2013 Byron Nuclear Station Initial License Examination Proposed Control Room JPMs
ML13142A167
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/11/2013
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
50-454/13-301, 50-455/13-301
Download: ML13142A167 (42)


Text

Exelon Nuclear Job Performance Measure Excess Letdown Operations JPM Number: CR a Revision Number: 8 Date: 2/22/2013 Revised By: Bill Hochstetter 2/22/13 Instructor Date Validated By: Kelly Wilson 03/03/2013 Operations Representative Date Approved By: Rob Lawlor 03/03/2013 Operations Representative nt Date

CR JPM a.

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. 1CV459 has failed closed and MM are investigating the cause of the failure.
3. Normal charging has been isolated.
4. Reactor power is < 99.5%.

INITIATING CUE

1. The US directs you to establish excess letdown to the VCT using the A loop drain and BOTH letdown heat exchangers for maximum cooling.
2. The SM does NOT desire flow to be directed to the VCT spray nozzle and is aware of the procedural limitations associated with this alignment.
3. Rad Protection has been informed of this evolution.
4. Another NSO will respond to ALL other Control Room annunciators and conditions

CR JPM a.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to BOP CV-15 ° LOCATE and OPEN BOP Note: May be performed at any CV-15 time Cue: Prerequisites are met Cue: (if asked) It is not necessary to use an EST
2. Verify/open 1CV8100
  • 1CV8100 is OPEN
3. Verify/open 1CV8112
  • 1CV8112 is OPEN
  • 4. Establish CC flow to the Excess
  • 1CC9437B is OPEN Letdown Heat Exchangers
  • 1CC9437A is OPEN
5. Verify closed 1CV123
  • 1CV123 is closed
6. Verify/direct flow to VCT
  • 1CV8143 selected to VCT
  • 7. Open loop drain valve
  • Open at least one loop drain valve 1RC8037A,
  • 8. Open Excess Ltdn HX inlet valve
  • 1CV8153A and B are OPEN
  • 9. Open flow control valve and
  • 1CV123 is throttled OPEN ensure Excess Ltdn outlet
  • 1TI-122A <165°F temperature stabilizes at <165°F.

Cue: This JPM is completed.

RECORD STOP TIME:

CR JPM a.

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. 1CV459 has failed closed and MM are investigating the cause of the failure.
3. Normal charging has been isolated.
4. Reactor power is < 99.5%.

INITIATING CUE

1. The US directs you to establish excess letdown to the VCT using the A loop drain and BOTH letdown heat exchangers for maximum cooling.
2. The SM does NOT desire flow to be directed to the VCT spray nozzle and is aware of the procedural limitations associated with this alignment.
3. Rad Protection has been informed of this evolution.
4. Another NSO will respond to ALL other Control Room annunciators and conditions

Exelon Nuclear Job Performance Measure Raise Letdown flow from 75 to 120 gpm JPM Number: CR-b Revision Number: 00 Date: 1/24/2013 Revised By: Bill Hochstetter 1/24/13 Instructor Date Validated By: Kelly Wilson 3/3/2013 Operations Dept. Date Approved By: /s/Rob Lawlor 3/3/2013 Operations Representative Date

CR JPM b.

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL
3. Letdown flow is currently 75 gpm INITIATING CUE
1. You have been directed to raise letdown flow to 120 gallons per minute and then restore systems to automatic in accordance with BOP CV-9, step 2.
2. Inform the US when complete.
3. Another NSO will respond to ALL other Control Room annunciators and conditions.

CR JPM b.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee Locate and OPEN BOP

1. Refer to BOP CV-9, Letdown CV-9, step F.2 Orifice Operation Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Provide the examinee with a copy of the BOP CV-9 The evaluator may judge the candidate, if performed on the simulator, by correctly performing the critical steps, and the candidates competency by NOT receiving the following alarms:
  • 1-9-B1 LP LTDWN REL TEMP HIGH
  • 1-9-A1 REGEN HX LTDWN TEMP HIGH
  • 1-9-E2 LTDWN TEMP HIGH
  • 1-9-D3 CHG LINE FLOW HI LOW
  • 1-7-B2 RCP SEAL WTR INJ FLOW LOW
2. Adjust _CV121, in manual to At 1PM05J:

compensate for additional ltdwn flow

  • Place _CV121 in Manual Cue: _FK121 manual light is LIT
  • Raise charging flow to Cue: charging flow is reading about about 132 gpm using the 132 gpm on 1FI-121A raise pushbutton as indicated on 1FI-121A

CR JPM b.

