Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13242A247 + (ML13242A247)
- ML13242A248 + (ML13242A248)
- ML13242A252 + (ML13242A252)
- ML13242A253 + (ML13242A253)
- ML13242A254 + (ML13242A254)
- ML13242A256 + (ML13242A256)
- ML13242A266 + (ML13242A266)
- RC-13-0117, 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation + (ML13242A272)
- RC-13-0123, V. C. Summer, Unit 1 - First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (ML13242A273)
- L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML13242A274)
- ML13242A277 + (ML13242A277)
- ML13242A290 + (ML13242A290)
- ULNRC-06032, Callaway Plant Unit 1 - Response to RAI Set 26 and Amendment 26 to the Callaway LRA + (ML13242A290)
- ML13242A291 + (ML13242A291)
- ULNRC-06032, Enclosure 2 - Amendment 26, LRA Changes + (ML13242A292)
- NL-13-1865, Response to the Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML13242A293)
- ULNRC-06035, CFR 50.55a(a)(3) Requests for Relief from ASME OM Code Pump and Valve Testing Requirements Regarding the Frequency of Inservice Tests + (ML13242A294)
- ML13242A307 + (ML13242A307)
- ML13242A336 + (ML13242A336)
- BW130080, Withdrawal of License Candidate from the September 4, 2013 Pressurized Water Reactor (PWR) Generic Fundamentals Examination + (ML13242A352)
- ML13242A356 + (ML13242A356)
- ML13242A367 + (ML13242A367)
- ML13246A003 + (ML13246A003)
- IR 05000271/2013006 + (ML13246A005)
- ML13246A007 + (ML13246A007)
- ML13246A008 + (ML13246A008)
- ML13246A009 + (ML13246A009)
- ML13246A010 + (ML13246A010)
- ML13246A012 + (ML13246A012)
- ML13246A014 + (ML13246A014)
- ML13246A016 + (ML13246A016)
- IR 05000220/2013006 + (ML13246A017)
- ML13246A019 + (ML13246A019)
- ML13246A022 + (ML13246A022)
- ML13246A050 + (ML13246A050)
- ML13246A054 + (ML13246A054)
- ML13246A059 + (ML13246A059)
- ML13246A066 + (ML13246A066)
- ML13246A068 + (ML13246A068)
- RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter + (ML13246A074)
- NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding + (ML13246A075)
- ML13246A076 + (ML13246A076)
- NL-13-070, Letter Regarding Entergys Response to the March 12, 2012, Information Request, Enclosure 5, Recommendation 9.3, Emergency Preparedness - Staffing + (ML13246A077)
- L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses + (ML13246A080)
- ML13246A084 + (ML13246A084)
- ML13246A087 + (ML13246A087)
- ML13246A100 + (ML13246A100)
- ML13246A103 + (ML13246A103)
- L-13-274, Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations + (ML13246A104)
- IR 05000443/2013006 + (ML13246A107)
- ML13246A110 + (ML13246A110)