Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13141A748 + (ML13141A748)
- ML13142A009 + (ML13142A009)
- ML13142A012 + (ML13142A012)
- NL-13-077, License Renewal Application-Update to Electrical Meb and Structures Monitoring Program Scope, Aging Management Programs + (ML13142A013)
- ML13142A014 + (ML13142A014)
- PLA-7000, Annual Report on Radiation Exposure Per 10 CFR 20.2206, PLA-7000 + (ML13142A030)
- BSEP 13-0039, Submittal of Cycle 21 Core Operating Limits Report (COLR) + (ML13142A031)
- ML13142A032 + (ML13142A032)
- 05000423/LER-2013-004, Regarding Failed Surveillance Test of a Train Control Room Emergency Filtration System + (ML13142A033)
- ML13142A035 + (ML13142A035)
- IR 05000336/2013403 + (ML13142A060)
- IR 05000245/2013403 + (ML13142A060)
- Press Release-II-13-039, NRC Begins Special Inspection at Harris Nuclear Power Plant + (ML13142A092)
- ML13142A104 + (ML13142A104)
- ML13142A106 + (ML13142A106)
- IR 05000369/2013404 + (ML13142A112)
- ML13142A112 + (ML13142A112)
- L-2013-125, 2012 Annual Environmental Operating Report + (ML13142A118)
- ML13142A148 + (ML13142A148)
- ML13142A157 + (ML13142A157)
- ML13142A160 + (ML13142A160)
- ML13142A163 + (ML13142A163)
- ML13142A165 + (ML13142A165)
- ML13142A167 + (ML13142A167)
- ML13142A169 + (ML13142A169)
- ML13142A172 + (ML13142A172)
- ML13142A183 + (ML13142A183)
- ML13142A186 + (ML13142A186)
- BVY 13-046, 2012 Radioactive Effluent Release Report + (ML13142A190)
- ML13142A191 + (ML13142A191)
- 05000482/LER-2013-005, Regarding Fatigue Failure of Jacket Water Pressure Switch Diaphragm Results in Loss of the B Diesel Generator + (ML13142A192)
- L-13-136, Occupational Radiation Exposure Report for Year 2012 + (ML13142A193)
- ML13142A194 + (ML13142A194)
- ML13142A195 + (ML13142A195)
- NOC-AE-13002985, Financial Assurance for Decommissioning - 2013 Update + (ML13142A196)
- ML13142A196 + (ML13142A196)
- ML13142A197 + (ML13142A197)
- ML13142A198 + (ML13142A198)
- ML13142A199 + (ML13142A199)
- 05000335/LER-2013-001, Regarding Automatic Reactor Trip Due to Failure of the Lb Main Steam Isolation Valve + (ML13142A200)
- L-2013-165, Extended Power Uprate Cycle 24 Startup Report, Revision 1 + (ML13142A201)
- NL-13-052, Reply to Request for Additional Information Regarding the License Renewal Application + (ML13142A202)
- NL-13-071, Entergy, Actions Required Prior to Entry Into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Energy Center Unit 2 + (ML13142A203)
- L-13-125, Physical Security Plan (Revisions 13, 14 and 15) + (ML13142A206)
- ML13142A211 + (ML13142A211)
- BSEP 13-0052, Independent Spent Fuel Storage Installation (Isfsi), Registration and Use of Cask to Store Spent Fuel + (ML13142A212)
- ML13142A213 + (ML13142A213)
- ML13142A214 + (ML13142A214)
- ML13142A215 + (ML13142A215)
- NL-13-072, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions + (ML13142A226)
- ML13142A227 + (ML13142A227)