Comment ELEMENT STANDARD SAT UNSAT Number

  • 3. Place _PCV-CV131 to manual and At _PM05J:

lower letdown pressure to ~180 psig.

  • PLACE _CV131 in MANUAL AND
  • LOWER letdown pressure to ~180 psig by raising output on 1PK-131 NOTE The examinee may decide that step 4 is NOT required and go to step 5.
4. If required, ADJUST _CC130A/B, as At _PM05J:

necessary o Place 1TK-130 in MANUAL AND o RAISE Output

  • 5. Raise letdown flow from 75 gpm At _PM05J:

to 120 gpm letdown

  • SIMULTANEOUSLY OPEN NOTE to Evaluator: Evaluate the _CV8149A alarms that annunciate to determine competency of manual operations of AND controls in previous 3 steps
  • SIMULTANEOUSLY ADJUST PCV-_CV131 to maintain pressure ~370 psig
6. Restore _PCV-CV131 to AUTO At _PM05J:
  • PLACE _CV131 in AUTO NOTE If examinee manipulated _CC130A/B in manual to control letdown temperature perform step 7. If the valve was not manipulated and temperature is normal, step 7 may be bypassed.

CR JPM b.

Comment ELEMENT STANDARD SAT UNSAT Number

7. Ensure _CC130A/B is maintaining At 1PM05J:

normal letdown temperature of about120 °F.

° Check letdown temp.

normal on _TI-130

8. Adjust _CV121, in manual to match At 1PM05J:

charging and letdown flow while establishing PZR at program level o Adjust _CV121 in Manual o Verify charging flow is about 12 gpm greater than letdown flow and PZR level is trending to program.

  • Place _FK-121 in AUTO Cue:(if required) This JPM is Informs US that 120 gpm completed: letdown flow is in service RECORD STOP TIME:

CR JPM b.

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL
3. Letdown flow is currently 75 gpm INITIATING CUE
1. You have been directed to raise letdown flow to 120 gallons per minute and then restore systems to automatic in accordance with BOP CV-9, step 2.
2. Inform the US when complete.
3. Another NSO will respond to ALL other Control Room annunciators and conditions.

Exelon Nuclear Job Performance Measure Perform Transfer to Hot Leg Recirc (1SI-8840 will not OPEN)

JPM Number: CR-c Revision Number: 00 Date: 1/24/2013 Revised By: Bill Hochstetter 1/24/13 Instructor Date Reviewed By: Chuck Guernsey 03/03/2013 Operations Representative Date Approved By: Rob Lawlor 03/03/2013 Operations Representative Date

CR JPM c.

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. A large LOCA is in progress.
3. 1BEP-1 step 19 has been completed.
4. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 50 minutes has elapsed since SI was actuated.
5. The Shift Manager is aware of this procedure transition INITIATING CUE
1. The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.

CR JPM c.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee Once the examinee references the procedure the evaluator may hand the candidate a copy of 1BEP ES-1.4

1. Refer to 1BEP ES-1.4, Transfer to LOCATE and OPEN Hot Leg Recirculation 1BEP ES-1.4 Note: This step may be performed at any time.
  • 2. Place SVAG Valve Bus Feeds to At 1PM06J, CLOSE:

Close.

  • 480V Feed to Bus 131X1A/X2A
  • 480V Feed to Bus 132X2A/X4A
3. Close RH to cold legs isol valves. At 1PM06J, CLOSE:
  • 1SI8809A
  • 1SI8809B
4. Check 1A RH pump running. At 1PM06J:
  • CHECK RHR pump 1A RUNNING
5. OPEN Train A RH HX discharge At 1PM06J:

crosstie header valve

  • OPEN 1RH8716A NOTE Alternate Path JPM starts here
  • 6. Open RH to hot legs isol valve. At 1PM06J:
  • Recognize that 1SI8840 will not OPEN

CR JPM c.

Comment ELEMENT STANDARD SAT UNSAT Number

  • 7. CLOSE any open RH HX discharge At 1PM06J:

crosstie header valve

  • CLOSE 1RH8716A
  • CLOSE 1RH8716B
  • 8. OPEN RH to cold legs isol. valves At 1PM06J:
  • OPEN 1SI8809A
  • OPEN 1SI8809B
  • 9. Stop SI pump 1A. At 1PM06J:
  • STOP 1A SI pump
  • 10. Close SI pump 1A to cold legs isol At 1PM06J:

valve.

