Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13101A043 + (ML13101A043)
- ML13101A044 + (ML13101A044)
- ML13101A048 + (ML13101A048)
- ML13101A061 + (ML13101A061)
- ML13101A069 + (ML13101A069)
- ML13101A072 + (ML13101A072)
- ML13101A086 + (ML13101A086)
- ML13101A087 + (ML13101A087)
- ML13101A094 + (ML13101A094)
- IR 05000266/2013503 + (ML13101A098)
- ML13101A106 + (ML13101A106)
- ML13101A117 + (ML13101A117)
- ML13101A120 + (ML13101A120)
- ML13101A123 + (ML13101A123)
- ML13101A125 + (ML13101A125)
- ML13101A126 + (ML13101A126)
- AEP-NRC-2013-21, Request to Withdraw Proposed Changes to Emergency Action Levels + (ML13101A130)
- ML13101A143 + (ML13101A143)
- ML13101A148 + (ML13101A148)
- ML13101A152 + (ML13101A152)
- ML13101A170 + (ML13101A170)
- ML13101A183 + (ML13101A183)
- ML13101A190 + (ML13101A190)
- ML13101A195 + (ML13101A195)
- IR 05000298/2012301 + (ML13101A213)
- ML13101A223 + (ML13101A223)
- LR-N13-0058, Request for Relief from ASME Code Pressure Test for Service Water Supply Buried Piping + (ML13101A266)
- 1CAN041301, Unit 1, Response to Request for Additional Information Related to 10 CFR 50.46 30-Day Report + (ML13101A267)
- 0CAN041301, Units 1 and 2: Response to an Apparent Violation in Inspection Report Nos. 05000313-13-503 and 05000368-13-503; EA-12-275 + (ML13101A268)
- PNP 2013-031, Report of Changes in Emergency Core Cooling System Models + (ML13101A269)
- ML13101A274 + (ML13101A274)
- ML13101A278 + (ML13101A278)
- ET 13-0012, Request for Review of Information to Support Resolution of Example 2 of Non-cited Violation 05000482/2011007-03, Failure to Ensure Post-Fire Safe Shutdown Components Remain Free of Fire Damage + (ML13101A301)
- 05000269/LER-2013-001, Regarding Inadequate HVAC Load Analysis and Design Impacts on Emergency Power Equipment + (ML13101A307)
- 05000390/LER-2013-001, Regarding Latent Design Input Inconsistencies Adversely Affect Probable Maximum Flood Analysis + (ML13101A309)
- 05000327/LER-2013-001, Regarding Latent Design Input Inconsistencies Adversely Affect Probable Maximum Flood Analysis + (ML13101A310)
- 05000259/LER-2013-001, Brown Ferry Nuclear Plant, Units 1, 2 and 3 Regarding Latent Design Input Inconsistencies Adversely Affect Probable Maximum Flood Analysis + (ML13101A311)
- ML13101A314 + (ML13101A314)
- ML13101A321 + (ML13101A321)
- ML13101A332 + (ML13101A332)
- ML13101A333 + (ML13101A333)
- ML13101A338 + (ML13101A338)
- 05000482/LER-2013-002, Regarding Pressure Boundary Leakage on a Seal Water Injection Drain Line Due to Low Stress High Cycle Fatigue + (ML13101A339)
- RBG-47351, Eighteenth Fuel Cycle Core Operating Limits Report (COLR) + (ML13101A340)
- ML13101A354 + (ML13101A354)
- Press Release-I-13-016, NRC to Hold Open House on April 18th in Delta, Pa., to Discuss Peach Bottom Nuclear Power Plant Annual Assessment + (ML13101A355)
- ML13101A359 + (ML13101A359)
- ML13101A369 + (ML13101A369)
- ML13101A371 + (ML13101A371)
- ML13101A374 + (ML13101A374)
- AEP-NRC-2013-13, Redacted Version of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events (Order Number EA-12-049) + (ML13101A381)