ML13246A012
| ML13246A012 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/28/2013 |
| From: | Batson S Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML13246A012 (2) | |
Text
"
DUKE Scot L.
ENERGY Prsdnt
~ENERGY, Oconee Nuclear Station Duke Energy ONOIVP 1 7800 Rochester Hwy 10 CFR 50.4 Seneca, SC 29672 o: 864.873.3274 August 28, 2013 f 864.873.4208 Scott.Batson@duke-energy.com ATTN: Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2746
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 Completion of Protected Service Water System Milestone 1
Reference:
NRC letter to Duke Energy, "NOTICE OF VIOLATION AND CONFIRMATORY ORDER RELATED TO A FIRE PROTECTION PROGRAM LICENSE CONDITION (OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3)," dated July 1, 2013 The confirmatory order (Reference) related to an ONS fire protection program license condition requires Duke Energy to report the completion of each milestone within 30 days of Completion.
Duke Energy completed Milestone 1 on August 2, 2013. Milestone 1 requires Duke Energy to provide ONS the capability to supply off-site electrical power to the PSW building switchgear and from there to the SSF switchgear, with sufficient capacity to operate all credited SSF equipment in the event of a failure of the SSF diesel generator during a fire for which the SSF is credited. The order requires this modification, along with approved plant procedures and the completion of operator training necessary to accomplish this lineup, and a combination of testing and engineering evaluation in accordance with station procedures which verifies this capability, to be completed and operational no later than October 1, 2013.
If there are any additional questions, please contact Terry Patterson, ONS Safety Assurance, at (864) 873-3163.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 28, 2013.
Sincerely, 4ct L.iato Vice President Oconee Nuclear Station
1 Nuclear Regulatory Commission August 28, 2013 Page 2 cc:
Mr. Victor McCree, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. John Boska, Senior Project Manager (by electronic mail only)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Ed Crowe Senior Resident Inspector Oconee Nuclear Site Ms. Susan E. Jenkins, Manager Radioactive & Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.
Columbia, SC 29201