  • CLOSE 1SI8821A
  • 11. Open SI pump 1A to hot legs isol At 1PM06J:

valve.

  • OPEN 1SI8802A
  • 12. Start the 1A SI pump. At 1PM06J:
  • START 1A SI pump
  • 13. Stop SI pump 1B. At 1PM06J:

STOP 1B SI pump

  • 14. Close SI pump 1B to cold legs isol At 1PM06J:

valve.

  • CLOSE 1SI8821B
  • 15. Open SI pump 1B to hot legs isol At 1PM06J:

valve.

  • OPEN 1SI8802B
  • 16. Start the 1B SI pump. At 1PM06J:
  • START 1B SI pump
17. Check SI pumps to hot legs isol At 1PM06J, Verify OPEN valves open 1SI8802A 1SI8802B
  • 18. Close SI pumps to cold leg isol At 1PM06J:

valve

  • CLOSE 1SI8835

CR JPM c.

Comment ELEMENT STANDARD SAT UNSAT Number

19. Place SVAG Valve Bus Feeds to At 1PM06J, TRIP TRIP.

480V Feed to Bus 131X1A/X2A 480V Feed to Bus 132X2A/X4A Cue: This JPM is completed RECORD STOP TIME:

CR-c INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. A large LOCA is in progress.
3. 1BEP-1 step 19 has been completed.
4. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 50 minutes has elapsed since SI was actuated.
5. The Shift Manager is aware of this procedure transition INITIATING CUE 1 The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.

Exelon Nuclear Job Performance Measure Align the SX towers for LOCA conditions (Failure of OG SX tower fan to start)

JPM Number: CR JPM d.

Revision Number: 04 Date: 01 / 25 / 2013 Developed By: W. Hochstetter 01/25/2013 Instructor Date Validated By: Greg Gugle 03/03/2013 SME or Instructor Date Approved By: Rob Lawlor 03/03/2013 Operations Representative Date

CR JPM d.

INITIAL CONDITIONS

1. You are the Unit 2 Assist NSO.
2. A LOCA is in progress with containment spray actuated
3. 2BEP-0 is in progress.

INITIATING CUE The Unit Supervisor directs you to align the SX towers per 2BEP-0, step 14.g.

CR JPM d.

JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

If this JPM is performed on the simulator, only the underlined cues are required to be provided to the examinee.

Once the examinee references the procedure the evaluator may hand the candidate a copy of 2BEP 0 step 14.g o LOCATE and OPEN 1 Refer to 2BEP 0 ___ ___ ___

2BEP 0 At 0PM01J

  • 2 Verify/open all 8 SX tower riser valves VERIFY/OPEN:

o 0SX163A o 0SX163B

  • 0SX163C
  • 0SX163D o 0SX163E o 0SX163F o 0SX163G o 0SX163H NOTE: If this JPM is performed in the plant, then some or all of the SX tower bypass valves may be open. Give the appropriate cues if the bypass valve is open.

The examinee may elect not to close the valve if SX pump discharge temperature is less than 52°F as the valve will immediately automatically reopen.

3 Verify/close all 4 hot water At 0PM01J ___ ___ ___

basin bypass valves VERIFY/CLOSE:

o 0SX162A o 0SX162B o 0SX162C o 0SX162D

CR JPM d.

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

The 0G SX tower fan will not be allowed to start in the following series of steps and therefore starts the alternate path required to accomplish the SX Tower alignment task. The examinee may attempt to start the fan a second time. If so, provide the appropriate cues.

ALTERNATE PATH STARTS HERE

  • 4 Verify/start all 8 SX cooling At 0PM01J ___ ___ ___

tower fans in High Speed Verify/start in High Speed:

o 0SX03CA o 0SX03CB

  • 0SX03CC
  • 0SX03CD o 0SX03CE o 0SX03CF (wont start): If examinee o 0SX03CG expresses to the evaluator CUE: understand 0SX03CG wont start. o 0SX03CH
  • 5 Close riser valve for 0G SX At 0PM01J ___ ___ ___

tower fan

  • Close 0SX163G Cue: Outside air temperature is 80°F CUE This JPM is complete.

JPM Stop Time:

CR JPM d.

INITIAL CONDITIONS

1. You are the Unit 2 Assist NSO.
2. A LOCA is in progress with containment spray actuated.
3. 2BEP-0 is in progress.

INITIATING CUE The Unit Supervisor directs you to align the SX towers per 2BEP-0, step 14.g.

