R. E. Ginna, Response to RIS 2008-16 Preparation and Scheduling of Operator License Examinations
ML082100453
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/18/2008
From: Geckle M
Constellation Energy Group, Nuclear Generation Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-08-016
Download: ML082100453 (2)


Text

Mark Geckle Manager, Nuclear Training Department R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 Constellation Energy Nuclear Generation Group July 18, 2008 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2008-16 Preparation and Scheduling of Operator License Examinations Attached you will find NRC Form 536 providing R.E. Ginna's expected license examination schedule information.

Should you have any questions please contact John Brown, General Supervisor, Operations Training at 585-771-5534.

Very trulye Mark Geckle

Enclosure:

Operator Licensing Examination Data Cc (w/enc): S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC hOD35 0(24ý

/6io/qJff

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required, to respond to, the information collection.

FACILITY NRC REGION R.E. Ginna Nuclear Power Plant A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 0

5 0

4 OPERATORS NUMBER OF SENIOR REACTOR 0

9 0

4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

4 0

4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/24/2010 03/01/2012 ALTERNATE DATE 06/22/2010 04/01/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I*