MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 15, 2014 Mr. Rafael Flores Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2-CORRECTION TO FIGURES PROVIDED IN RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 12-007 REGARDING TWO, 14-DAY, ONE-TIME COMPLETION TIMES FOR OFFSITE CIRCUITS (TAC NOS. MF3480 AND MF3481)
Dear Mr. Flores:
By letter dated December 19, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13023A237), as supplemented by letter dated May 16, 2013 (ADAMS Accession No. ML13149A257), Luminant Generation Company LLC (Luminant, the licensee) submitted license amendment request (LAR)12-007 to revise Technical Specification (TS) 3.8.1, "AC [Alternating Current] Sources- Operating," to extend, on a one-time basis, an allowable completion time (CT) associated with restoration of an inoperable offsite circuit, from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days (to be used twice) to install an additional startup transformer (XST) 1A. The U.S. Nuclear Regulatory Commission (NRC) staff issued Amendment No. 160 to Facility Operating License No. NPF-87 and Amendment No. 160 to Facility Operating License No. NPF-89 for Comanche Peak Nuclear Power Plant, Units 1 and 2, respectively, by letter dated September 18, 2013 (ADAMS Accession No. ML13232A143).
By letter dated February 13, 2014 (ADAMS Accession No. ML14057A804), the licensee informed the NRC staff that Figures 8.211, 8.2-11A, 8.3-1, 8.3-6, and Unit 2 Generator Layout one line diagram provided as part of the response to request for additional information by letter dated May 16, 2013, had minor inconsistencies. The nature of the inconsistencies are as described below:
Figure 8.2-11:
Figure 8.2-11 incorrectly shows transfer boxes CPX-EPTSST-04Y and CPX-EPTSST-05Y interfacing with XST2-X winding buses from Tap box 7 to Unit 2 switchgears 2EA1 and 2EA2, respectively. Figure 8.3-1 correctly shows transfer boxes CPX-EPTSST-04Y and CPX-EPTSST-05Y interfacing with Tap box 6 for XST1-Y winding buses to Unit 2 switchgears 2EA1 and 2EA2. In addition, Tap box 6 for XST1-Y winding was incorrectly shown in Unit 2 normal switchgear room on Figure 8.2-11 and this error could also have been identified if Figure 8.2-11, was reviewed against Figure 8.3-1.
R. Flores Figure 8.2-11A:
Corrected the cable bus location in relation to transfer box CPX-EPTSST-05Y.
Figure 8.3-1:
The dashed lines around the Eaton bus bars on Figure 8.3-1 denote the equipment is 1E but it is not.
Figures 8.3-6 for Units 1 and 2:
The dashed lines around the Alternate Power Diesel Generators (APDGs) on both Figures of 8.3-6 denote the equipment is 1E but it is not.
Unit 2 Generator Layout:
The Unit 2 Generator Layout one line diagram was missing an arrow pointing at the cables between the APDG set and the transformer with the words stating "5-1/C-#4/0 AWG CU CABLES PER PHASE" and the arrow pointing to the 5-inch conduit should have shown the words "1-1 /C-500 MCM" instead of the words "5-1/C-#4/0 AWG."
The licensee stated that inconsistencies did not have any impact on the no significant hazards consideration provided by letter dated December 19, 2012, and does not change the conclusions of the NRC's safety evaluation dated September 18, 2013.
The NRC staff evaluated the inconsistencies and the corrected figures provided by letter dated February 13, 2014, and determined that the corrections to the figures are related to incorrect identification of specific auxiliary component items of the switchyard system and do not affect the electrical system configuration and its performance. Hence, the NRC concludes that corrections to Figures 8.2-11, 8.2-11A, 8.3-1, 8.3-6, and Unit 2 Generator Layout one line diagram do not impact the conclusions of the NRC staff's safety evaluation transmitted by letter dated September 18, 2013, and those conclusions remain valid.
R. Flores If you have any questions, please call me at 301-415-3016 or via e-mail at Balwant. Sinqal@nrc.gov.
Sincerely, 5~~ c~,h:cY--
Balwant K. Singal, Senior Projeel Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 cc: Distribution via Listserv
R. Flores If you have any questions, please call me at 301-415-3016 or via e-mail at Balwant.Singal@nrc.gov.
Sincerely, IRA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 Reading RidsAcrsAcnw MaiiCTR Resource RidsNrrDoriDpr Resource RidsNrrDorllpl4-1 Resource RidsNrrDeEeeb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMComanchePeak Resource RidsRgn4MaiiCenter Resource SBasturescu, NRRIDE/EEEB ADAMS Accession No.: ML14248A572 OFFICE NRR/DORL/LPL4-1/PM NRRIDORL/LPL4-1/LA NRR/DORLILPL4-1/BC(A) NRRIDORLILPL4-1/PM NAME BSingal JBurkhardt EOesterle BSingal DATE 9/12/14 9/11/14 9/15/14 9/15/14 OFFICIAL AGENCY RECORD