Exelon Nuclear Job Performance Measure Align Containment Spray for Recirculation JPM Number: CR JPM e.

Revision Number: 02 Date: 01 / 25 / 2013 Developed By: W. Hochstetter 1/25/13 Instructor Date Validated By: Chuck Guernsey 03/03/2013 Validator/SME Date Approved By: Rob Lawlor 03/03/2013 Operations Representative Date

CR JPM e.

TASK STANDARDS:

1. Align 1A containment spray pump suction to the containment recirculation sump prior to the pump losing suction (RWST level < 9% or exhibiting signs of cavitation).
2. Determine 1CS009B will not open.
3. Stop 1B containment spray pump prior to the pump losing suction (RWST level < 9% or exhibiting signs of cavitation).
4. Isolate both containment spray pumps from the RWST.

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 has experienced a LOCA.
3. 1A and 1B Containment Spray pumps are running.
4. RWST level is as indicated.
5. 1BEP ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, has been completed up to step 9.

INITIATING CUE

1. The Unit 1 Unit Supervisor has directed you to align 1A and 1B Containment Spray pumps per step 9 of 1BEP ES-1.3.
2. Inform the Unit 1 Unit Supervisor when you have completed aligning the CS pumps.

CR JPM e.

JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT number

1. Refer to 1BEP ES-1.3, Transfer Refer to 1BEP ES-1.3, Transfer ___ ___ ___

to Cold Leg Recirculationto Cold Leg Recirculation, step 9.

2 Determines RWST level is Perform the following at ___ ___ ___

appropriate for CS pump 1PM06J:

suction swap to CNMT sump

  • Check RWST LEVEL LO-3 status lights lit.
  • Determine RWST level is appropriate for CS pump suction swap to sump.

NOTE: EVALUATOR NOTE: Alternate path begins here.

  • 3 Open 1CS009A & B Perform the following at ___ ___ ___

1PM06J:

  • Place 1CS009A & B, CS pump 1A & 1B sump suction valves, control switches to open.

Determine 1CS009B valve will

  • Determine 1CS009B will not NOT open. open.

o Inform US 1CS009B will not open.

  • 4 Stop 1B CS Pump Perform the following at ___ ___ ___

1PM06J:

  • Determine 1B CS pump must be stopped.
  • Stop 1B CS pump prior to the pump losing suction (RWST level < 0.5%).
  • 5 Isolate 1A & 1B CS Pump from Perform the following at ___ ___ ___

the RWST. 1PM06J:

  • Place 1CS001A & B, CS pump 1A & 1B RWST suction valves, control switches to close.

6 Verify 1A CS pump running. Verify 1A CS pump run light lit. ___ ___ ___

CUE This JPM is complete.

JPM Stop Time:

CR JPM e.

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 has experienced a LOCA.
3. 1A and 1B Containment Spray pumps are running.
4. RWST level is as indicated.
5. 1BEP ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, has been completed up to step 9.

INITIATING CUE

1. The Unit 1 Unit Supervisor has directed you to align 1A and 1B Containment Spray pumps per step 9 of 1BEP ES-1.3.
2. Inform the Unit 1 Unit Supervisor when you have completed aligning the CS pumps.

Exelon Nuclear Job Performance Measure Synchronize a SAT to a Bus being Fed by a DG JPM Number: CR JPM f.

Revision Number: 09 Date: 01 / 30 / 2013 Developed By: Bill Hochstetter 1/30/2013 Instructor Date Validated By: Greg Gugle 3/3/2013 SME or Instructor Date Approved By: Rob Lawlor 3/3/2013 Operations Representative Date

CR JPM f.

INITIAL CONDITIONS

1. You are an extra NSO.
2. The unit is in MODE 1.
3. The 1B DG was started manually and is supplying bus 142 to support Unit 1 SAT restoration per BOP AP-52
4. OP AP-52 is complete up to step F.18.f INITIATING CUE The US directs you to synchronize the SAT back to bus 142 by placing the 1B DG in parallel to the grid per BOP AP-32.

CR JPM f.

JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE: If this JPM is given on the simulator, only the cues underlined are required to be given to the trainee.

