ML14248A700

From kanterella
Jump to navigation Jump to search
2014 DC Cook Initial License Examination Form ES-201-2
ML14248A700
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML14218A305 List:
References
Download: ML14248A700 (1)


Text

ES-201, Rev. 9 Examination Outline Quality Checklist Form ES-201-2 Facility: D.C. Cook U1/U2 Date of Examination: Jul~ 21 -August 1, 2014 Initials Item Task Description a b* c#

1.

w a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401. f!l\0 i ,J/A Jill

b. Assess whether the outline was systematically and randomly prepared in accordance with R ~\)

I Section D.1 of ES-401 and whether all KIA categories are appropriately sampled. d*

T T

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. I<Y-\J ~

E d. Assess whether the justifications for deselected or rejected KIA statements are appropriate. ~\c)

N dAI&

2.

~

a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, s

and major transients.

I M b. Assess whether there are enough scenario sets (and spares) to test the projected number u and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using

~\.)

L at least one new or significantly modified scenario, that no scenarios are duplicated A

T from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days. d~

0 R

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative ~\) ~

and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form j&.\)

(3) no tasks are duplicated from the applicants' audit test(s)

3. (4) the number of new or modified tasks meets or exceeds the minimums specified on the form

~

w (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria I on the form.

T

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form

~\0 d"'

(2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. ~'#
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections. ~'W a.

G E

b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. fl..'W AM N c. Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5. ~\.) 4..

E d. Check for duplication and overlap among exam sections. ~w A..

R A e. Check the entire exam for balance of coverage. ~"" iLk L f. Assess whether the exam fits the appropriate job level (RO or SRO). ~'w ~

a. Author ~~e/~

R. Keith Walton 1 - - - - - _ _ _ _ _

Date 02/05/2014

b. Facility Reviewer(*) n/a n/a
c. NRC Chief Examiner (#) Dell R. McNeil/ _A'_,.L;£/ hA. ./A_,:£) 02/05/204
d. NRC Supervisor Hironori

-, ~

Peterson'-~~:e"<...-'ffP.."-~

~

~

~~//f f/

Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.