B022 + (ML17212B022)
- L-81-493, Forwards Responses to Requests for Addl Info Re Turbine Missile Analysis.Response Will Be Incorporated Into FSAR in Future Amend + (ML17212B026)
- L-81-488, Forwards Oct 1981 Const/Startup Progress Rept.Revised Sept 1981 Rept Also Encl + (ML17212B027)
- ML17212B035 + (ML17212B035)
- ML17212B036 + (ML17212B036)
- ML17212B037 + (ML17212B037)
- ML17212B038 + (ML17212B038)
- L-81-495, Advises of Commitment to Insure That Plant Staff Can Be Augmented to Levels Specified in Table B-1 of NUREG-0654, Revision 1,within 45 to 75 Minutes of Notification. Capability Meets Intent of 10CFR50.47(b)(2) + (ML17212B039)
- ML17212B054 + (ML17212B054)
- ML17212B059 + (ML17212B059)
- L-81-485, Forwards Public Version of Revision 10 to Radiological Emergency Plan,Consisting of Organizational Change Affecting Emergency Central Officer Position + (ML17212B061)
- L-81-500, Informs That Response to 811109 Auxiliary Sys Branch Questions 410.40 & 410.43-46 Will Be Submitted by 811218 + (ML17212B067)
- ML17212B068 + (ML17212B068)
- IR 05000335/1981026 + (ML17212B070)
- ML17212B071 + (ML17212B071)
- IR 05000335/1981023 + (ML17212B073)
- L-81-503, Forwards Rept of const/start-up Progress for Oct 1981 & Revised Rept for Sept 1981 + (ML17212B074)
- ML17212B075 + (ML17212B075)
- IR 05000335/1981025 + (ML17212B077)
- ML17212B094 + (ML17212B094)
- ML17212B115 + (ML17212B115)
- 05000318/LER-1981-041-03, /03L-0:on 810813,plant Computer Failed,Rendering Incore Detector Monitoring Sys Inoperable.Caused by Analog/Digital Converter 1,failing to Read Ref Voltage Values Cycling in & Out of Normal Range.Converter Replaced + (ML17212B121)
- ML17212B123 + (ML17212B123)
- ML17212B142 + (ML17212B142)
- ML17212B149 + (ML17212B149)
- ML17212B151 + (ML17212B151)
- NL-17-1267, Report of Changes to Emergency Plan + (ML17212B152)
- ML17212B160 + (ML17212B160)
- ML17212B168 + (ML17212B168)
- RAIO-0717-55142, LLC Response to NRC Request for Additional Information No. 51 (Erai No. 8854) on the NuScale Design Certification Application + (ML17212B176)
- ML17212B177 + (ML17212B177)
- ML17212B179 + (ML17212B179)
- L-2017-124, Flooding Focused Evaluation Summary + (ML17212B180)
- ML17212B181 + (ML17212B181)
- L-81-510, Submits Instrumentation Installation Schedule for Inadequate Core Cooling Indication Per NUREG-0737.Full Sys Expected to Be Operational by 840115 + (ML17212B183)
- L-81-512, Advises of Review of Proposed Amends to Apps a & B of Tech Specs to Reflect Changes in Equipment & Operating Conditions,Per 811120 Telcon.Proposed Revisions Will Be Prepared for Discussion at Meeting Scheduled for Jan 1982 + (ML17212B184)
- ML17212B186 + (ML17212B186)
- ML17212B190 + (ML17212B190)
- ML17212B192 + (ML17212B192)
- ML17212B194 + (ML17212B194)
- L-81-520, Forwards Responses to Request for Addl Info Re Matrix Power Supply Isolation Device Testing.Responses Will Be Incorporated Into FSAR in Future Amend + (ML17212B197)
- ML17212B198 + (ML17212B198)
- ML17212B200 + (ML17212B200)
- ML17212B201 + (ML17212B201)
- ML17212B202 + (ML17212B202)
- ML17212B206 + (ML17212B206)