1 Refer to BOP AP-32 LOCATE and OPEN BOP AP- ___ ___ ___

32 CUE All prerequisites are met.

2 Check method of DG start At 1 PM01J: ___ ___ ___

o Leave Mode C/S in AUTO 3 Verify the D/G is running At 1 PM01J: ___ ___ ___

normally o Check DG frequency is about 60 Hz o Check DG voltage is about 4160 volts

  • 4 Turn synchroscope on At 1 PM01J:
  • TURN SAT 142-2 Feed to 4KV Bus 142 SYNC ACB1422 switch to ON 5 Verify minimum incoming At 1 PM01J:

voltage

  • VERIFY DIV 12 incoming voltage > 114 VAC
  • 6 Verify/Adjust DG voltage At 1 PM01J:
  • ADJUST DG voltage control so running voltage is slightly higher than incoming voltage

CR JPM f.

Comment STEP ELEMENT STANDARD SAT UNSAT Number 7 Verify on all three phases At 1 PM01J:

voltages are equal VERIFY DG voltage meter indicates the same voltage when DG voltmeter selector switch in placed in the following positions:

  • ØCA NOTE: If the governor is adjusted in LOWER direction, the synchroscope will rotate faster in the FAST direction..
  • 8 Adjust frequency At 1 PM01J:
  • PLACE DG governor adjust in RAISE until DIV 12 synchroscope is rotating slowly in the SLOW direction
  • 9 Close ACB 1422 At 1 PM01J:

WHEN DIV 12 synchroscope is slightly before the 12 oclock position:

  • CLOSE ACB 1422 o CHECK ACB 1422 closed 10 Verify successful parallel At 1 PM01J:

operation

  • VERIFY synchroscope is locked in at 12 oclock position 11 Turn synchroscope off At 1 PM01J:
  • For ACB 1422 PLACE synchroscope switch in OFF NOTE: When Trainee has stabilized DG loading (so as to not get a reverse power trip on the output breaker) cue:

CR JPM f.

Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE This JPM is complete.

JPM Stop Time:

CR JPM f.

INITIAL CONDITIONS

1. You are an extra NSO.
2. The unit is in MODE 1.
3. The 1B DG was started manually and is supplying bus 142 to support Unit 1 SAT restoration per BOP AP-52.
4. 4.BOP AP-52 is complete up to step F.18.f INITIATING CUE The US directs you to synchronize the SAT back to bus 142 by placing the 1B DG in parallel to the grid per BOP AP-32.

Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for Waste Gas Decay Tank Release JPM Number: Control Room JPM g.

Revision Number: 1 Date: 7/13/2011 Revised By: Bill Hochstetter

  • 7/13/11 Instructor Date Validated By: Bill Hochstetter
  • 7/13/11 SME or Instructor Date Approved By: Rob Lawlor* 07/14/11 Training Department Date
  • Signature on File

Control Room JPM g.

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A 0A Waste Gas Decay Tank release is pending.
3. 0PR02J is operable.

INITIATING CUE You have been instructed to perform Section 5.1.2 of BCP 400-TWASTE GAS in preparation for this release.

Control Room JPM g.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.

To initiate this JPM, hand the partially completed BCP 400-TWASTE GAS to the examinee.

1. Refer to the partially completed BCP ° REVIEW BCP 400- TWASTE 400- TWASTE GAS GAS for completeness up to Section 5.1.1
2. Functional Test of 0PA202 and
  • Calls EO to verify/close All 0PB102 0GW9298 valves (A, B, C, Cue: The inplant EO reports all D, E and F) 0GW9298 valves (A, B, C, D, E and F) are CLOSED
  • Calls Rad Waste panel Cue: Radwaste operator reports CS operator to verify C/S for for 0GW014 is in the open position 0GW014 is in open position Cue: Radwaste operator reports 0GW014 is in the open position using
  • Calls Rad Waste panel the Air Controller operator to verify 0GW014 is in open position using Air Controller
  • 3. RM-11 supervisory mode At the RM-11:

Cue: RM-11 is in the supervisory

  • PLACE RM-11 in Supervisory mode of operation Mode
  • 4. Select monitor At the RM-11, Grid 3, monitor 0PR02J:

Cue: 0PA202 has been selected

  • SELECT the LOW Gas Channel 0PA202 and DEPRESS the SEL key

Control Room JPM g.

Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Enter a new high alarm setpoint At the RM-11:

channel

  • DEPRESS Channel Item key Cue: The channel item key has been pressed
  • KEY IN 9 Cue: 9 has been keyed in
  • ENTER a new High Alarm setpoint (below current value)

Cue: A new high alarm setpoint has been entered.

  • DEPRESS the Enter key Cue: The enter key has been pressed NOTE: The monitor should be reading 7.9E-06. and should be set to a lower value to test the interlock.

