Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14248A308 + (ML14248A308)
- RS-14-239, Response to NRC Request for Additional Information, Set 40, Dated August 20, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application + (ML14248A322)
- RS-14-196, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14248A323)
- IR 05000156/2014202 + (ML14248A324)
- RS-14-198, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14248A327)
- ML14248A375 + (ML14248A375)
- ML14248A432 + (ML14248A432)
- CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant + (ML14248A478)
- CNL-14-131, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant + (ML14248A484)
- ML14248A490 + (ML14248A490)
- ML14248A493 + (ML14248A493)
- CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro + (ML14248A496)
- ML14248A499 + (ML14248A499)
- ML14248A505 + (ML14248A505)
- ML14248A514 + (ML14248A514)
- CNL-14-134, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order Number EA-12-049) for Watts Bar Nucle + (ML14248A517)
- ML14248A531 + (ML14248A531)
- ML14248A539 + (ML14248A539)
- ML14248A542 + (ML14248A542)
- ML14248A560 + (ML14248A560)
- ML14248A572 + (ML14248A572)
- LR-N14-0191, Spent Fuel Cask Registration - Hope Creek 2014 + (ML14248A574)
- ML14248A580 + (ML14248A580)
- ML14248A585 + (ML14248A585)
- ML14248A590 + (ML14248A590)
- ML14248A614 + (ML14248A614)
- ML14248A620 + (ML14248A620)
- ML14248A626 + (ML14248A626)
- IR 05000397/2014404 + (ML14248A632)
- ML14248A667 + (ML14248A667)
- ML14248A678 + (ML14248A678)
- CNL-14-127, Response to Request for Additional Information Related to Potential Loss of Spent Fuel Pool Cooling + (ML14248A681)
- IR 05000400/2014007 + (ML14248A696)
- ML14248A700 + (ML14248A700)
- IR 05000334/2014301 + (ML14251A006)
- RNP-RA/14-0082, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) + (ML14251A013)
- RNP-RA/14-0092, Relief Request (RR)-11 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1 + (ML14251A014)
- HNP-14-087, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14251A015)
- ML14251A016 + (ML14251A016)
- ML14251A023 + (ML14251A023)
- ML14251A024 + (ML14251A024)
- ML14251A025 + (ML14251A025)
- MNS-14-070, Duke Energy Request for NRC Grant Discretion from Enforcing the Shutdown Requirement of Technical Specifications (TS) 3.8.1 (AC Sources - Operating) + (ML14251A026)
- NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE18 + (ML14251A027)
- ML14251A027 + (ML14251A027)
- NOC-AE-14003164, Third Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation + (ML14251A028)
- ML14251A028 + (ML14251A028)
- NOC-AE-14003162, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) + (ML14251A029)
- ML14251A029 + (ML14251A029)
- ET 14-0029, Response to Request for Additional Information Regarding 10CFR50.55a Requests 13R-08 and 13R-09 + (ML14251A030)
- GO2-14-126, License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink + (ML14251A032)