Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML082100098 + (ML082100098)
- ML082100120 + (ML082100120)
- L-HU-08-014, Planned Initial License Operator Examination Data + (ML082100126)
- ML082100159 + (ML082100159)
- ML082100160 + (ML082100160)
- ML082100169 + (ML082100169)
- ML082100170 + (ML082100170)
- ML082100301 + (ML082100301)
- L-08-002, Independent Spent Fuel Storage Installation - Transmittal of Characterization of Spent Fuel + (ML082100329)
- ML082100335 + (ML082100335)
- DCL-08-058, Transmittal of Inservice Inspection Report, Fourteenth Refueling Outage + (ML082100341)
- ML082100365 + (ML082100365)
- Press Release-08-138, NRC Staff Approves Transfer of Entergy Operating Licenses to New Corporate Structure + (ML082100366)
- Press Release-08-139, NRC Seeks Pubic Comment on Draft Generic Environmental Study of In-Situ Leach Uranium Recovery Operations + (ML082100368)
- ML082100408 + (ML082100408)
- ML082100422 + (ML082100422)
- ML082100425 + (ML082100425)
- ML082100430 + (ML082100430)
- ML082100434 + (ML082100434)
- 05000003/LER-2008-001, Attempted Introduction of Contraband Into the Plant Protected Area Due to Personnel Error + (ML082100447)
- ML082100448 + (ML082100448)
- ML082100449 + (ML082100449)
- ML082100451 + (ML082100451)
- ML082100452 + (ML082100452)
- ML082100453 + (ML082100453)
- ML082100454 + (ML082100454)
- JAFP-08-0067, Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts. + (ML082100455)
- ML082100455 + (ML082100455)
- JAFP-08-0067, Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves. + (ML082100456)
- ML082100456 + (ML082100456)
- JAFP-08-0067, Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves. + (ML082100457)
- ML082100457 + (ML082100457)
- JAFP-08-0067, BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1) + (ML082100458)
- ML082100458 + (ML082100458)
- JAFP-08-0067, Calculation No. 0800846.301, Revision 0, 2 Instrument Nozzle Stress Analysis + (ML082100460)
- ML082100466 + (ML082100466)
- ML082100479 + (ML082100479)
- IR 05000400/2008003 + (ML082100485)
- ML082100501 + (ML082100501)
- IR 05000346/2008008 + (ML082100508)
- ML082100532 + (ML082100532)
- NRC 2008-0052, Revision to Notice of Intent to Pursue Extended Power Uprates + (ML082100578)
- ASLBP 08-866-01-CO-BD01, NRC Staff Response to Sec Request for Hearing and Leave to Intervene, and Notices of Appearance for Kimberly Sexton and Brett Klukan, Nrc/Ogc + (ML082100589)
- ML082100599 + (ML082100599)
- ML082100600 + (ML082100600)
- ML082110003 + (ML082110003)
- IR 05000219/2008008 + (ML082110039)
- OI 4-2008-016, Energy Northwest (Columbia Generating Station), Closure of Investigation, 07/29/2008 + (ML082110124)
- ML082110129 + (ML082110129)
- ML082110144 + (ML082110144)
- OI 4-2007-043, & 4-2008-015 Arizona Public Service Company (Palo Verde Nuclear Generating Station), Closure of Investigation, 07/29/2008 + (ML082110163)