(i.e. 7.9E-07)

  • 6. Verifies Auto Operation
  • Calls Rad Waste panel
  • Verify 0GW014 CLOSED operator to verify 0GW014 automatically has CLOSED Cue: The Radwaste operator reports automatically 0GW014 CLOSED automatically
  • Calls Rad Waste panel Cue: Radwaste operator reports operator to verify Gas Alarm 0GW02J A-9 is LIT Decay Tank Vent Stack Eff Rad Hi Alarm comes in at 0GW02J A-9 Cue: Radwaste operator reports C/S for 0GW014 is in the closed
  • Calls Rad Waste panel position operator to place C/S for 0GW014 in the CLOSED position Cue: Radwaste operator reports controller demand for 0GW014
  • Calls Rad Waste panel is at 0. operator to reduce controller demand to 0 at 0GW02J

Control Room JPM g.

Comment ELEMENT STANDARD SAT UNSAT Number

  • 7. High alarm setpoint for 0PA202 At the RM-11:

Cue: 0PA202 has been selected

  • SELECT 0PA202 Cue: Channel item key has been
  • DEPRESS Channel Item key depressed
  • KEY IN 9 Cue: Channel item 9 has been selected
  • ENTER a new High Alarm setpoint Cue: 833-3 (or 833-03) has been entered
  • DEPRESS the Enter key Cue: Enter Key has been depressed
  • Verify new value is displayed Cue: New value is displayed
8. Initial form as NSO Initial form
9. Requests verification Examinee requests verification Cue: The US will continue at step 12.

This JPM is completed RECORD STOP TIME:

Control Room JPM g.

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A 0A Waste Gas Decay Tank release is pending.
3. 0PR02J is operable.

INITIATING CUE You have been instructed to perform Section 5.1.2 of BCP 400-TWASTE GAS in preparation for this release.

Exelon Nuclear Job Performance Measure Prepare U1 for RSP Operations JPM Number: CR JPM h.

Revision Number: 3 Date: 2/6/2013 Revised By: Bill Hochstetter 2/06/2013 Instructor Date Validated By: Greg Gugle 03/03/2013 Ops Dept. Date Approved By: Rob Lawlor /s/ 03/03/2013 Ops Department Date

CR JPM h.

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. The Unit has been manually tripped per 1BOA PRI-5.
3. 0BOA PRI-5 and 1BOA PRI-5 have been entered due to a fire.
4. 1BOA PRI-5 step 6.d. is being carried out by another NSO.

INITIATING CUE

1. The US has directed you to prepare Unit 1 for Remote Shutdown Panel operations per 1BOA PRI-5, step 6.
2. Inform the US when complete.

CR JPM h.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to 1BOA PRI-5, Control ° LOCATE and OPEN 1BOA Room Inaccessibility PRI-5 Note: Step 1 may be performed at any time (step 6)

NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee.

Provide the examinee with a copy of 1BOA PRI-5, step 6.

2. Verify letdown divert valve in At 1PM05J:

AUTO.

° Verify 1CV112A is in AUTO

  • 3. Place PZR pressure control to At 1PM05J:

channels 457/458.

  • Place PZR Press Control Selector to 457/458
  • 4. Place PZR level control to At 1PM05J:

channels 460/461.

  • Place PZR Level Control Selector to 460/461
5. Obtain logs and keys. Obtain the following:

Cue: (If asked) step 6.d is being Unit Log Book performed by another NSO Unit 1 PRI-5 keys Temporary Change Tracking Log Equipment Status Tag Log/Abnormal Component Position Sheet Book

CR JPM h.

Comment ELEMENT STANDARD SAT UNSAT Number

  • 6. Open RCS loop sample valves. At 1PM11J OPEN:
  • 1PS9356A
  • 1PS9356B
  • 7. Open PZR liquid sample valves. At 1PM11J OPEN:
  • 1PS9355A
  • 1PS9355B
  • 8. Open PZR steam sample valves. At 1PM11J OPEN:
  • 1PS9354A
  • 1PS9354B Cue: (if required) This JPM is Informs US of completion completed RECORD STOP TIME:

CR JPM h.

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. The Unit has been manually tripped per 1BOA PRI-5.
3. 0BOA PRI-5 and 1BOA PRI-5 have been entered due to a fire.
4. 1BOA PRI-5 step 6.d. is being carried out by another NSO.

INITIATING CUE

1. The US has directed you to prepare Unit 1 for Remote Shutdown Panel operations per 1BOA PRI-5, step 6.
2. Inform the US when complete.