Annual Commitment Change Report
ML13142A012
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/25/2013
From: Capps S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13142A012 (3)


Text

I Duke Energy' STE VEN D. CAPPS Vice Ptesident UcGula-e Nu~clear Station Duke Energy MGOIVP 1 12700 Hagers Feny Rd-Huntlesville, NC 28078 980-875-4805 980-875-4809 fax Steven. Capps@duke-energy. com March 25, 2013 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Subject Duke Energy Carolinas, LLC McGuire Nuclear Station, Units I and 2 Docket Nos.'50-369, 50-370 Annual Commitment Change Report Attached is a summary report of commitment changes for McGuire Nuclear Station completed during the 2012 calendar year. These changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments" and have no adverse effect on compliance with NRC rules or regulations.

Questions regarding this submittal should be directed to Kay Crane, McGuire Regulatory Affairs at (980) 875-4306.

Steven D. Capps Attachment j.

www.duke-energy.com

U. S. Nuclear Regulatory Commission March 25, 2013 Page 2 xc:

Mr. Victor McCree U. S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303 Mr. Jon Thompson U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555-0001 Mr. John Zieler NRC Senior Resident Inspector McGuire Nuclear Station

McGuire Nuclear Station Commitment Change Summary Report Docket Nos. 369 and 370 NUMBER SOURCE ORIGINAL COMMITMENT MODIFIED COMMITMENT DOCUMENT 2012-M-001 Licensee Event Upon completion of the NC pump Upon completion of the NC pump Report 370/97-02 motor stator replacements, a long-motor stator replacements, a long dated November 3, term motor maintenance and term maintenance and monitoring 1997.

monitoring program, consisting of program, consisting of off-line on-line partial discharge testing and electrical testing will be off-line electrical testing will be implemented.

implemented.