ML14248A667

From kanterella
Jump to navigation Jump to search
2014 DC Cook Initial License Examination Form ES-301-1 and ES-301-2
ML14248A667
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML14218A305 List:
References
Download: ML14248A667 (5)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: ___D C Cook_U1/U2______ Date of Examination: ___7/21 - 8/1, 2014 Examination Level: RO SRO Operating Test Number: _2014301__

Administrative Topic Type Describe activity to be performed (see Note) Code*

Conduct of Operations M,R Perform a shutdown margin verification for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after shutdown with the computer inoperable.

Conduct of Operations N,S Evaluate License Holders Qualification Status Equipment Control N,S Perform a shift surveillance check. Mode 1&2 Radiation Control N,R Determine Locked High Radiation Area (LHRA) Entry Requirements.

Emergency Procedures/Plan n/a NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: ___D C Cook_U1/U2______ Date of Examination: __7/21 - 8/1, 2014_

Exam Level: RO SRO Operating Test Number: _2014301_

Administrative Topic Type Describe activity to be performed (see Note) Code*

Conduct of Operations M,R Review a shutdown margin calculation.

Conduct of Operations N,S Evaluate License Holders Qualification Status Equipment Control N,R Review and approve a shift surveillance check. Mode 1&2 Radiation Control N,R Review and authorize a Waste Gas Release Permit.

Emergency Procedures/Plan M,R Classify an event and make the PARs NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___D C Cook U1/U2____________ Date of Examination: __7/21 - 8/1, 2014_

Exam Level: RO SRO-I SRO-U Operating Test No.: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. Place Hydrogen Recombiner in Service N,A,S 5
b. RHR - Transfer RHR to cold leg recirculation D,A,S,L,EN 4(P)
c. Synchronize the Main Turbine Generator to the grid N,S 6
d. ECCS - Fill SI Accumulator N,S,EN 2
e. PZR - Perform heater capacity check N,S 3
f. Containment Pressure Relief - Relieve excess pressure from N,A,S,L 8 containment
g. Radiation Monitor - Respond to High Control Room Radiation N,A,S,L 7
h. Perform Emergency Boration due to Shutdown Margin Not Met D,A,S 1 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
h. Auxiliary Feedwater - Hookup alternate source of water for the M,A,L,EN 4(S)

TDAFW (ESW)

i. Spent Fuel Pool Cooling - Manually makeup to SFP from the N,R 8 RWST
j. EDG - Locally Start and Control DG2AB N,R,E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___D C Cook_U1/U2______ Date of Examination: __7/21 - 8/1, 2014 Exam Level: RO SRO-I SRO-U Operating Test No.: _2014301_____

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Safety Type Code*

Function

a. Place Hydrogen Recombiner in Service N,A,S 5
b. RHR - Transfer RHR to cold leg recirculation D,A,S,L,EN 4(P)
c. Synchronize the Main Turbine Generator to the grid N,S 6
d. ECCS - Fill SI Accumulator N,S,EN 2
e. PZR heater current STP - Perform heater capacity check N,S 3
f. CNMT Pressure Relief - Relieve excess pressure from N,A,S,L 8 containment
g. Radiation Monitor - Respond to High Control Room Radiation N,S,L 7
h. n/a n/a n/a In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Auxiliary Feedwater - Hookup alternate source of water for the N,A,L,EN 4(S)

TDAFW (ESW)

j. Spent Fuel Pool Cooling - Manually makeup to SFP from the N,R 8 RWST
k. Locally Start and Control DG2AB N,A,R,E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___D C Cook_U1/U2______ Date of Examination: ___7/21 - 8/1, 2014_

Exam Level: RO SRO-I SRO-U Operating Test No.: _2014301_____

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. Hydrogen Recombiner Startup N,S 5
b. RHR - Transfer RHR to cold recirculation N,A,S,L,EN 4(P)
c. n/a
d. ECCS - Fill SI Accumulator N,S,EN 2
e. n/a
f. n/a
g. n/a
h. n/a In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Auxiliary Feedwater - Hookup alternate source of water for the N,A,L,EN 4(S)

TDAFW (ESW)

j. Spent Fuel Pool Cooling - Manually makeup to SFP from the N,R 8 RWST
k. n/a

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator