Q2As Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION
Title:
Entergy Nuclear Vermont Yankee Docket Number: 50-271-LR; ASLBP No. 06-849-03-LR DOCKETED USNRC Location: Newfane, Vermont July 25, 2008 (1:50pm)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF Date: Wednesday, July 23, 2008 Work Order No.: NRC-2296 Pages 1177-1450 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 (202) 234-4433 O~A T -c203
1177 1 UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION 3
4 ATOMIC SAFETY AND LICENSING BOARD 5 HEARING 6
7 In the Matter of:
8 ENTERGY NUCLEAR VERMONT 9 YANKEE, LLC Docket No. 50-271-LR 10 and ASLB No. 06-849-03-LR 11 ENTERGY NUCLEAR OPERATIONS, 12 INC. (Vermont Yankee Nuclear 13 Power Station) 14 15 Wednesday, July 23, 2008 16 17 Windham County Superior Court 18 7 Court Street 19 Newfane, Vermont 20 21 BEFORE:
22 ALEX S. KARLIN, Chair, Administrative Judge 23 RICHARD E. WARDWELL, Administrative Judge 24 WILLIAM REED, Administrative Judge 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1178 1 APPEARANCES:
2 On Behalf of Entergy Nuclear Vermont Yankee, LLC 3 and Entergy Nuclear Operations, Inc.:
4 DAVID R. LEWIS, ESQ.
5 MATIAS F. TRAVIESO-DIAZ, ESQ.
6 ELINA TEPLINSKY, ESQ.
7 of: Pillsbury Winthrop Shaw Pittman LLP 8 2300 N Street, N.W.
9 Washington, D.C. 20037-1128 10 11 On Behalf of the Nuclear Regulatory. Commission:
12 LLOYD B. SUBIN, ESQ.
13 DAVID E. ROTH, ESQ.
14 MARY C. BATY, ESQ.
15 JESSICA A. BIELECKI, ESQ.
16 Office of the General Counsel 17 Mail Stop - 0-15 D21
.18 U.S. Nuclear Regulatory Commission 19 Washington, D.C. 20555-0001 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1179 1 On Behalf of the New England Coalition:
2 KAREN L: TYLER, ESQ.
3 ANDREW LAUBVOGEL, ESQ.
4 of: Shems Dunkiel Kassel & Saunders PLLC 5 91 College Street 6 Burlington, Vermont 05401 7
8 On Behalf of the State of Vermont:
9 SARAH HOFMANN, ESQ.
10 Director for Public Advocacy 11 Department of Public Service 12 112 State Street - Drawer 20 13 Montpelier, Vermont 05620-2601 14 15 ANTHONY Z. ROISMAN, ESQ.
16 National Legal Scholars Law Firm 17 84 East Thetford Road 18 Lyme, New Hampshire 03768 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgro ss.com
11.80 1 On Behalf of the State of New. Hampshire:
2 PETER C.L. ROTH, ESQ.
3 Senior Assistant Attorney General 4 State of New Hampshire 5 Office o~f the New Hampshire 6 Attorney General 7 33 Capitol Street 8 Concord, New Hampshire 03301 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-44433 WASHINGTON, D.C. 20005-3701 www.nea Irgross.com
1181 1 TABLE OF CONTENTS 2 Exhibit No. Mark Recd 3 Entergy 4 E4-01, 02, 43 1424 1425 5 NRC Staff 6 Rowley/Hsu Affidavits 1429 1429 7 17-21/A-C 1430 1431 8 NEC 9 JH36-JH53 Hopenfeld Testimony 1431 1432 10 JH70-JH72 Hopenfeld Testimony 1431 1432 11 Hauser Testimony 1433 1434 12 RH02-RH05 1434 1434 13 Witte Testimony 1435 1435 14 W02-W22 1436 1436 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1182 1PR 0 C E E D I N G S 2 8:31 A.M.
3 JUDGE KARLIN: Good morning. I'm Alex 4 Karlin. This Board, Atomic Safety and Licensing 5 Board, is now reconvening here on July 23rd in the 6 matter of Entergy's application for a license renewal 7 for its Vermont Yankee facility.
8 Toddy, we're going to turn to contention 9 3 in this matter, NEC and the State of Vermont have a 10 contention which I will read here just for setting the 11 stage. As I have it, "Entergy's license renewal 12 application does not include an adequate plan to 13 monitor and manage aging of the steam dryer during the 14 period of extended operation." So that's the bare 15 bones of the words of the contention as it's been 16 admitted.
17 What I will do this morning is have the 18 witnesses for this contention brought into the witness 19 box and sworn in and then ask the attorneys for the 20 parties to introduce the exhibits that are relevant 21 and that they're presenting relevant to this 22 contention so that's what I was planning to do.
23 Do either of my colleagues have anything 24 they'd like to say on the outset this morning?
25 Anything from the counsel for the parties, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1183 1 procedurally or otherwise we need to talk about this 2 morning?
3 So we're ready to go with contention 3.
4 Great.
5 With that, perhaps I -- are all the 6 witnesses seated? Dr. Hopenfeld, you'll probably need 7 him over there as well.
8 And Ms. Carpentier will put up the name 9 tags. This is helpful to us.
10 (Pause.)
11 Great, thank you. Could I ask you all to 12 please rise and raise your right hand.
13 (The witnesses were sworn.)
14 Thank you. Please be seated.
15 Welcome. We are hopeful that this 16 contention 3 might not take as long as contention 2 17 and if the thickness of the submissions by the parties 18 is any indication, we may have some reason for hoping 19 it will be shorter than contention 2. So welcome.
20 I guess I would now ask counsel for 21 Entergy to have your witnesses introduce whatever 22 exhibits you so have appropriately.
23 MR. LEWIS: Judge Karlin, Mr. Diaz will 24 introduce the first one.
25 JUDGE KARLIN: Mr. Diaz, go ahead.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1184 1 MR. TRAVIESCO-DIAZ: Thank you, Mr.
2 Chairman.
3 Mr. Hopenfeld, will you please state your 4 full name for the record?
5 MR. HOFFMAN: John R. Hoffman.
6 JUDGE KARLIN: Everyone needs to speak 'up 7 as much as they can, please.
8 (Off the record.)
9 JUDGE KARLIN: Mr. Diaz, please continue.
10 MR. TRAVIESCO-DIAZ: Mr. Lukens, will you 11 please state your full name for the record?
12 MR. LUKENS: Larry D. Lukens.
13 MR. TRAVIESCO-DIAZ: Mr. Hoffman and Mr.
14 Lukens --
15 JUDGE KARLIN: Please also speak up so the 16 people can hear you.
17 MR. TRAVIESCO-DIAZ: Mr. Hoffman and Mr.
18 Lukens, do you have in front of you a document bearing 19 the caption of this proceeding. entitled "Joint 20 Declaration of John R. Hoffman and Larry D. Lukens in 21 NRC Contention 3"?
22 MR. LUKENS: Yes, I do.
23 MR. HOFFMAN: Yes.
24 MR. TRAVIESCO-DIAZ: Did you prepare this 25 document for use in this proceeding?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1185 1 MR. LUKENS: Yes.
2 MR. HOFFMAN: Yes.
3 MR. TRAVIESCO-DIAZ: Do you have any 4 corrections to make to this testimony?
5 MR. LUKENS: Yes, I have.
6 MR. TRAVIESCO-DIAZ: Will you please state 7 what those corrections are?
8 MR. LUKENS: In the testimony, answer 46, 9 line 7 which is the last line of the table, change the 10 number 47**(71.2 percent) to 48**(72.7).
11 MR. TRAVIESCO-DIAZ: And that's on page 12 25?
13 Please proceed.
14 MR. LUKENS: On page 25, answer 46, line 15 12 which is the first footnote, the first line of 16 footnote **, change 47 previous indications were re-17 identified: 19 to 48 previous indications were 18 previously identified; 27.
19 On page 25, line 14 which is the third 20 line of that footnote, delete the word either between 21 2007 and the word do and page 25, line 15 which is the 22 fourth line of that footnote, change the phrase 23 conditions or because the previous indication was to 24 conditions and nine previous indications were.
25 MR. TRAVIESCO-DIAZ: With those NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1186 1 corrections, is this testimony true and correct to the 2 best of your knowledge?
3 MR. LUKENS: Yes.
4 MR. HOFFMAN: Yes.
5 MR. TRAVIESCO-DIAZ: Do you adopt it. as 6 your direct testimony in this proceeding?
7 MR. LUKENS: Yes.
8 MR. HOFFMAN: Yes.
9 MR. TRAVIESCO-DIAZ: Mr. Chairman, I move 10 that the declaration of John R. Hoffman and Larry D.
11 Lukens be admitted into evidence and bound to the 12 record at this point.
13 JUDGE KARLIN: Any objections? Hearing 14 none, it shall be admitted. Thank you.
15 MR. TRAVIESCO-DIAZ: Mr. Chairman, we also 16 have marked a set of exhibits to this testimony which 17 are numbered Exhibits A302 through A316. One of those 18 exhibits A315 has corrections and those corrected 19 exhibits have been handed over to the parties and to 20 the Board. And I would move that all these exhibits 21 be admitted into evidence at this point.
22 JUDGE KARLIN: Any objections from the 23 parties?
24 Hearing none, they're admitted.
25 Thank you, Mr. Diaz.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1187 i NRC staff, Ms. Baty?
2 MS. BATY: Actually, Ms. Bielecki is going 3 to 4 JUDGE KARLIN: Okay, Ms. Bielecki.
5 MS. BIELECKI: Mr,. Scarbrough, could you 6 please state your full name for the record?
7 MR. SCARBROUGH: Tom G. Scarbrough.
8 MS. BIELECKI: Mr. Hsu, will you please 9 state your name?
10 MR. HSU: Kaihwa Robert Hsu.
11 MS. BIELECKI: And Mr. Rowley?
12 MR. ROWLEY: Jonathan Gabriel Rowley.
13 MS. BIELECKI: Do you have before you the 14 affidavit of Kaihwa Robert Hsu, Jonathan G. Rowley, 15 and Thomas G. Scarbrough concerning NEC's contention 16 3, steam dryer?
17 MR. HSU: I do.
18 MR. ROWLEY: I do.
19 MR. SCARBROUGH: I do.
20 MS. BIELECKI: And did you prepare this 21 testimony for this proceeding?
22 MR. HSU: Yes.
23 MR. ROWLEY: Yes.
24 MR. SCARBROUGH: Yes.
25 MS. BIELECKI: Do any of you have any NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1188 1 corrections to this testimony?
2 MR. HSU: No.
3 MR. ROWLEY: No.
4 MR. SCARBROUGH: No.
5 MS. BIELECKI: Have you prepared a 6 statement of professional qualifications?
7 MR. HSU: Yes.
8 MR. ROWLEY: Yes.
9 MR. SCARBROUGH: Yes.
10 MS. BIELECKI: Is it attached thereto?
11 MR. HSU: Yes.
12 MR. SCARBROUGH: Yes.
13 MR. ROWLEY: Yes.
14 MS. BIELECKI: Do you adopt this testimony 15 as your initial testimony in this proceeding?
16 MR. HSU: Yes.
17 MR. SCARBROUGH: Yes.
18 MR. ROWLEY: I do.
19 MS. BIELECKI: I move this testimony into 20 evidence, Your Honor.
21 JUDGE KARLIN: All right, any objections?
22 Hearing none, it's admitted. Thank you.
23 MS. BIELECKI: We also have Staff Exhibits 24 14, 15, and 19. I would like to move these into 25 evidence as well. There are no corrections.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1189 I JUDGE KARLIN: Any objections? No 2 objections, admitted. Thank you, Ms. Bielecki.
3 NEC, please.
4 MS. TYLER: Dr. Hopenfeld's testimony 5 regarding contention 3 has already been admitted. I 6 now move to admit NEC's pre-filed exhibits, NEC JH-54 7 through NEC JH-61 and NEC JH-68 through JH-69.
8 JUDGE KARLIN: There are no changes on any 9 of those?
10 MS. TYLER: No.
11 JUDGE KARLIN: Any objections to that?
12 No. Hearing none, they're admitted as well.
13 With that, I think we have the 14 preliminaries undertaken and we can turn to the 15 contention.
16 I thought -- I had a couple of questions 17 that maybe we can start with because I'm a little 18 confused about what the aging management plan that 19 Entergy has proposed and the staff has evaluated, what 20 it is, what we're talking about.
21 If I could ask the staff to turn to --
22 well, it's prefiled written testimony that was 23 formerly Exhibit 4 by the staff, question 4. Could 24 you refer to that, please?
25 MS. TYLER: Judge Karlin, may I provide NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1190 1 Dr. Hopenfeld the materials? He just indicated that 2 he doesn't have a copy.
3 JUDGE KARLIN: Yes, sure. I mean we've 4 been doing this every day. So he should have that 5 material.
6 MS. TYLER: I agree.
7 JUDGE KARLIN: We shouldn't have to do 8 this every time I ask a question.
9 I guess question is for Mr. Rowley, is 10 that the correct way to pronounce it?
11 MR. ROWLEY: Rowley.
12 JUDGE KARLIN: Rowley, Mr. Rowley, because 13 in question 4 on page 3 of your pre-filed testimony 14 the question is asked: describe Entergy's program to 15 monitor and manage the effects of aging on Vermont 16 Yankee steam dryer during the period of extended 17 operations.
18 And you refer -- and what's the answer to 19 that? What is the plan that the steam dryer aging 20 management plan that you currently have approved that 21 will apply for the period of extended operation?
22 MR. ROWLEY: What is it?
23 JUDGE KARLIN: Yes. There is one entity 24 called a steam dryer monitoring plan that was used 25 under the uprate and there's another entity that's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1191 1 referred to as the BWR VIP-139 program. Which one is 2 it?
3 MR. ROWLEY: Well, there's a commitment, 4 37 to once the staff approves the VIP-139 that the 5 Applicant will then use that program and if it's not 6 approved, they will continue to use their steam dryer 7 monitor plan. It incorporates the GE SIL 644.
8 JUDGE KARLIN: Okay, so commitment 37. It 9 says if BWR VIP-139 -- well, it doesn't really say 10 that. Let's go to* commitment 37. Pull that out, 11 FSER, appendix A. Let's see what it says.
12 (Pause.)
13 Are you able to see? Let. me ask a quick 14 question Dr Wardwell has raised. The lights are 15 dimmed to try to keep it cooler in the room. Can you 16 all read the materials all right?
17 MR. ROWLEY: I can.
18 JUDGE KARLIN: So page A-13 of the FSER 19 which is Staff Exhibit 1. Continuing inspections in 20 accordance with the steam dryer monitoring plan, 21 revision 3 in the event that BWR-139 is not approved 22 prior to the period of extended operation.
23 So is the steam dryer monitoring plan 24 revision 3 the aging management plan upon which the 25 staff has approved or recommends approving this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1192 1 application?
.2 MR. ROWLEY: It is contingent upon staff's 3 approval of VIP-139.
4 JUDGE KARLIN: What if the staff doesn't 5 approve it?
6 MR. ROWLEY: We do think that the steam 7 dryer monitoring plan --
8 JUDGE KARLIN: Could you speak up? I 9 didn't hear you.
10 MR. ROWLEY: We do think the steam dryer 11 monitoring plan will adequately manage the aging of 12 the steam dryer.
13 JUDGE KARLIN: Okay, so there's sort of a 14 fork in the road coming about whether or not the staff 15 approves the BWR VIP-139.
16 MR. ROWLEY: Correct.
17 JUDGE KARLIN: And if it does approve that 18 BWR VIP-139, then what happens?
19 MR. ROWLEY: Then the Applicant will use 20 that as its aging management program.
21 JUDGE KARLIN: Okay, and if staff doesn't 22 approve it, then what happens?
23 MR. ROWLEY: They will still continue the 24 steam dryer monitoring plan that they currently --
25 JUDGE KARLIN: Okay, so the current one NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
11.93 I that applies is the steam dryer monitoring plan 2 revision 3?
3 MR. ROWLEY: Yes.
4 JUDGE KARLIN: And that is going to apply 5 for the next 20 plus years unless some event happens 6 in the future?
7 MR. ROWLEY: Correct.
8 JUDGE KARLIN: So let's focus on that and 9 the testimony, well, let me ask on the steam dryer 10 monitoring plan. Let's go to page four and five of 11 the testimony, pre-filed, and there apparently are 12 some conditions you refer to on page five? License 13 condition five specifies that there are in each of the 14 three scheduled refueling outages, a visual inspection 15 shall be conducted?
16 MR. ROWLEY: I think Mr. Scarbrough can 17 answer that.
18 JUDGE KARLIN: Well, no. Why are one of 19 you talking about one and the other --
20 MR. SCARBROUGH: The reason that I was 21 involved with the power uprate review and that's where 22 the licensed conditions were placed in the license 23 amendment for the power uprate, and this was part of 24 the condition for the steam dryer monitoring plan and 25 the license renewal was a different renewal.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1194
- 1. JUDGE KARLIN: Well, you did the uprate.
2 and this is the license renewal. So we're talking 3 about the license renewal?
.4 MR. SCARBROUGH: Yes, what was done in the 5 power uprate we carried forward. That. was already 6 reviewed. We do the review for that since this is so 7 recent, we just carry it forward, and it will carry 8 forward in the licensing renewal.
9 JUDGE KARLIN: Okay. So Mr. Scarbrough, 10 you did the EPU, steam dryer monitoring plan?
11 MR. SCARBROUGH: That was part of our 12 review.
13 JUDGE KARLIN: Part of your review.
14 Perhaps you can help us with the testimony. What is 15 the steam dryer monitoring plan revision 3 that was 16 approved under the uprate call for?
.17 Let me go to page four of your testimony 18 or the testimony and see if it was yours -- yes, that 19 was your testimony.
20 And I quote, "in its SDMP Entergy stated 21 that the Vermont Yankee steam dryer would be inspected 22 during refueling outages scheduled for the fall of 23 2005, spring of 2007, fall of 2008, and spring of 24 2010, in accordance of recommendations of GE SIL 644, 25 right?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1195 1 MR. SCARBROUGH: Yes.
2 JUDGE KARLIN: How many inspections is 3 that?
4 MR. SCARBROUGH: Three. They can do three 5 as part of the requirement of the license conditions 6 of the power uprate. After the first three outages 7 afterward, they would do those inspections.
8 JUDGE KARLIN: Well, actually that's four.
9 Fall of 2005, spring 2007, fall 2008, spring 2010.
10 That's four.
11 MR. SCARBROUGH: Fall '05 was before it 12 was issued.
13 JUDGE KARLIN: So there's three scheduled 14 and so on page five when you refer to -- for example, 15 license condition 5 specifies that during each of the 16 three scheduled refueling outages beginning, blah, 17 blah, blah, a visual inspection shall be conducted."
18 Right? Those are the three scheduled 19 outages you're talking about?
20 MR. SCARBROUGH: Yes.
21 JUDGE KARLIN: Condition 5 is a condition, 22 imposed condition of this license or or the EPU?
23 MR. SCARBROUGH: It's the power uprate.
24 JUDGE KARLIN: Okay. And license 25 condition 6 specifies the results of the visual NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1196 1 inspection during the three scheduled refueling 2 outages shall be reported. Again, that's under the 3 EPU and the three scheduled outages and in 2010, 4 right?
5 License condition 7, later on that page, 6 it says, "license condition 7 specifies that the 7 requirements for meeting the SDMP shall be implemented 8 upon issuance of the EPU and shall continue until the 9 completion of one full operating cycle at EPU 10 conditions."
11 Does that mean that the obligation to do 12 the inspection terminates after the completion of one 13 full operating cycle?
14 MR. SCARBROUGH: After they-complete that 15 third outage, that third inspection in 2010, what we 16 are trying to do is come up with a sunset provision in 17 the license condition so that eventually these 18 conditions would merge into a longer term program.
19 JUDGE KARLIN: Okay.
20 MR. SCARBROUGH: Part of what they also 21 are part of this license condition provision is the 22 commitment or the license condition that they 23 implement the GE SIL service information letter, 644, 24 rev. 1.
25 JUDGE KARLIN: Yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1197 1 MR. SCARBROUGH: And that has a long-term 2 program beyond the power uprate, so this -- once they 3 performed the inspections of the three after power 4 uprate and assuming and those conditions in that they 5 do not see any significant issues --
6 JUDGE KARLIN: Right.
7 MR. SCARBROUGH: Then this would sunset 8 out and then they would be into long-term GE 9 recommendation for whatever they decide in terms of 10 the GE recommendations. And this is 644 and currently 11 in 644 --
12 JUDGE KARLIN: Now let me stop you there.
13 So these are the visual inspections, right?
14 MR. SCARBROUGH: Yes.
15 JUDGE KARLIN: And the GE 644 is the 16 monitoring of plant parameters?
17 MR. SCARBROUGH: Actually, they're both.
18 JUDGE KARLIN: Okay, but let me just focus 19 on this. I'm just concerned. License condition 7 of 20 the uprate says that the duty of Entergy to do these 21 visual inspections, as I read this, terminates after 22 the completion of one full operating cycle if 23 everything is fine for that one cycle. At 2010, 24 they're done. They don't have to do any more visual 25 inspections under the EPU.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1198 1 MR. SCARBROUGH: No, they do, because 2 there's a license condition here for SIL 644.
3 JUDGE KARLIN: Okay.
4 MR. SCARBROUGH: And SIL 644 is a long-5 term GE recommendation and SIL 644 says they inspect 6 eery other outage --
7 JUDGE KARLIN; Where does it say that in 8 this -- where does it say that, that they will do that 9 during the period of extended operations?
10 MR. SCARBROUGH: It's in Exhibit -- the GE 11 SIL 644 with exhibit -- I don't know the number.
12 JUDGE KARLIN: Well, I have GE 644, but 13 what I want is the permit condition that says they're 14 going to be obliged to do that during the next 20 plus 15 years.
16 MR. SCARBROUGH: That is the commitment to 17 continue --
18 JUDGE KARLIN: Well, let's go to the 19 commitment. It doesn't say that. Let me see. Let's 20 go back to what the commitment says.
21 MR. SCARBROUGH: They're going to continue 22 to do the steam dryer monitoring plan.
23 JUDGE KARLIN: Right, and the steam dryer 24 monitoring plan, if they do -- they can do that. If 25 I was Entergy I would say I'll do three of them and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1199 1 I've just complied with the steam dryer monitoring 2 plan.
3 MR. SCARBROUGH: The steam dryer 4 monitoring plan incorporates 644. it doesn't say here 5 in the commitment, but we know what the steam dryer 6 monitoring plan uses GE SIL 644.
7 JUDGE KARLIN: Well, commitment 37 doesn't 8 say anything about SIL 644, does it, Mr. Rowley?
9 MR. ROWLEY: No, it does not.
10 JUDGE KARLIN: Let's go -- there's another 11 provision that might. Let's go to FSER Section 1.7 on 12 page 112.
13 That's a summary of proposed license 14 conditions, right? And it says the third license 15 condition, "the third license condition requires the 16 implementation of the most recent staff approved 17 version of the boiling water reactor vessels and 18 internal project integrated surveillance program as 19 the method to demonstrate compliance of the 20 requirements of" blah, blah, blah, 10 CFR Part 50.
21 It doesn't say anything about SIL 644.
22 What I'm trying to find is the mention in the FSER, 23 the mention in exhibits here today that say Entergy 24 will do the -- continue to do visual monitoring after 25 the 2010.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1200 1 MR. ROWLEY: I'm trying to find it in the 2 aging management program that you -- we put it in 3 there. It's not specific in the commitment.
4 JUDGE KARLIN: Let's go to the aging 5 management plan review. 3.174 of the FSER is the 6 section I found. Maybe there are other sections.
7 Maybe it's in there. It's pretty short.
8 It shouldn't take as long. Where does --
9 MR. ROWLEY: What page are you on, sir?
10 JUDGE KARLIN: Page 3.174 of the FSER.
11 (Pause.)
12 MR. ROWLEY: That's one location where we 13 talk about the FE-139.
14 JUDGE KARLIN: It says Section 3.1.2.1.6 15 of the FSER, cracking due to flow-induced vibration 16 and it discussed in the discussion column blah, blah, 17 blah, the Applicant stated that BWR vessel internal 18 program will manage cracking in the stainless steel 19 steam dryers."
20 I see that's a will. Obviously, the BWR 21 VIP program 139 isn't even in existence yet. So that 22 couldn't be working.
23 MR. ROWLEY: The draft is up for approval.
24 JUDGE KARLIN: Okay, well, let's talk 25 about the draft. What is the BWR VIP? What is that?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1201 1 Who is most familiar with the BWR VIP?
2 Mr. Scarbrough, thank you.
3 MR. SCARBROUGH:. It's a group, the BWR 4 owners group. It's a project that the BWR owners 5 group has in place to look at all internal aspects of 6 the reactor vessel. They do.reviews of loose parts 7 evaluations and they prepare guidance documents for 8 the boiling water reactors.
9 And the staff has interactions with them 10 on a regular basis for what their projects are. And 11 one of the areas that they're developing is that the 12 BWR VIP 139 and that's one of their projects, where 13 they're looking at the whole history of steam dryer 14 issues in terms of the experience they've had with 15 them, what are some of the areas of recommendations in 16 terms of evaluating the stresses and the loads in the 17 dryer, talking about the --
18 JUDGE KARLIN: Okay, the operative words 19 it's an industry group?
20 MR. SCARBROUGH: Yes.
21 JUDGE KARLIN: Does it involve the public?
22 The members of the public like Dr. Hopenfeld?
23 MR. SCARBROUGH: We do have meetings with 24 them, they are public. We do have public meetings 25 with them.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1202 1 JUDGE KARLIN: Is there a copy of the BWR 2 VIP-139 as an exhibit in the record here?
3 MR. SCARBROUGH: I do not believe it is.
4 JUDGE KARLIN: There's a lot of references 5 to that in the testimony and in the FSER. I kept 6 looking for it, saying oh, this must be an important 7 document. We better look at it and see how good it 8 is. Is it in here?
9 MR. SCARBROUGH: No, I mean --
10 JUDGE KARLIN: You are the staff who 11 reviewed thi.s. Any of the parties, is there an 12 exhibit that's -- yes, Mr. Lukens?
13 MR. LUKENS: Your Honor, VIP-139 was 14 submitted in discovery. However, it was not submitted 15 by Entergy as an exhibit. I do have a copy of it.
16 JUDGE KARLIN: All right. Well, I'm not 17 surprised you would have a copy of it, but this is 18 good, but it's not an exhibit. It's not in the record 19 here. So I guess we can't look at it or understand 20 what it says.
21 MR. ROWLEY: Your Honor, if I could, could 22 I have you turn to page 3.26 of the SER, Section 23 3.0.3.2.7.
24 JUDGE KARLIN: What page, 3-56?
25 MR. ROWLEY: 3-56. This is where you see NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1203 1 -- if you go to the last paragraph on that page, talk 2 about commitment 37 and that they're going t~o do the 3 steam dryer monitoring plan revision 3 and set these 4 inspections , incorporating the guidelines of the SIL 5 so that tells there. It wasn't in the commitment in 6 the Appendix A that the SIL was going to be a part of 7 the monitoring plan, but here in the evaluation for 8 the vessel in terms of the program. We state that.
9 JUDGE KARLIN: In a letter dated, 3.56 10 says "in a letter dated August 22, 2006. the Applicant 11 committed commitment 37 to continue inspections in 12 accordance with the VYNPS steam dryer monitoring plan 13 revision 3." Is that what you're referring to?
14 MR. ROWLEY: Yes.
15 JUDGE KARLIN: These inspections 16 incorporate the guidelines of GE SIL 644 rev. 1 in 17 accordance with existing procedures.
18 okay, so continue inspections in 19 accordance with the steam dryer monitoring plan rev.
20 3. Didn't we just read that the steam dryer 21 monitoring plan rev. 3 says inspections can end as 22 soon as you get a full cycle?
23 MR. ROWLEY: That was for EPU purposes but 24 the commitment is to continue that for license 25 renewal.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1204 1 JUDGE KARLIN: It says continue it in 2 accordance with the steam dryer monitoring plan. And 3 if I'm Entergy I can say I just completed the steam 4 dryer monitoring plan. I've complied. I'm done.
5 MR. ROWLEY: The plan is the same, almost 6 the same as the program that's there for them to use.
7 But it doesn't have to stop. It's a continue --
8 JUDGE KARLIN: It doesn't have to stop, 9 but it says it can stop. If Entergy -- it seems to me 10 they could fully comply with the steam dryer 11 monitoring plan and this commitment by saying we have 12 gone through one full cycle. The steam dryer 13 monitoring plan says we can stop. We're stopping. We 14 just complied with the provision that said all we need 15 to is comply with the steam dryer monitoring plan.
16 MR. ROWLEY: The license conditions for 17 EPU says that they can stop in 2010 for the plan, but 18 the plan will continue on in license renewal. The 19 plan is nothing that stops -- the condition says they 20 can stop using the plan.
21 JUDGE KARLIN: They continue in accordance 22 with the steam dryer monitoring plan and steam dryer 23 monitoring plan says they must continue until they go 24 through a full cycle of when they're clean and then 25 they can stop.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1205 1 MR. ROWLEY: The license condition says 2 they use the plan through 2010. But the plan doesn't 3 stop --
4 JUDGE KARLIN: Well, I think it's a legal 5 matter and I'm troubled by the fact that this is -- I 6 can read that and I do read that as calling for --
7 allowing Entergy to call visual inspections. I think 8 maybe some additional clarity at the minimum is needed 9 on that because it would allow them to stop 10 monitoring, stop visual inspections in accordance with 11 the steam dryer monitoring plan as soon as they have 12 a full clean cycle. And any good lawyer could say 13 that's the way it's interpreted. I understand that 14 may not be what you intended.
15 Let me focus on page 11 -- I'm sorry, 10 16 on the questions for the Entergy witnesses. E3-01, 17 Exhibit - -this was previously an exhibit, your 18 testimony. A question, number 21 on what was page 10.
19 Question: Please describe the Aging 20 Management Program for the steam dryer included the 21 Vermont Yankee license renewal application.
22 And you quote the Applicant saying 23 .cracking due to flow-induced vibration in stainless 24 steel steam dryers is managed by the BWR vessel 25 internal program. BWR vessels internal program NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1206 1 currently incorporates' .. now is that the steam dryer 2 monitoring plan?
3 What is the plan? I'll ask Mr. Lukens, I 4 guess. What is the currently committed to license in 5 the license renewal application of what you're going 6 to do to manage the aging of the steam dryer?
7 MR. LUKENS: Our current commitment in the 8 license renewal process is to continue the inspections 9 and monitoring specified in GE SIL 644. And GE SIL 10 644 does not run out at some point after power uprate.
11 The ongoing reinspection criteria in GE SIL 644 for 12 uprated plants is a full inspection of all susceptible 13 accessible areas at least once every two refueling 14 outages.
15 JUDGE KARLIN: Okay, can you show me that?
16 MR. LUKENS: Yes, sir.
17 (Pause.)
18 Exhibit E3-09.
19 JUDGE KARLIN: Please identify what that 20 is.
21 MR. LUKENS: It is GE SIL No. 644 22 rev. 2 entitled BWR steam dryer integrity.
23 JUDGE KARLIN: All right.
24 MR. LUKENS: And appendix D --
25 JUDGE KARLIN: D as in dog?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1207 1 MR. LUKENS: Yes, sir. Which is on page 2 30 of the document.
3 JUDGE KARLIN: I'm with you.
4 MR. LUKENS: Is entitled monitoring 5 guidelines.
6 JUDGE KARLIN: All right.
7 Now let me ask you on this monitoring 8 guidelines, is this monitoring of the plant 9 parameters?
10 MR. LUKENS: Yes, sir. It is.
11 JUDGE KARLIN: Is it visual inspection?
12 As I understand it, your plan consisted of two major 13 components? One, monitoring of plant parameters on a 14 continuous basis and the other is visual inspections 15 at each refueling outage.
16 MR. LUKENS: That is correct.
17 JUDGE KARLIN: Is Appendix D only the 18 monitoring on a continuous basis?
19 MR. LUKENS: Yes, that's my understanding.
20 JUDGE KARLIN: Okay, Appendix D doesn't 21 include the visual inspections?
22 MR. LUKENS: That's correct. It is in 23 Appendix C, Charlie, which is on page 15.
24 JUDGE KARLIN: Okay, page 15, Appendix C, 25 inspections.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1208 1 MR. LUKENS: I've seen this within the 2 last 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
3 JUDGE KARLIN: All right. I see it calls 4 for a number of criteria with regard to inspections 5 and some recommendations. Is there -- maybe there is 6 an integral there that says every outage or every 7 second outage --
8 MR. LUKENS: I apologize for the 9 confusion, Your Honor. If I could direct your 10 attention to pages 6 and 7 of the SIL.
11 JUDGE KARLIN: All right.
12 (Pause.)
13 JUDGE KARLIN: I didn't find it, but it 14 might be in there.
15 MR. LUKENS: Page six, the second column 16 is entitled recommended actions. Letter A is for all 17 plants.
18 JUDGE KARLIN: Repeat the visual 19 inspection of all susceptible locations at least once 20 every two refueling outages. Is that -- that's 21 unquote, right?
22 MR. LUKENS: That's correct.
23 JUDGE KARLIN: Okay, so that's Entergy's 24 commitment.
25 MR. LUKENS: It goes beyond that, sir. On NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1209 1 page seven, Section B as in bravo, says "in addition 2 for plants planning on increasing operating power 3 level above original' license thermal power" and that 4 would be Vermont Yankee, "the recommendations 5 presented in A above should be modified-.as follows" 6 and this is where it describes the baseline 7 inspection.
8 JUDGE KARLIN: Yes*.
9 MR. LUKENS: And repeating visual 10 inspection during each subsequent refueling outage the 11 wording is not identical to our commitment for three 12 consecutive outages, but it does say until at least 13 two full operating cycles at the final uprated power 14 level have been achieved and that turns out to be 15 three consecutive refueli.ng outages.
16 JUDGE KARLIN: Well, okay. So all right.
17 I have some' questions about that, but I guess let me 18 see if I understand you. You're saying that Entergy 19 has committed to monitor in accordance with the - -do 20 the visual inspections in accordance with this 21 appendix C of SIL 644 on this frequency.
22 MR. LUKENS: That is correct.
23 JUDGE KARLIN: Okay. And this frequency 24 would consist of -- is not consistent -- is it 25 consistent with what was said in the refueling outage?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1210 1 MR. LUKENS: I haven't heard anything 2 inconsistent, Your Honor.
3 JUDGE KARLIN: Okay.
4 MR. LUKENS: The commitment is --
5 JUDGE KARLIN: Where is that commitment?
6 Where is the commitment in the FSER, it he license 7 condition, in the commitment 37 that says that this 8 will be followed? Can I find it? And maybe the staff 9 can help me.
10 MR. ROWLEY: Commitment 37, it doesn't say 11 anything more specific than that. They will continue 12 to use the SIL 644, the directive on page 3-56 of the 13 SER. That's --
14 JUDGE KARLIN: Well, having said something 15 in the SER doesn't make it legally binding, does it?
16 It's not a commitment.
17 MR. ROWLEY: Well, a commitment --
18 JUDGE KARLIN: It's not a license 19 condition.
20 MR. ROWLEY: There's a license condition 21 in Section 1.7 that says that the commitments are 22 going to be put into the FSER and FSER updated for 23 that renewal period.
24 JUDGE KARLIN: Well, isn't the license 25 condition of 1.7 of the FSER talking about the BWER NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrQross.com
1211 I VIP 139?
2 MR. ROWLEY: Right --
3 JUDGE KARLIN: That's not what this is.
4 MR. ROWLEY: No. The other commitment, I 5 think the first and second one on that page talks 6 about them having to update the UFSAR.
7 JUDGE KARLIN: Yes.
8 MR. ROWLEY: That's where these 9 commitments will be -- have to put into the UFSAR.
10 JUDGE KARLIN: Wait a second. So let's go 11 to that. "The first license condition requires the 12 applicant to include UFSAR supplement required by 10 13 CFR 54.21D and the next UFSAR update as required by 14 Sections such and such."
15 Is that what you mean?
16 MR. ROWLEY: Right. These commitments --
17 JUDGE KARLIN: No, no. That's what we're 18 supposed to find that there's a commitment that they 19 will do visual monitoring on this basis?
20 MR. ROWLEY: No, the commitment is there 21 in Appendix A which lists all 51 commitments of --
22 JUDGE KARLIN: But Appendix A doesn't 23 refer to SIL 644. Does it?
24 MR. ROWLEY: Well, it's tied in commitment 25 37, says they're going to continue to do monitoring NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1212 1 plan, and we know that the monitoring plan 2 incorporates GE SIL 644.
3 JUDGE KARLIN: Who knows? Who knows?
4 Does NEC know? Does the Board know?
5 MR. ROWLEY: You have to look at the 6 Commitment 37 as written and go to the aging 7 management program, Section 3 page 3-56 to get the 8 complete story. My oversight, when we put that 9 commitment together to include those words that said 10 they would continue, but it is there in SER.
11 JUDGE KARLIN: The fact that there is 12 something state in the SER does not make it legally 13 binding. It is not a legal commitment. It's not a 14 commitment. It's not a licensed condition. It's a 15 statement. In fact, Judge Ferrar, just recently had 16 a case where the staff specifically took the position 17 because it's in the FSER does not make it binding at 18 all. So anyway, I'll move on.
19 Let us go back to Mr. Lukens and Mr.
20 Hoffman, and look to your testimony about the BWR VIP-21 139. Now as I understand the idea is that for the 22 time being, the steam dryer monitoring program, Rev 3, 23 which was approved under the uprate, will be 24 monitoring the management program for the steam dryer 25 to the end of time, unless this contingency occurs, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1213 1 right?
2 Now let's look at this: "Vermont Yankee 3 will evaluate BWR VIP-139 once it is approved by the 4 staff and either include its recommendations in the 5 VYNPS BWR, vessels improvement ground, or inform staff 6 of the YYNPS's exceptions to that document. Is that 7 what's going to happen when BWR VIP-139 comes out and 8 is approved?
9 MR. LUKENS: Yes, is it. The BWR VIP-139 10 incorporates the SIL requirements as additional backup 11 technical material, it looked like the SIL was maybe 12 20 some-odd pages. The VIP document was on the order 13 of 200 pages.
14 JUDGE KARLIN: So the BWR VIP-139. Let's 15 think about the things that have to happen. First, 16 the staff has to approve it, right?
17 Is that right, Mr. Scarbrough?
18 MR. LUKENS: If I may, Your Honor.
19 JUDGE KARLIN: Yes?
20 MR. LUKENS: The BWR VIP Program sponsored 21 by EPRI has been committed by the entire BWR industry 22 to NRC and is part of our current licensing basis.
23 BWR VIP-139 was issued in 2005 and we --
24 JUDGE KARLIN: What do you mean issued?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1214 1 MR. LUKENS: Issued by EPRI and therefore 2 incorporated into our current licensing basis as part 3 of our requirement for dryer inspection.
4 JUDGE KARLIN: So EPRI is the Electric, 5 Edison, Electric --
6 MR. LUKENS: The Electric Power Research 7 Institute.
8 JUDGE KARLIN: And EPRI is the entity that 9 previously in this proceeding refused to allow NEC to 10 look at the documents? Okay, so EPRI and the industry 11 put together BWR VIP-139?
12 MR. LUKENS: That's correct.
13 JUDGE KARLIN: Is it a public document 14 that we can see?
15 MR. LUKENS: It is proprietary.
16 JUDGE KARLIN: So it's not public 17 document?
18 MR. LUKENS: That's my understanding.
19 JUDGE KARLIN: Nobody can see it except 20 the industry.
21 MR. LUKENS: That's my understanding.
22 JUDGE KARLIN: And it was developed by the 23 industry and it's been submitted to the NRC, is that 24 correct?
25 MR. LUKENS: Yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1215 1 JUDGE KARLIN: And New England Coalition 2 and no one else has seen it? Now, it's under review 3 by the Agency. Is that correct, Mr. Scarbrough?
4 MR. SCARBROUGH: Yes, it is.
5 JUDGE KARLIN: And are you part of the 6 review team?
7 MR. SCARBROUGH: Yes, I am.
8 JUDGE KARLIN: And when do you expect to 9 make a decision on approval or not approval?
10 MR. SCARBROUGH: I think some time this 11 year. I think it's in the final stages.
12 JUDGE KARLIN: And in the approval 13 process, is there some time an iterative process where 14 the NRC will ask for changes?
15 MR. SCARBROUGH: Right, yes, and we have 16 sent out requests for this new information as part of 17 that. And part of that review was the BWR 139 18 document referred back to the SIL for 644 for guidance 19 in times of repetitive visual inspections and that 20 sort of thing, so one of our questions was, you know, 21 what -- explain that, and they sent answers back in on 22 that --
23 JUDGE KARLIN: Okay, my point is is that 24 there is an iterative process going on between the 25 industry and NRC on BWR VIP-139?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1216 1 MR. SCARBROUGH: Yes, there is.
2 JUDGE KARLIN: And no member of the public 3 is part of that iterative process.
4 MR. SCARBROUGH: We have had public 5 meetings, and when we meet, we have public meetings 6 JUDGE KARLIN: Are they able to see the 7 RAIs that you send out?
8 MR. SCARBROUGH: I believe that they are.
9 JUDGE KARLIN: Are they able to see the 10 BWR VIP-139 that the RAI is about?
11 MR. SCARBROUGH: I would have to ask --
12 JUDGE KARLIN: I'm not surprised --
13 MR. SCARBROUGH: I would have to ask the 14 management --
15 MS. BATY: Your Honor, if we had an 16 opportunity to check, there may be a non-proprietary 17 version of that.
18 JUDGE KARLIN: You can check all you want.
19 We'll be within your --
20 MS. BATY: Yes, I just wondered if we 21 could have an opportunity after lunch to check?
22 JUDGE KARLIN: Okay, so there's iterative 23 process going on between industry and NRC. The BWR 24 VIP-139' may evolve during that process or change in 25 some way. But one that we haven't seen. And this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1217 i Board hasn't seen.
2 And at some point the staff may or may not 3 decide to accept BWR 139, right?
4 MR. SCARBROUGH: Right.
5 JUDGE KARLIN: So there's a contingency, 6 one, will the staff accept BWR-139?
7 There's another contingency will BWR VIP-8 139 change between now and when the staff accepts it.
9 Do you agree, Mr. Scarbrough?
10 MR. SCARBROUGH: Yes.
11 JUDGE KARLIN: And then there's another 12 contingency, as I read this, Mr. Lukens, which is when 13 BWR VIP, once it is approved by the staff, then 14 Vermont Yankee will evaluate it.
15 MR. LUKENS: Yes, sir.
16 JUDGE KARLIN: And then you'll decide 17 whether you want to adopt it.
18 MR. LUKENS: May I explain?
19 JUDGE KARLIN: No, let's read this.
20 MR. LUKENS: That's what it says.
21 JUDGE KARLIN: Vermont Yankee will 22 evaluate BWR VIP-139 once it is approved by the staff 23 and then you get -- you decide whether you want to use 24 it. It's not a commitment to use it if the staff 25 approves it. It's a commitment to use it if the staff NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1218 1 approves and you decide you want to use it. Right?
2 MR. LUKENS: Not exactly, sir.
3 JUDGE KARLIN: Okay.
4 MR. LUKENS: VIP-139- is part of our 5 current licensing basis. NRC approval of VIP-139 may 6 include certain conditions or limitations that go 7 beyond the requirements of VIP-139.
8 Regardless of --
9 JUDGE KARLIN: I'm sorry, what may --
10 MR. LUKENS: The staff approval of VIP-139 11 may include conditions or limitations on certain 12 sections of VIP-139.
13 Since we don't know what those might be, 14 this wording simply says we have to look at any 15 conditions or limitations to determine whether it is 16 possible for us to meet this.
17 JUDGE KARLIN: So what we have is staff 18 may or may not approve -it. Staff may or may not 19 impose conditions on it and if staff imposes any 20 conditions on it or any -- it doesn't say. You can 21 decide whether you want to use it or not.
22 MR. LUKENS: We cannot decide whether we 23 want to use it or not.
24 JUDGE KARLIN: Well, it says "Entergy will 25 evaluate BWR VIP-139 once it is approved by the staff NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1219 1 and either include its recommendations in the BWR 2 Vessels Improvement Program, or inform the staff of 3 Entergy's exceptions to the document", right?
4 MR. LUKENS: That's correct.
-5 JUDGE KARLIN: So you don't like it, you 6 don't have to agree with it?
7 MR. LUKENS: No, sir. That's not true.
8 JUDGE KARLIN: Well, you either agree to 9 it or you say no, we have exceptions.
10 MR. LUKENS: We may take exceptions to 11 additional conditions or limitations that the staff 12 may impose above the requirements of VIP-139, but we 13 are required --
14 JUDGE KARLIN: I thought we just heard it 15 was an iterative process and VIP-139 isn't a done deal 16 until they get finished negotiating with the NRC about 17 it?
18 JUDGE WARDWELL: Let me ask a question to 19 help clarify this for me.
20 I think it was Mr. Hoffman or Mr. Lukens 21 about a half an hour ago stated that the VIP-139 was 22 issued and is filed as of 2005. Is that correct?
23 MR. LUKENS: That is correct.
24 JUDGE WARDWELL: So there is not a draft 25 of VIP-139 floating around. 139 is a final document NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1220 1 issued by EPRI, is that correct?.
2 MR. LUKENS: Yes, .it is.
3 JUDGE WARDWELL: And you're stating that 4 that's part of your current licensing basis?
5 MR. LUKENS: That is correct.
6 JUDGE WARDWELL: So you are obligated to 7 continue that under your current licensing basis?
8 MR. LUKENS: That is correct.
9 JUDGE WARDWELL: Is that going to be 10 extended, is there commitment to extend that in 11 regards to the license renewal?
12 MR. LUKENS: The program of BWR Vessel 13 Internal Program sponsored by EPRI is an on-going 14 process for the life of the plant, yes. That will be 15 an on-going process.
16 -JUDGE WARDWELL: The only thing you're 17 couching here is the phrase "its recommendations" 18 which refer back to staff's recommendations of what 19 they might have in regards to their review of the 20 current final 139 document?
21 MR. LUKENS: That is correct.
22 JUDGE WARDWELL: Thank you.
23 JUDGE KARLIN: Well, that's really -- I'm 24 not sure really that's what it says. That may be your 25 intent, but to me it seems to say you will evaluate NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1221 1 the BWR VIP-139 once it is approved by the staff and 2 either adopt it or tell you, the staff, you have 3 exceptions to it.
4 Now let me go on on page 11, you start, 5 Mr. Lukens, in your testimony, pre-filed anyway, on 6 question 24, and answer 24, the dryer monitoring 7 program and you describe the dryer monitoring program 8 in the next few pages of testimony.
9 Is that the steam dryer monitoring 10 program, rev. 3 under the EPU or is that the steam 11 dryer monitoring program under BWR VIP-139?
12 What are you describing here?
13 MR. LUKENS: We are describing steam dryer 14 monitoring program revision 3 that was implemented 15 during EPU and that will continue for the life of the 16 plant.
17 JUDGE KARLIN: So this is not BWR VIP-139?
18 MR. LUKENS: No, sir.
19 JUDGE KARLIN: We don't know what that is?
20 The Board Members have no idea what that is. Is that 21 correct?
22 MR. LUKENS: Yes, sir.
23 JUDGE WARDWELL: Is that proprietary too.
24 Is that why we don't have that as an exhibit?
25 MR. LUKENS: It is proprietary, yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1222 1 JUDGE KARLIN: And even if there's a 2 nonproprietary version of it, we don't have it, one 3 way or the other, so we can't base a decision on it, 4 I think. But I just want to know when you're talking, 5 I think it's important for us to know as we go on with 6 this contention, when you're describing the plan, 7 there seems to me to be two plans that are floating 8 here. One is the what I'll call existing steam dryer 9 monitoring program rev. 3 that was approved under the 10 uprate and you all would interpret will continue under 11 the renewal. And I understand it will versus the BWR 12 VIP-139 and when we ask questions what are you going 13 to do, how is it going to work, how will it be 14 conducted? I think it's important for us to know 15 which one we're talking about and which one you're 16 talking about. It seems to me the only one that makes 17 any sense here for us today is the steam dryer 18 monitoring plan, rev. 3 that's under the EPU because 19 the BWR VIP-139 is a pig in a poke. We haven't seen 20 it. We don't know what it is. It may not be approved 21 by the staff. It may not be accepted by Entergy. And 22 it's just an absolute blank box that we cannot 23 evaluate or understand.
24 So when you testify, hopefully, you will 25 tell us which one you're talking about and presumably NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1223 1 the only one that is of relevance here today is the 2 one that's on the table right now which is the SD,
- 3. steam dryer monitoring plan rev. 3.
4 JUDGE WARDWELL: And what is that though?
5 Isn't that as much a black box? We don't have that 6 before us either, do we?
7 MR. LUKENS: I'm sure we have. It is an 8 exhibit.
9 JUDGE WARDWELL: Okay. I thought you said 10 it wasn't. The steam dryer monitoring plan rev. 3 is 11 an exhibit.
12 JUDGE KARLIN: Okay.
13 JUDGE WARDWELL: And how-does that relate 14 to 139? 139 was final at the time that was written.
15 MR. LUKENS: That's correct. The steam 16 dryer monitoring plan is based on SIL 644 as it 17 applies to monitoring an inspection. The currently 18 issued VIP-139 does not contain pre-inspection 19 criteria.
20 The inspection guidelines in the two 21 documents are identical, but currently VIP-139 does 22 not contain reinspection criteria. SIL-644 contains 23 those reinspection criteria as I indicated on pages 24 six and seven of the SIL. And SIL-644 applies to 25 uprated plants.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1224 1 So the difference between the SIL and VIP-2 139 is that for uprated plants the SIL contains 3 additional reinspection criteria that are not VIP-139.
4 JUDGE WARDWELL: Let's take the other 5 option then, what happens if, in fact, staff approves 6 it, doesn't have any recommendations, so it's fine the 7 way it is. We're off and running with now VIP-139 8 controlling. Where does the SIL come back into play 9 in regards to assuring there's continual inspections?
10 MR. LUKENS: Perhaps Mr. Scarbrough can 11 address how the SIL is incorporated into the current 12 VIP-139 that's before the staff.
13 JUDGE WARDWELL: I don't care about that.
14 I'm more interested in how does a SIL get incorporated 15 in the aging management plan proposed for license 16 renewal, if in fact, the 139 is approved prior to even 17 issuing the license for this?
- 18. MR. SCARBROUGH: Yes, and that's part of 19 the issue with BWR VIP-139 is that the issue now just 20 refers back, it doesn't have those reinspection forms 21 so that's something that we've been interacting with 22 BWR with about and their proposal in the BWR VIP-139 23 for that document is different. They have a more 24 graded approach. It is a different approach, so that 25 would have to be reviewed as part of the switch over.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1225 1 If they're going to switch over -- if the entity is 2 going to switch over from SIL 644 to BWR 139, the 3 inspection, reinspection forms are different. Right 4 now, the issue version from what I understand don't 5 have any, but the new-version --
6 JUDGE KARLIN: So let me stop you right 7 there. BWR VIP-139 doesn't have any visual inspection 8 forms, is that what you just said?
9 MR. SCARBROUGH: The ones on the street 10 right now --
11 JUDGE WARDWELL: The one that they issued, 12 the one that Entergy is hanging its hat on doesn't 13 have any inspection requirements.
14 MR. SCARBROUGH: Reinspection, and that 15 was one of the questions we asked them. And the 16 answer --
17 JUDGE WARDWELL: And if you decide you 18 want to impose that as a condition, then Entergy says 19 we reserve the right to object to that and not adopt 20 it.
21 Is that right, Mr. Lukens?
22 MR. LUKENS: No, sir.
23 JUDGE KARLIN: So tell me what's right.
24 MR. LUKENS: If the staff says we want 25 uprated plants to continue with the guidance of SIL NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1226 1 644, then the transition from steam dryer monitoring 2 plan to VIP-139 is seamless. We just keep doing what 3 we're-doing.
4 JUDGE KARLIN: Wait a second. But you 5 don't have to. You just said you didn't have to. You 6 weren't going to agree to it.
7 Might agree, might not agree. But it's an 8 opportunity for you to make a decision.
9 MR. LUKENS: SIL 644 reinspection 10 requirements are part of our current licensing basis 11 for the remainder of the plant life.
12 JUDGE KARLIN: But they are not part of 13 BWR 139, VIP-139. BWR VIP-139, if approved by the 14 staff as is, you won't have to do any of those 15 inspections.
16 MR. LUKENS: Yes, sir, we --
17 JUDGE KARLIN: You might do it 18 voluntarily.
19" MR. LUKENS: We still will be obligated 20 under our licensing basis to perform reinspections to 21 SIL-644.
22 JUDGE KARLIN: I don't understand. Let me 23 look at --
24 JUDGE WARDWELL: Let me ask you this then 25 just to clarify that. Is it correct then that you're NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1227 1 saying that all of your current licensing bases that 2 doesn't relate to all of your current licensing 3 bases have to be followed for the extended period of 4 operations for the renewal, unless it's modified by 5 the license renewal itself?
6 MR. LUKENS: That is my understanding, but 7 I'm not a licensing engineer.
8 JUDGE WARDWELL: Mr. Scarbrough, do you 9 have any knowledge or anyone from the staff, Rowley or 10 Hsu?
11 MR. SCARBROUGH: I'm sorry, could you 12 repeat the question?
13 JUDGE WARDWELL: Yes, the question is Mr.
14 Lukens said that SIL is part of their current 15 licensing basis so he was using that as the support 16 for the fact that the ongoing inspections will 17 continue regardless. And my question relates to do 18 all of the current license bases follow through and 19 now exist for the extended period of operations unless 20 modified by the license renewal process?
21 MR. SCARBROUGH: My understanding in terms 22 of like a GE service letter, it's a recommendation for 23 BWR plants to implement some activity based on the 24 knowledge of EEH and SIL 644 is that service 25 information letter. It says you have a piece of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1228 1 equipment and these are the actions we recommend you 2 *perform.
3 My understanding is is those plants are 4 obligated to respond to those recommendations. They 5 have to either implement them or have a reason why 6 they're not implementing them and our expectation is 7 that if there's SIL 644 out there which says you will 8 do this, they are expected to do that or have a 9 justification for why not.
10 JUDGE WARDWELL: Mr. Rowley?
11 MR. ROWLEY: One of our key principles of 12 the license rule is that the current license will 13 carry forward into the renewal period.
14 JUDGE KARLIN: But on page 5 of your 15 testimony, Mr. Scarbrough, at the bottom you say "if 16 BWR VIP-139 is approved, prior to the period of 17 extended operation Entergy would convert to BWR VIP-18 139 guidelines *from the GE SIL 644." This is telling 19 me it's an either/or. You're saying they wouldn't do 20 644 any more. They would do this BWR VIP-139.
21 MR. SCARBROUGH: In terms of the 22 guidelines, the BWR VIP-139 is much more extensive in 23 terms of the information that they provide.
24 JUDGE KARLIN: I'm not looking for 25 guidance. I'm looking for permit conditions that are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1229 1 enforceable by NRC. And are you saying 644 is gone 2 and BWR VIP-139 comes into place in lieu thereof?
3 MR. SCARBROUGH: In terms of the license 4 renewal that was their request, that they have the 5 option to switch over --
6 JUDGE KARLIN: They have the options.
7 MR. SCARBROUGH: Yes. And the intent 8 would be that BWR VIP-139 has more information and 9 that there are some areas in it where it recommends-10 additional inspections in terms of the guidance based 11 on lessons learned since it was issued. So there are 12 some places where it actually adds additional 13 inspection areas of the dryer. So there are some 14 improvements in the latest versions because they have 15 been responding back in those issues and in March of 16 '05 they've been responding back to questions that 17 have taken place that they're going to upgrade it and 18 improve it as they go by. But this is a statement 19 saying that this was our understanding of the actions 20 that will take place --
21 JUDGE KARLIN: It wasn't saying it was 22 your understanding, it was your testimony under oath 23 that that's what would happen.
24 MR. SCARBROUGH: Right, that was my 25 understanding of what they would do. They would be NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1230 1 converting over to --
2 JUDGE KARLIN: No, you're the regulator.
3 Why don't you tell us what the regulatory -- what 4 you're imposing. It sounds like that's what you're 5 saying. If this happens, then A. If it doesn't 6 happen, then B.
7 MR. SCARBROUGH: Right, our expectation 8 would be that they would continue.
9 JUDGE KARLIN: All right.
10 JUDGE WARDWELL: Staff was required to 11 make an assessment that -- let me back up quickly. We.
12 all agree that the steam dryer falls under aging 13 management review. Do you agree?
14 MR. SCARBROUGH: Yes.
15 JUDGE WARDWELL: Entergy, do you agree 16 with that?
17 MR. LUKENS: Yes.
18 JUDGE WARDWELL: There's a requirement 19 that demonstrates that aging management is carried but 20 for the life of the plant or if you have, in effect, 21 demonstrated through aging management analyses as 22 required, no one has brought up any TLAAs in this 23 situation, so we're into developing an Aging 24 Management Program for the steam dryer. Is that 25 correct?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1231 1 - Do both parties agree to that?
2 MR. LUKENS: Yes.
3 MR. SCARBROUGH: Yes, sir.
4 JUDGE WARDWELL: What is in your 5 understanding the Aging Management Program that 6 Entergy is going to be implementing that you approved 7 in regards to saying that it's adequate under as 8 documented in the FSER?
9 MR. SCARBROUGH: I was not a party to 10 writing the license renewal FSER, but in terms of the 11 power uprate 12 JUDGE WARDWELL: No, I'm -- okay, then I'm 13 not interested in your testimony.
14 MR. SCARBROUGH: Okay.
15 JUDGE WARDWELL: Are either of you three 16 able to address what is the Aging Management Program 17 that the staff is approving as being a demonstration 18 that the management of this particular component, the 19 steam dryer, will be managed throughout the life of 20 the plant?
21 MR. ROWLEY: At this moment, it is the 22 steam dryer monitoring plan, revision 3, that 23 incorporates GE SIL 644.
24 JUDGE WARDWELL: And where is that stated 25 as their proposed Aging Management Program?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1232 1 MR. ROWLEY: It's on page 3-56 of the SER, 2 the Aging Management Program VIP, vessel internal 3 program.
4 JUDGE WARDWELL: I can't refer to this 5 right now off the top, quickly, but do they have any 6 statements in their application stating that is their 7 Aging Management Program for the steam dryer?
8 MR. SCARBROUGH: I can't recall exactly 9 what the application says.
10 JUDGE KARLIN: Let me go to page six of 11 the testimony Qf the staff. Question 4C. This is Mr.
12 Hsu. Is that the correct pronunciation, sir?
13 MR. HSU: Yes.
14 JUDGE KARLIN: Hsu, and Mr. Rowley, "the 15 staff finds the implementation of BWR VIP-139 16 acceptable because BWR VIP-139 will provide guidance 17 for use of the latest methods and technologies,"
18 etcetera.
19 Are you with me there?
20 MR. HSU: Yes.
21 JUDGE KARLIN: Now this is the BWR VIP-139 22 that we haven't seen.
23 Mr. Scarbrough, it is your testimony that 24 the staff is likely to take final action approving 25 that within this year?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross-com v
1233 1 MR. SCARBROUGH: I believe so.
2 JUDGE KARLIN: And you're on the group 3 that's reviewing that?
4 MR. SCARBROUGH: Yes, sir.
5 JUDGE KARLIN: So by the end of the year, 6 the steam dryer monitoring program, rev. 3 that the 7 staff has based its approval on will disappear and a 8 whole different program will be applicable to this for 9 the next 20 plus years.
10 MR. SCARBROUGH: I assume so.
- 11. JUDGE KARLIN: I mean there's a juncture 12 coming which is the staff approval of BWR VIP-139.
13 Until that juncture occurs, steam dryer management 14 plan, rev. 3, is the one that they're committed to and 15 you're suggesting there's approval upon when that 16 juncture occurs, if the staff approves it, if Entergy 17 decides to accept it, then a whole other program jumps 18 into place, BWR VIP-139. Is this correct, Mr.
19 Scarbrough?
20 MR. SCARBROUGH: Yes, it's a different 21 program.
22 JUDGE KARLIN: And we don't know anything 23 about it, this Board, this Intervenor. Is that 24 correct?
25 MR. SCARBROUGH: Yes, sir. I assume so.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1234 1 JUDGE WARDWELL: And let's go on. We do 2 know something about it. We know it's not as rigorous 3 in regards to the inspection program that the SDMP is.
4 MR. HSU: We are not sure right now
.5 because --
6 JUDGE WARDWELL: We're talking about what 7 we're --
8 MR. HSU: The 139 of not being approved by 9 the staff yet, okay, that's the BWR VIP-139 issuer.
10 They're the issuer. But after -- and last year 11 approved -- they're going to issue another version of 12 the BWR VIP-139. They call it BWR VIP-139A which 13 includes all the steps additional inspection, 14 additional requirements and all the additional 15 improvement in there. So that's all BWR VIP-139 is 16 working on.
17 JUDGE WARDWELL: That's fine, if I can 18 interrupt. I understand that. And that's fine, but 19 that's a potential in the future. That's not reality.
20 MR. HSU: Yes.
21 JUDGE WARDWELL: You made a statement here 22 at page six that Judge Karlin just quoted where you 23 say the staff finds that the implementation of BWR 24 VIP-139 acceptable because BWR VIP-139 will provide 25 the guidance for use of the latest methods and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1235 1 technologies, yadda, yadda, yadda.
2 That statement was made I can say with 3 confidence prior to any of the future implementation 4 you've just described that may take place in the 5 future. I've heard testimony today that the current 6 139 that you say is acceptable here does not include 7 inspections in it. Is that correct?
8 JUDGE KARLIN: Mr. Scarbrough?
9 MR. SCARBROUGH: That's correct. It does 10 not. It refers back to SIL 644. It indicates that 11 there was not -- there was not reinspection 12 requirements and that was one of our questions to EPRI 13 that was -- and they refer back to 644 in their 14 response to us.
15 MR. LUKENS: Your Honor, if I might 16 clarify, the inspection criteria in VIP-139 are 17 identical to the inspection criteria in SIL 644. The 18 difference is VIP-139 as currently issued, does not 19 have reinspection criteria. The SIL does have 20 reinspection criteria.
21 JUDGE WARDWELL: Staff, how could you make 22 the statement on page six that you find implementation 23 of 139 acceptable without that reinspection criteria?
24 MR. SCARBROUGH: Our understanding was 25 that in lieu of not having that the SIL 644 guidance NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1236 1 would be followed. In terms of the reinspection 2 because our discussions with BWR VIP was that they 3 were not trying to set up the reinspection 4 frequencies, but they were going to leave that to GE 5 SIL 644. That was the plan. And the response to a 6 question from us they said well, we're looked at. the 7 data and we're going to have a more graded approach.
8 So their original plan was they were going to develop 9 a later addition of 139 with all the data that they 10 have from all the inspections of all the steam dryers.
11 JUDGE WARDWELL: You're repeating 12 yourself. You still haven't answered my question.
13 How could you make the statement that the 14 limitation of 139 is acceptable without that and all 15 you're saying if I configure what you've said now is 16 that you made that in the back of your mind you were 17 thinking that's because SIL also would be incorporated 18 in. some way, but it's not documented or assured 19 anywhere.
20 MR. SCARBROUGH: Yes, sir.
21 JUDGE WARDWELL: Mr. Lukens, what did you 22 propose in your application as your Aging Management 23 Program for the steam dryer? If you could quote the 24 page or reference in that application where you 25 addressed this?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1237 1 MR. LUKENS: In our testimony at page 11, 2 the response to question 24.
3 The question is please describe the 4 proposed steam dryer monitoring program.
5 JUDGE WARDWELL: I'm sorry, what page 6 number?
7 MR. LUKENS: Page 1i.
8 JUDGE WARDWELL: Okay.
9 MR. LUKENS: And answer 24 provides the 10 description of the steam dryer monitoring program and 11 at seven lines up from the bottom of that bottom 12 paragraph, I'm sorry, this contains monitoring 13 provisions. It apparently does not have the word 14 inspection here.
15 JUDGE KARLIN: Well, let me try to help 16 you there, Mr. Lukens. I think if we go to the 17 preceding page, page 10, that's the one I was asking 18 you questions about and the question is please 19 describe the Aging Management Program for the steam 20 dryer for the license renewal application and there 21 you cite to section of the license renewal application 22 3.1.2.2.11 that we were talking about earlier.
23 MR. LUKENS: Yes.
24 JUDGE KARLIN: Check cracking due to flow-25 induced vibration is managed by the BWR's vessels NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1238 1 internal program, whatever Lhat is. The vessels 2 approved currently incorporates GE SIL 644 and then we 3 talk about the BWR VIP event in the future doesn't 4 sound like it's very far in the future, end of this 5 year, when a new plan can spring into place if you 6 agree to it.
7 Is that -- so the current one is -- this 8 is your testimony here, is it not?
9 JUDGE WARDWELL: So that is your aging 10 management plan?
11 MR. LUKENS: Our aging management program 12 today is SIL 644.
13 JUDGE KARLIN: And as you previously 14 testified when I asked about page 11, 12, 13, when you 15 describe your steam dryer monitoring program the 16 description is what? The SDMP rev. 3 or the BWR VIP-17 139 and you said SDMP rev. 3. Is that correct?
18 MR. LUKENS: Correct.
19 JUDGE KARLIN: So this is not BWR VIP-139, 20 what you're describing in answer to question 24, 25, 21 26?
22 MR. LUKENS: That's correct.
23 JUDGE KARLIN: Okay. So if we go back to 24 FSER 3-175, let me ask this of the NRC staff, in this 25 long document here, where does the FSER discuss the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1239 1 steam dryer Aging Management Program? I found the 2 discussion at 3-174 to 3-175.
3 MR. ROWLEY: On page 3-56.
4 JUDGE KARLIN: Mr. Rowley has referenced 5 us to 3-56. That was helpful. I understand there's 6 a condition, commitment 37 in the appendix. And I 7 understand that there's a reference on page 1.12 in 8 the license conditions.
9 Am I missing discussion anywhere else in 10 this long document? is this where you discuss the 11 steam dryer management program? Are there any other 12 places where a more thorough discussion or any more 13 details?
14 MR. ROWLEY: I have to get back to you on 15 that one.
16 JUDGE KARLIN: Okay. We'll be taking a 17 break here in a little bit. I mean I don't know if 18 there is. I don't think there is. I'm not trying to 19 trick you. I just didn't find it. And if there is, 20 I'd like to read it and study it. But on page 3-175, 21 it says staff finds that since the applicant committed 22 to implement BWR VIP-139, if approved by the staff, 23 this aging effect or mechanism will be adequately 24 managed as recommended by GALL that Dr. Wardwell was 25 questioning about.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www nealrnrss corm
1240 1 In the alternative, "if the staff does not 2 issue an SER approving BWR VIP-139, steam dryer 3 inspections will continue in accordance with steam 4 dryer monitoring plan rev. 3. The steam dryer 5 monitoring plan would also assure the aging effects 6 that the mechanism will be adequately managed. So the 7 staff is saying either way, you're satisfied that the 8 steam dryer aging management will be adequately 9 managed. Is that right?
10 MR. HSU: Yes.
11 JUDGE KARLIN: All right, I think at this 12 point we need to take a short break. Why don't we 13 take a break for 10 minutes, if we would, please. In 14 10 minutes we'll reconvene. At this point, we're 15 adjourned.
16 (Off the record.)
17 JUDGE KARLIN: All right, we will go back 18 on the record, Mr. Reporter.
19 I will remind the witnesses you are still 20 under oath, so please recognize that.
21 Now I think the NRC staff had a question 22 that you might want to give us - did you find anything 23 more on the FSER? Did you have enough time to do 24 that?
25 Okay.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1241 1 MR. ROWLEY: No, sir, those two locations.
2 JUDGE KARLIN: Those are the only 3 locations? -All right, fine.
4 All right, we will proceed.
5 Dr. Reed.
6 JUDGE REED: We're going to shift gears, 7 and focus more specifically on the contention that NEC 8 has brought forward, and just to refocus us, I'd like 9 to ask Dr. Hopenfeld to remind us in hopefully a very 10 few words exactly what the bone of contention is here.
11 Would you restate the contention three for 12 us as succinctly as you can?
13 DR. HOPENFELD: The contention right now is 14 based on an in-service inspection, and primarily 15 moisture monitoring.
16 The contention is, the contention is that 17 fatigue crack from high-cycle flow-induced vibrations 18 cannot be monitored, but in-service inspection.
19 Also moisture monitor is up to the tap, 20 and it's not reliable as an indicator of potential 21 drier disintegration. It's the essence of it.
22 Am I loud enough?
23 JUDGE REED: No, that's fine. That's 24 helpful.
25 Do you have something further to say?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neatrgross.com
1242 1 DR. HOPENFELD: The issue is, 2 disintegration of the drier that form new spots that 3 can be carried into the steam lines or they can deform 4 in some unanticipated places, and that you will 5 interfere with the normal operation of the plant or 6 abnormal operation, or DBA-designed accidents.
7 JUDGE REED: Okay, let's stop there.
8 Now you have stated in your testimony that 9 public safety hazard will result if the drier was 10 damaged in some -
11 DR. HOPENFELD: I can't hear.
12 JUDGE REED: You couldn't hear?
13 I'm sorry. I'll turn toward you and speak 14 more clearly.
15 You had stated that a public safety hazard 16 would result if the drier was damaged, and some of its 17 parts broke loose and were transported by flow or 18 gravity to other areas of the reactor system.
19 I think I've just restated what you said 20 earlier?
21 DR. HOPENFELD: Correct.
22 JUDGE REED: So you agree with that 23 statement?
24 DR. HOPENFELD: Yes.
25 JUDGE REED: Would you explain in your mind NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1243 1 how would these loose parts constitute a safety 2 hazard?
3 DR. HOPENFELD: Well, I will give you the 4 example that I remember from many years --
5 JUDGE KARLIN: I'm having trouble hearing 6 you. Can we take a brief break right here? We might 7 need to close the window.
8 (Whereupon, the matter went off the record 9 briefly.)
10 JUDGE KARLIN: Go ahead, continue.
11 DR. HOPENFELD: Where the bathroom got 12 breached, and got into the -- and blocked the flow 13 channel of the fermium reactor. That's the extreme 14 example.
15 We had many examples, in the case of BWRs 16 in a steam generator.
17 JUDGE REED: What kind of reactor was the 18 fermium reactor?
19 DR. HOPENFELD: It was a sodium-cooled 20 reactor. It was a prototype.
21 JUDGE REED: Did it have anything to do 22 with the steam drier?
23 DR. HOPENFELD: No. I'm just giving you 24 the extreme case, asking what's possible in an extreme 25 case. I can't visualize how it's going to get in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1244 1 there. In one extreme case the part can block the 2 channel or block flow channels on the top. It's not 3 the same reactor, no. The concept is the same.
4 Also in the case. of the BWR- steam 5 generators, we had many situations where loose tar 6 because of J-tubes forming part of coming down that 7 would cause interference with the - causing tubes to 8 vibrate, and causing them to wear out that led to 9 steam generated tube rupture.
10 These are examples. I cannot anticipate -
11 - you can premise about the infinite number of 12 scenarios where safety functions would be affected.
13 Flow parts could go in there and block the - or 14 interfere with the safety relief valve. But you know 15 I haven't looked at all the possibilities. This is 16 some significant number.
17 JUDGE REED: So the two things that I heard 18 that you were concerned with is the flow channel not 19 be blocked, or that the safety release valve:
20 DR. HOPENFELD: I gave you an example.
21 That's not what you heard. What I'm trying to say, it 22 interfered with the safety functions of the system, of 23 the reactor, during normal and abnormal operation. I 24 gave you two examples, but just examples.
25 JUDGE REED: If the plant were shut down NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1245 1 immediately following the generation of loose parts, 2 do you still believe that there would be a safety 3 problem or a hazard to the public?
4 DR. HOPENFELD: I couldn't answer that in 5 either way, because I don't know. It depends on the 6 particular situation. It depends on what happens 7 during the shutdown due to SCRAM. I don't know. It 8 depends where the parts are, or what is being blocked.
9 JUDGE REED: You are postulating these 10 loose parts and suggesting it would be a safety 11 hazard?
12 DR. HOPENFELD: Yes.
13 JUDGE WARDWELL: So why don't you give us 14 an example of one where it would be a safety hazard 15 immediately after a shutdown?
16 DR. HOPENFELD: Well, I gave you one, if 17 for some reason a relief valve opens up, and it's 18 supposed to open up during an accident, and it doesn't 19 open up.
20 JUDGE WARDWELL: That's true with any 21 accident that has something to do with the steam 22 drier, isn't it?
23 DR. HOPENFELD: No, the steam drier is the 24 source for loose parts in here. That's the purpose fo 25 this whole contention.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1246 1 JUDGE WARDWELL: So your testimony is that 2 the loose part could get up into -
3 MR. FAIR: Oh, it doesn't - no, it doesn't 4 have to come from the steam drier. It can come from 5 some other place. The issue here is the steam drier-.
6 that we found recently, because of the review, about 7 three or four or five or six steam generators have 8 developed cracks because of flow induced vibration, 9 and parts went into places they shouldn't have been.
10 JUDGE WARDWELL: And it is feasible for a 11 part from the steam drier to get to. the relief valve?
12 DR. HOPENFELD: Probably, yes. I can't -
13 I'd have to analyze it. It's feasible for any part 14 from this fuel line, depends on what's the size, to 15 get anywhere in the system.
16 JUDGE REED: Okay, you also stated a little 17 more specifically in your testimony that, and I quote, 18 loose parts may block flow channels in the reactor 19 core; block spray cooling nozzles; or prevent the 20 MSIVs from isolating the system during loss of coolant 21 accidents.
22 You injected this idea of a loss of 23 coolant accident associated with loose parts. So are 24 you postulating a LOCA associated with a steam drier 25 failure?
.NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealraross.com
1247 I DR. HOPENFELD: All I'm saying is there are 2 certain basis action, steam rupture is one, major 3 steam line rupture. Under that condition, because of 4 the extra loads that you get associated - let me just 5 back up. Under normal condition you have a pressure 6 drop across that drier. That's one way,. In addition 7 to this, you have acoustic sources which generate 8 pressure forces which result in loads on the drier.
9 During transients like LOCAs you have different type 10 of forces. You have flow forces that additionally 11 could impact the drier. You have large sources of 12 energy that could further induce very large vibrations 13 or resonance frequency on the drier.
14 Would you like me to give you an example?
15 I'd be glad to. It's almost at firsthand. When the 16 Turkey Point. in Florida started up, it was heated up, 17 a steam line broke or relief valve just blew up, the 18 whole building, all the structures, were shaking up to 19 about two to three minutes. There was a tremendous 20 amount of energy released.
21 Now you have a drier that sits there and 22 is just about to crack up, because it's already got 23 cracks. When you have that kind of situation where a 24 large energy release causes large amplitude vibrations 25 on the drier, it will disintegrate, and it would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1248 1 interfere with the safety shutdown of the plant, or 2 whatever you do in a particular situation to shut down 3 the plant safety, to mitigate the accident.
4 And without going into the specifics of 5 the accident, and the whole scenario exactly, I cannot 6 go beyond this point. I can only give you general -
7 JUDGE REED: I would like to persist a 8 little in understanding your concerns about a LOCA, 9 since you introduced that in your testimony.
10 And I'm puzzled as to whether you believe 11 that a failure of the steam drier would occur 12 simultaneously with a LOCA?
13 DR. HOPENFELD: Yes.
14 JUDGE REED: Just by chance?
15 DR. HOPENFELD: No, it's not by chance.
16 JUDGE REED: So you think one causes the 17 other?
18 DR. HOPENFELD: Yes.
19 JUDGE REED: Which causes which?
20 DR. HOPENFELD: The forces that are 21 generated due to the LOCA, depends on what the LOCA is 22 and where it is, whether it's a circulating line 23 break, or is there a feedline break, or whatever it 24 is.
25 JUDGE REED: So you are postulating a LOCA NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1249 1 occurs, and that would cause a failure of the. steam 2 drier.
.3 DR. HOPENFELD: Correct.
4 JUDGE REED: And then that failure of the 5.- steam drier then would cause some problem that would 6 make-7 DR. HOPENFELD: In mitigating theaccident.
8 You see when you have an accident -
9 JUDGE REED: Well, if had a LOCA, we kind 10 of had the worst one.
11 DR. HOPENFELD: No, because you can have 12 the LOCA some place, there are various procedures --
13 JUDGE REED: I'm trying to understand what 14 your concern is.
15 DR. HOPENFELD: But you mitigate. And this 16 is -- would be interfering. You say I introduce it?
17 No, I believe it's in the regulation. I don't 18 remember exactly where it is, where you are supposed 19 to mitigate the components. I don't know exactly, 54 20 or something, the component is supposed to withstand 21 normal operation and DBA operation.
22 JUDGE REED: Let me turn to the staff and 23 ask is there any requirement to.consider a failure of 24 the steam drier in association with a loss of coolant 25 accident?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1250 1 MR. SCARBROUGH: No, sir, not that I'm 2 aware of.
3 JUDGE REED: Could you repeat that?
4 MR. SCARBROUGH: No, sir, not that I'm 5 aware of.
6 JUDGE REED: Is there any reason to believe 7 that a LOCA could in fact cause failure of the steam 8 drier?
9 MR. SCARBROUGH: When, as part of the power 10 uprate, the licensee was required to locate at 11 transients, and the load upon transients, from 12 transients, including slowly Vibration loads and the 13 loads from brakes, relief valves opening, different 14 things, they have to go through the transient 15 evaluation and look at the stresses that would be on 16 the drier. And that was part of the evaluation in 17 terms fo power uprate, and the loads allowed under 18 those types of conditions are greater than the loads 19 allowed for normal operations of the steam drier 20 because of fatigue. There is allowed to be 21 degradation of the drier, some plastic deformation and 22 things of that nature. So there are - the limits are 23 there for higher than the normal loads that we would 24 get from fatigue-oriented loads.
25 And so those - they did look at those, and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1251 1 they found that there was not situations where they 2 would exceed the allowable loads made in the code.
3 Even though this is not a code component, they 4 followed those hints of guidance.
5 JUDGE REED: Can you envision a scenario in 6 which the failure of the steam drier, some loose -
7 generation of a loose part following a loss of coolant 8 accident would exacerbate that accident, would make 9 the conditions worse, or lead to a higher probability 10 of core melt?
11 MR. SCARBROUGH: I'm not aware of - the 12 examples that we had from Quad Cities failure, they 13 had some loose parts. They ended up in various 14 places. But there was not any situation where they 15 caused a safety related component to not be able to 16 perform its function.
17 JUDGE REED: so there was no LOCA?
18 MR. SCARBROUGH: Right, there was no LOCA.
19 JUDGE REED: I'm just following up on.this 20 introduction of the concept of a loss of coolant 21 accident in association with the steam drier.
22 MR. SCARBROUGH: I'm not aware of what 23 might be a problem from that, because with the LOCA 24 situation you are spraying water into the reactor, you 25 are getting the pressure down, you are dropping NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1252.
1 pressure in certain flows-. I'm not aware of what --
2 you would be trying to mitigate that event. And I'm 3 not aware of what might be additional problems caused 4 -by a drier heat problem.
5 JUDGE REED: Is there in your mind any 6 scenario by which a loose part from the drier could.
7 interfere with the injection of cooling water flow 8 following a LOCA?
9 MR. SCARBROUGH: No.
10 JUDGE REED: Is that likely in your mind?
11 MR. SCARBROUGH: No, sir, I don't think it 12 would interfere with the cooling water flow during the 13 testing.
14 JUDGE REED: Dr. Hopenfeld, is there 15 anything you would like to add?
16 DR. HOPENFELD: Definitely. First of all, 17 I haven't seen, or they haven't provided us with an 18 analysis as to what they have done, and I don't 19 believe they have provided the Board with what kind of 20 study they have done in the year or two in studying 21 these things.
22 JUDGE REED: To study these things?
23 DR. HOPENFELD: Yes, to study the accident 24 scenarios, to ask your question, the drier 25 disintegrating and resulting in interfering with the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1253 1 mitigation of the accident.
2 I don't know what kind of study, they 3 haven't presented to us any of these studies. But I 4 concur from what -the gentleman says that usually they 5 are looking into the drier in perfect condition. When 6 the drier is in perfect condition, you can see that if 7 you put all those loads on it, it may stay in perfect 8 condition.
9 But the issue here is we already you have 10 a pre-cracked drier. To a certain point, if you don't 11 know how pre-cracked it is, you have -
12 JUDGE REED: Well, we - pardon me - we are 13 going to investigate that in some detail. So let's 14 leave the question of not knowing for a moment, and 15 proceed with this assumption that it does fail.
16 How can it do damage? That is the issue.
17 DR. HOPENFELD: Oh, okay.
18 I'll give you one example. Suppose the 19 parts come in, fall down and interfere with the water 20 that comes out of the spray nozzle, just don't let the 21 water out. I don't know where those parts would fall.
22 Suppose the whole lead hardened structure just falls 23 on the core.
24 JUDGE REED: I'm not entirely familiar with 25 boiling water reactors, so I'm needing some help here NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1254 1 from this panel of experts.
2 What is - it seems unlikely to me that a 3 loose part from the top of this reactor would be able 4 to find its way down and block an inlet flow for 5 cooling water.
6 DR. HOPENFELD: That was just one scenario.
7 JUDGE REED: I just would like to ask NRC 8 once again whether you see any mechanism by which that 9 would be either possible or likely?
10 MR. SCARBROUGH: No, sir, not for the 11 injection flow. The steam drier in terms of the 12 pieces, if there were pieces, they could come out and 13 go down the steam lines. There are relief valves 14 there. There are Ids there.
15 JUDGE REED: So failure of a valve is a 16 possibility, but it's more likely that the loose parts 17 would be carried down the steam lines and cause some 18 failure down in that part of the system?
19 MR. SCARBROUGH: Yes, there was a situation 20 at Quad Cities where a cover plate fell down directly 21 on top of the motion separator. It was a large piece, 22 and sat there. There is another piece at Quad Cities 23 which they think did migrate down to the bottom of the 24 reactor vessel head, where there was very low flow.
25 There is potential for components to move NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1255 1 various places. From a point of view of a relief 2 valve, unless the relief valves were open there is no 3 driving head to push that piece up into the branch 4 line for that relief Valve. It is going to be sort of 5 carried on down the stream, and there were some pieces 6 found at Quad Cities in the turbine strainers. There 7 were some strainers, found some pieces in the -- but 8 that's - they do look at things like that. And 9 actually the BWR VIP is - they have a BWR VIP 06 -
10 JUDGE REED: VIP?
11 MR. SCARBROUGH: Yes, BWR V-I-P.
12 JUDGE REED: V-I-P?
13 MR. SCARBROUGH: That group is looking at 14 a document, they have a document called 06 where they 15 look at various loose parts, and that is part of one 16 of the documents they are upgrading now to look at 17 where the potential - where could all these loose 18 parts go if there were any. And that's what they are 19 evaluating.
20 But in terms of a LOCA, I'm not aware of 21 places where there might be a problem with injection 22 flow.
23 JUDGE REED: Dr. Hopenfeld.
24 DR. HOPENFELD: In safety studies what you 25 do is, you look at vulnerable places, even in channel, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1256 1 some valve that interferes with the shutdown 2 procedure. And there may be others, some of them like 3 I can't even think of, but there are many. You go 4 through that, and you say, I don't know where this 5 thing comes from. I know I have a potential source 6 somewhere; I don't know how to get to it. Okay? You 7 look at those, and you see what the consequences are.
8 And then you run an insanity study and see whether 9 that makes sense, whether you really have that kind of 10 - insanity.
11 JUDGE KARLIN: Insanity? Okay.
12 DR. HOPENFELD: You see -
13 JUDGE KARLIN: Is that an acronym?
14 DR. HOPENFELD: No, I was just quoting 15 these things that I hear. I have a very simple mind.
16 So you see whether that makes sense.
17 Now what we *hear here, it's talk talk 18 talk, that we haven't done this, and we are looking at 19 a situation that occurred four years ago and there 20 were some parts carried into the turbine lines. But 21 that is not a generalization. That's not a safety 22 study that happens here. All that is it just sends 23 you a signal because of better luck. But I haven't 24 seen anybody conducting a safety study to see where 25 those loose parts would come in. I've seen those NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1257 1 studies done many years ago for BWRs and steam 2 generators, the same thing. You don't sit there and 3 figure out exactly how the thing is going to 4 disintegrate, and when it's going to blow up. You 5 just can't postulate that kind of thing. It's just 6 too difficult. It depends on how weakened - you see 7 what happens is,. the reason this thing is brought up 8 is because the structure is weakened, okay. You 9 already have a weakened structure. And that's what 10 you worry about. If it's weakened, then all these 11 parts - by itself, the steam drier by itself is not a 12 safety function. It's not a safety-related component, 13 and it probably wasn't in the design for ASME code.
14 But now what we see, we have experience 15 here, that you have four or five reactors have 16 experience failure in this area, then that's the 17 reason you have to see what the safety consequences 18 are. And I haven't seen a study of that.
19 JUDGE REED: Okay, can I ask you to pause 20 there.
21 And since you brought up this concept of 22 several reactors having failures, I'd like to pursue 23 that for a moment.
24 I'd like to direct my questions on this to 25 Entergy. I'm not sure exactly which of you two NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1258 1 gentlemen is the right person to answer these 2 questions, but I will address them to both of you.
3 So what- I'd like to do is understand a 4 little bit better about the history of steam drier 5 failures, in particular, I'd like to know more about 6 the Quad Cities incidents of 2002 and 2003.
7 So I wonder if someone could briefly 8 describe for me what happened in that reactor, in 9 those years?
10 MR. HOFFMAN: Yes, sir. I might need to 11 -refer to a document.
12 JUDGE REED: Speak very loudly.
13 MR. LUKENS: Yes, sir, I will answer that 14 question.
15 Quad Cities went through I believe it was 16 a 117 percent power uprate. We started plant 17 operation in early 2007 - March of 2002, excuse me.
18 i believe it was March of 2002.
19 JUDGE REED: They started operations at the 20 new -
21 MR. LUKENS: At the elevated power level.
22 JUDGE REED: And what was the increase?
23 MR. LUKENS: 117 percent I believe.
24 JUDGE REED: I thought it was 13 percent, 25 but was it 17 percent?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1259 1 MR. LUKENS: Yes, 1-1-7, yes, sir.
2 JUDGE REED: So very close to the 20 3 percent.
4 JUDGE WARDWELL: And what were the absolute 5 power levels before and after? In megawatt or 6 electric?
7 MR. HOFFMAN: I do not know the answer to 8 that question. Nor do I plan to know it.
9 JUDGE WARDWELL: But a similar plant or a 10 very different vintage BWR? How close are they? The 11 two plants?
12 MR. HOFFMAN: Relatively similar, it's a 13 BWR-3.
14 JUDGE REED: Both plants are BWR-3s?
15 MR. HOFFMAN: They're similar. They 16 started operation. Through about three months of 17 operation they noted some increase in motion 18 carryover. At the time that was a new phenomenon, so 19 they apparently didn't understand the meaning of that; 20 operated a little bit longer; shut the plant down -
21 JUDGE WARDWELL: What do you mean by a 22 little bit longer?
23 MR. HOFFMAN: About another month. Shut 24 the plant down, and they found some failures, sections 25 of the steam dryer.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1260 1 JUDGE REED: And didn't they see initial 2 anomalies during the course of that month in plant 3 parameters?
4 MR. HOFFMAN: They found some additional -
5 right - plant parameter anomalies.
6 JUDGE REED: So there is reason to believe 7 that it wasn't a single- incidence, of failure, but a 8 sequence of failures that occurred over a period of a 9 month of operation?
10 MR. HOFFMAN: The plant is in regression of 11 that failure. It started failing, and then progressed 12 further.
13 JUDGE WARDWELL: Did any of the data 14 indicate that? Or is that just a supposition on your
- 15. part?
16 MR. HOFFMAN: That' is a supposition. But 17 obviously, that became the indicator that for unknown 18 - perhaps unknown loadings occurring on steam dryers 19 causing very rapid failures, essentially stress 20 loadings that exceeded the endurance limit of the 21 material and resulted in rapid failure.
22 JUDGE REED: Did you see any plots of the 23 plant parameters over that month to see if there was 24 a trend in any of them, either increasing or 25 decreasing? Or just the jump -
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1261 1 MR. HOFF-PiAN: I have not seen any, no, sir.
2 JUDGE WARDWELL: Has anyone else seen those 3 plots?
4 MR. SCARBROUGH: Nor for that event you are 5 talking about. There was a later event -
6 JUDGE WARDWELL: We'll get to that later, 7 I just-wanted to - while you were still talking about 8 it. Go ahead.
9 JUDGE REED: So can you explain why the 10 plant was not shut down immediately?
11 MR. HOFFMAN: I can't answer. I didn't 12 work for that company. I wasn't there.
13> JUDGE REED: Dr. Hopenfeld?
14, MR. HOFFMAN:: I would like to make one 15 comment. I think it is important, and it's informing 16 to us. And it's on account of, meant made in regard 17 to the new phenomenon. It's very important to realize 18 what we are talking about.
19 Each time - and I watched the thing mostly 20 -- each time there is an event the current that is 21 being used, this is the new phenomena, you go out and 22 look into what happened you find out it is not a new 23 phenomena; it's just a phenomena that nobody has 24 anticipated, because nobody has looked.
25 And what I'm bringing here is a phenomena NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1262 1 that I think somebody should anticipate, that we 2 already have a precursor to indicate that these things 3 do - or could crack up. And you ought to look at it 4 as a safety hazard.
5 And one reason I cannot answer all your 6 questions, where these things go and exactly what 7 happens with them and see that that study should have 8 been done. It's GE's job to do that. But I haven't 9 seen it done.
10 Accordingly, it's a new phenomena. It's 11 getting away fromn that., from doing the analysis.
12 JUDGE REED: Could we continue with your 13 description of the Quad Cities incidents?
14 MR. HOFFMAN: Yes, sir.
15 They shut the plant down, and they 16 revealed, they found a missing part. They modified 17 the plant. The root cause that they determined for 18 that event was high-cycle fatigue.
19 JUDGE WARDWELL: Could you describe that 20 mechanism that causes this fatigue, and how it differs 21 from metal fatigue that, if you were here, we 22, discussed quite much in detail the last day and a 23 half, and what's the difference between the two, and 24 the phenomena of it, and then the parameters or the 25 conditions that tend- to aggravate that particular NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross~com
1263 1 lphenomena associated with steam dryers.
2 MR. HOFFMAN: The difference would be - it 3 is metal fatigue. The high-cycle-fatigue is fatigue 4 resulting generally in lower stresses over a large 5 number of cycles, as compared to what you call low-6 cycle fatigue, which might be a high stress cycle over 7 a low number of cycles.
8 If you recall the discussion about the SN 9 curve, which is the cycles, stress versus the number 10 of cycles, that you can have a very high stress for a 11 low number of cycles; you could have a low stress for 12 a high number of cycles. But you get to a point which 13 you would call the endurance limit. It's the stress 14 below which you could essentially operate an infinite 15 number of cycles and not have fatigue failure.
16 And that is typically accepted to be on 17 the order of 10"7th cycles. If you have a component 18 that has experienced 10 million or more cycles, 10'7 19 cycles or more and hasn't failed, the second 20 conclusion is that it's not subject to fatigue 21 cycling. It will essentially operate untime-limited 22 under those operating conditions.
23 JUDGE WARDWELL: The phrase, vibration 24 fatigue, is also used, isn't it, for this situation?
25 MR. HOFFMAN: The vibration is what the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1264 1 loading is as compared to say a pressure loading or a 2 tensile loading. It is what causes the stress, the 3 fatigue of stress in cycles. And there can be a 4 number of forces that cause that stress.
5 JUDGE WARDWELL: And then the primary 6 source of those stresses are vibration. Are there any 7 other situations that would cause those low-cycle 8 stresses? The size vibration?
9 MR. HOFFMAN: In the case of the dryer, the 10 vibrations, yes, pressure fluctuations causing 11 vibrations, that is correct, sir.
12 JUDGE KARLIN: Mr. Hoffman, before we 13 return to Dr. Reed's questioning, I'm trying to 14 follow. You are talking about certain events that 15 occurred at the Quad Cities facility plant.
16 MR. HOFFMAN: Yes, sir.
17 JUDGE KARLIN: I note that - I'm trying to 18 follow this, the Exhibit D3-09, which is the BWR steam 19 dryer SIL 644 describes a number of events. Which one 20 are we - are we on one of those? For example Appendix 21 A to that 644, SIL 644 describes an event on a certain 22 date. Let's see what the date was. 2002, is that the 23 event you were just testifying about?
24 MR. HOFFMAN: It was -
25 JUDGE KARLIN: Which one?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1265 1 MR. HOFFMAN: Let me find it in this.
.2 JUDGE KARLIN: Yes, the first one.
3 MR. HOFFMAN: Yes.
4 JUDGE KARLIN: On page one of the SIL they 5 refer to a lower horizontal cover plate failure 6 occurred in BWR-3 in 2002. Is that it? I mean I just 7 want to know so I can follow what you are talking 8 about?
9 MR. HOFFMAN: Yes, sir, that is it.
10 JUDGE KARLIN: Okay, then on page two of 11 that SIL 644, they say, Appendix A provides more 12 detailed description of this event. So the event you 13 are testifying about is the event described in 14 Appendix A of SIL 644?
15 MR. HOFFMAN: Yes, sir.
16 JUDGE KARLIN: Great. I'll follow you 17 there.
18 JUDGE REED: I'd like for Mr. Hoffman to 19 continue describing these two events, because so far 20 we have only touched on the first one.
21 MR. HOFFMAN: Okay.
22 The second event was an event at Quad City 23 where they had a power - a power operated relief valve 24 actuation. They repaired the valve, the plant 25 returned to serve. After returning to service they NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1266 1 found a change in the moisture carry-over, unexplained 2 change in the moisture carry-over.
3 Plant operated for it looks like about 4 three weeks. They. saw that the moisture carry-over 5 continued to increase. They reduced the power level 6 to the pre-EPU level, and the moisture carry-over went 7 down.
8 JUDGE KARLIN: May I ask, when you say the 9 second event, is that referred to in SIL 644?
10 MS. HOFMANN: It would be Appendix Bravo, 11 I'm speaking from Appendix B.
12 JUDGE KARLIN: Appendix B, okay, that is, 13 and the event occurred in?
14 MR. HOFFMAN: April of 2003.
15 JUDGE KARLIN: Okay, are you getting your 16 information about this event from SIL 644 17 mR. HOFFMAN: Yes, I am, sir.
18 JUDGE KARLIN: So you have no personal 19 knowledge of any of this?
20 MR. HOFFMAN: I have no personal knowledge.
21 JUDGE KARLIN: Okay, so we could just as 22 well read 644.
23 JUDGE REED: So in both of these events the 24 plant operated for a period of weeks with, if I can 25 use the phrase, off-normal parameters that should have NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1267 1 led the plant operators to be concerned, but they 2 continued to operate the plant with loose parts that 3 had broken off the steam generator - steam dryer.
4 MR. HOFFMAN: The plant continued to 5 operate with those abnormal indications, that's 6 correct, sir.
7 JUDGE REED: I have several questions about 8 this particular series of incidents.
9 First of all, was there an inspection 10 program in place at the time, for the Quad Cities 11 steam dryer?
12 MR. HOFFMAN: Not that I'm aware of, no, 13 sir.
14 JUDGE REED: So they were not looking for 15 cracks?
16 MR. HOFFMAN: They were - no, sir.
17 JUDGE REED: Is this the first time that 18 the steam dryer actually cracked?
19 MR. HOFFMAN: Yes. As a result of power 20 uprate, yes.
21 JUDGE REED: But were there other failures 22 as a result of normal operation?
23 MR. HOFFMAN: I don't know that. I don't 24 know that, sir, no.
25 JUDGE REED: What is the position of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1268 1 Entergy with regard to shutting down the plant, 2 Vermont Yankee, if you detect any of these parameters 3 like moisture carry-over that if. you see a small 4 change, what would your.procedures require?
5 MR. HOFFMAN: We had a procedure that off-6 normal procedure ON-3178, that the operators of - in 7 issue requires them if they see a change in any of the 8 monitored parameters which are, as described in our 9 testimony mismatches in steam flow, changes -
10 unexplained changes in reactor film pressure; 11 unexplained mismatches in reactor water levels; or 12 increases in moisture carry-over. They immediately 13 enter this off-normal operating procedure which 14 requires an assessment of, do we understand why that 15 moisture carry-over changed? Do we understand why the 16 level changed?
17 There may be operating evolutions going on 18 that you would expect those parameters to change, so 19 you would conduct that evaluation. If it did not 20 explain the reason for - the operators and the 21 engineers cannot explain the reason for the changing 22 of those parameters, and they conclude that it might 23 be caused by dryer damage, there are immediate steps 24 to be taken including power reductions and shutdown of 25 the reactor.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1269 1 JUDGE REED: So who would review these 2 changes in parameters, and who would make a decision 3 about continued operation?
4 MR. HOFFMAN: Parameter changes would be 5 reviewed by the operators in the control room before 6 the orientations. If they saw changes in those 7 parameters, and they could not explain why they were 8 changing, because of the evolutions they were going 9 through, they would notify engineering. We would 10 enter our engineering operations evaluation process, 11 bring in the engineering folks to look at the data and 12 start those evaluations.
13 JUDGE WARDWELL: And how long would that 14 take in your estimation?
15 MR. HOFFMAN: They report immediately to 16 engineering. Engineering would start work 17 immediately.
18 JUDGE WARDWELL: This doesn't mean the next 19 day when the engineers show up for work, it means 20 immediately?
21 MR. HOFFMAN: Yes, sir. They would call 22 people in office in order to do those evaluations.
23 JUDGE WARDWELL: So again, it is your 24 belief that if there were a failure of the steam dryer 25 at Vermont Yankee and it were detectible in the sense NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1270 1 that you could see the results in some of the plant 2 parameters, that the plant would be shut down 3 immediately and would not continue like Quad Cities to 4 operate for a period of months?
5 MR. HOFFMANl:-.That is correct; we would 6 not. I could add, also, these - further bolstering 7 of that is, once the issue was found at Quad Cities, 8 the industry - and Vermont Yankee - started looking 9 at, and we analyzed it. We don't have a situation 10 where we have an increase in power level, didn't 11 anticipate those vibrations, and didn't analyze them.
12 They were, as Mr. Scarbrough said, thoroughly 13 evaluated as part of the power uprating process, 14 predicted to be below the endurance limit for the 15 dryer.
16 They started a power extension test 17 program that was conducted during the ascension to the 18 higher power level, confirmed the analytical results.
19 We have confidence that is not operating in a regime 20 that is subject to high-cycle fatigue. And even above 21 that we have this ongoing monitoring program to look 22 for any changes in parameters. We are not relying on 23 - we have a double assurance essentially.
24 JUDGE REED: Are you familiar with the 25 analysis that was done prior to the power uprate?
NEAL R.GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1271 1 MR. HOFFMAN: I personally am not.
2 JUDGE REED: The analysis that was done 3 prior. Mr. Lukens?
4 MR. LUKENS: I was not involved in that 5 analysis.
6 JUDGE REED: Neither of you can speak to 7 the analysis?
8 MR. LEWIS: No, sir.
9 JUDGE REED: But there was some sort of 10 stress analysis done to determine that the fatigue 11 stresses were below this endurance limit; is that -
12 did I phrase that question correctly?
13 MR. HOFFMAN: Yes, that's correct. There 14 were very extensive stress analysis.
15 JUDGE WARDWELL: What endurance limit are 16 you comparing it to? Is it a cyclic limit? Is the 17 limit determined from a cyclic test?
18 MR. HOFFMAN: Yes, it's the ASME code 19 endurance limit.
20 JUDGE WARDWELL: Endurance limit for what?
21 I mean there are all kinds of endurance limits.
22 MR. HOFFMAN: For the material, the 23 material of what's in this new material that the dryer 24 is manufactured from.
25 JUDGE WARDWELL: Are you testifying that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com w
1272 1 they have an endurance limit for cyclic stress 2 loading?
3 MR. HOFFMAN: Yes, the SN curve would go 4 down to a point where it is essentially asymptotic to 5 a horizontal line.
6 JUDGE WARDWELL: This commitment to do 7 these corrective actions that you were describing, 8 these off-normal procedures, is that linked to your 9 aging management plan program in any fashion?
10 MR. HOFFMAN: That is the - these 11 monitorings, these parameters that are monitored are 12 the ones described in the steam generator monitoring 13 plan, yes, sir.
14 JUDGE WARDWELL: The aging management 15 program that was submitted with your application makes 16 no reference to any of these corrective actions that 17 you just described.
18 So how is it linked to that?
19 MR. HOFFMAN: I don't understand the 20 question, sir.
21 JUDGE WARDWELL: In your application there 22 is no reference to any of these off-normal loadings, 23 or any corrective action for that matter. A couple of 24 hours ago we quoted what those were, and it was just 25 basically a commitment to either continue the steam NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1273 1 dryer management program as it now exists, or to go to 2 VIP 139.
3 And that is only with your blessing in 4 regards to some other recommendations. But it has no 5 other details in regards to corrective actions like 6 you have just described that would take place. How 7 are those linked to those aging management programs to 8 assure that they could and would be implemented?
9 MR. HOFFMAN: Those are the implementing 10 procedures for executing the program. In other words 11 the aging management program essentially will monitor 12 those physical parameters, and will conduct periodic 13 inspections. We have converted those statements into 14 implementing plan procedures. And that's what the 15 operators would do; that's what the engineers would 16 use to carry out those requirements.
17 JUDGE WARDWELL: Well, part of a monitoring 18 program associated with aging management would consist 19 of corrective actions as part of the data collection, 20 inspection, interpretation, evaluation and then 21 implementation of what needs to be done in regards to 22 actions associated with the information that is being 23 collected, via visual inspection or monitoring of 24 parameters.
25 You described nice corrective action.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1274 1 Where are those linked to in part of the aging 2 management program?
3 And the reason I ask this is because I 4 assume someone in your company could in fact change 5 some of these off-normal procedures not knowing they 6 are linked to any specific aging management plan 7 required of a license renewal application, potentially 8 even get it approved by the NRC staff if it wasn't 9 flagged that these off-normal operations are linked to 10 this aging management and circumvent what you just 11 described as the program that is needed for this 12 operation?
13 i'm trying to get some assurances that 14 there is a linkage there so that that they can't be 15 changed without recognizing that you are changing your 16 aging management program.
17 Just to avoid too much delay here, if you 18 want to get back to that, we will pick that up after 19 a break or something, if we can remember to get back 20 to it. I won't, so I hope somebody else will remember 21 to get back to it.
22 Let me ask another question then. You 23 have many off-normal procedures, correct, for a 24 variety of different measurements you are making as 25 you normally operate the plant that has nothing to do NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1275 1 with the steam dryer, correct?
2 MR. HOFFMAN: Yes, sir.
3 JUDGE WARDWELL: So in fact, and you may be 4 monitoring, you will be monitoring some of the same 5 parameters you monitor for the steam dryer in regards 6 to other aspects that may be a cause for those off-7 normal types of values. Is that correct?
8 MR. HOFFMAN: Yes, sir.
9 JUDGE WARDWELL: So there is a potential 10 that someone could accidentally - accidentally is the 11 wrong word - inadvertently say, gee, we really ought 12 to change this off-normal procedure if they weren't 13 aware that it's in fact directed in part by the need 14 to monitor this to determine whether the steam dryer 15 is cracking? There is that potential, is there not?
16 Or is the title of this off-normal 17 procedure an aging management program, corrective 18 action for the steam dryer?
19 MR. HOFFMAN: The title is not, but the 20 discussion in the procedure, which is an integral part 21 of the procedure, says steam dryer cracking has been 22 observed in the BWR industry. It's sort of spelling 23 out what the purpose of this procedure is to respond 24 to potential steam dryer cracking.
25 So the procedure does tie a linkage.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1276 1 JUDGE WARDWELL: And what is that 2 procedure? This is a written procedure, and it's in 3 the control room and other places, in engineering et 4 cetera, that dictates what needs to be done in 5 response to various parameters exceeding the critical .
6 values?
7 MR. HOFFMAN: Yes, sir. This is called 8 Off-Normal Procedure 3178, increased moisture carry-9 over.
10 JUDGE KARLIN: Is that an exhibit here? I 11 mean do we have a reference we can see that?
12 MR. HOFFMAN: Yes, it's Exhibit 7, E-3-07 13 BI.
14 JUDGE KARLIN: Great.
15 JUDGE WARDWELL: I think that addresses the 16 delay in question sufficiently.
17 MR. HOFFMAN: Okay.
18 JUDGE KARLIN: And if I may follow up a 19 little bit, as I understand it there is a steam dryer 20 management program consists of a dryer monitoring 21 program and a dryer inspection program, right?
22 MR. HOFFMAN: Yes, sir.
23 JUDGE KARLIN: Correct? And in your 24 testimony on page 11 as we were discussing before, 25 under what you had titled subparagraph B, dryer NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
1277 i monitoring program, that's what we are talking, that's 2 what you have been describing to us, the monitoring 3 program as opposed to the inspection program; is that 4 correct?
5 mR. HOFFMAN: Yes, sir, .that's correct.
6 JUDGE KARLIN: Okay, and the dryer 7 monitoring program, without going over question 24, 8 describe the dryer monitoring program to be 9 implemented. Question 25: How would this be - detect 10 cracking? Question 26: What additional 11 recommendations were contained in Rev. 2 to GE SIL 12 644, question 27, how is the monitoring and moisture 13 carry-over to be performed?
14 Question 28: How and by whom is the 15 significance of measurement and moisture to be 16 assessed? Twenty-nine: How is the monitoring to be 17 performed?
18 All these questions and answers deal with 19 the steam dryer monitoring program, Rev. 3, which is 20 part of the EPU and is going to be continued; is this 21 correct?
22 MR. HOFFMAN: Yes, sir. Our plan is the 23 monitoring during plant operation for abnormal plant 24 operation, coupled with the inspections during the 25 fueling outage.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1278 1 So the aging management is both of them.
2 JUDGE KARLIN: But if BWR VIP 139 is 3 approved by the staff, and Entergy likes it, then all 4 this is gone and something else is going to happen; is 5 that correct? This is not describing BWR VIP 139.
6 Does this describe BWR 139? Or does it describe -
7 MR. HOFFMAN: The parameters are generally 8 the same, yes.
9 JUDGE KARLIN: They are generally the same.
10 MR. HOFFMAN: Correct.
11 JUDGE KARLIN: But this is not a 12 description of BWR VIP 139, this is a description of 13 SDMP - or steam dryer monitoring plan Rev. 3, right?
14 MR. HOFFMAN: That is correct, sir.
15 JUDGE KARLIN: Okay.
16 JUDGE REED: Okay, let's continue talking 17 about the experience of the industry with regard to 18 dryer failures.
19 We talked about Quad Cities. Could you 20 share with us other incidents that have occurred 21 throughout the BWR community?
22 MR. HOFFMAN: There was another event, I 23 wasn't personally involved in any of these events, I 24 am reading from the report. There was a failure in 25 March of 2004, fatigue crack, in the hood panel to end NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v
2 JUDGE KARLIN: And let me stop you. You 3 are reading from SIL 644?
4 MR. HOFFMAN: Yes, sir.
5 JUDGE KARLIN: Okay, fine.
6 MR. HOFFMAN: This particular crack 7 occurred after approximately 16 years of operation, 8 the last nine of which were at a lower-power level 9 increase, 5 percent stretch power. And it concluded 10 that the weld was - this was not - given the length of 11 time they concluded this was not high-cycle fatigue.
12 It was a slower process.
13 JUDGE REED: Did they operate for a period 14 of time with loose parts in the system?
15 MR. HOFFMAN: They did not.
16 JUDGE REED: Did they shut down 17 immediately?
18 MR. HOFFMAN: My understanding of this one, 19 they didn't see any abnormal plant parameters to 20 indicate -
21 JUDGE REED: What led them to discover 22 failure?
23 MR. HOFFMAN: My understanding is there was 24 an inspection during a refueling outage. They were 25 inspecting the dryer, and they found this crack.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1280 1 JUDGE REED: Do you think it's possible in 2 the case of Vermont Yankee that you could operate with 3 loose parts in the system and not detect them?
4 MR. HOFFMAN: Mr. Lucas is here to answer 5 the inspection part. We do ongoing dryer inspection.
6 JUDGE REED: Your inspections occur every 7 refueling outage. What is the period of time between 8 refueling outages?
9 MR. LUKENS: Eighteen months.
10 JUDGE REED: Eighteen months? So you could 11 conceivably operate for a long period of time with a 12 loose part if you are only dependent on inspections.
13 I am looking at how you detect dryer 14 failures - how you monitor the plant to ensure that 15 you are not operating with a failed dryer during 16 routine operation.
17 We will come to inspections in a little 18 bit.
19 MR. HOFFMAN: Our design analyses 20 demonstrated, or concluded, that there would not be a 21 high-cycle fatigue problem which would lead to the 22 generation of loose parts. The startup test - or the 23 power extension test program for the power uprate 24 confirmed the validity of those analyses, and there is 25 nothing that could cause those stresses to change NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1281 1 above what they were when we increased power.
2 JUDGE REED: Well, that may be the case, 3 and if I - if you were betting your money on that, you 4 would say you didn't have to do any inspections or 5 anything. You are confident that you are not going to 6 have these failures. But you can't be certain. Is 7 that correct?
8 MR. HOFFMAN: Not 100 percent certain.
9 JUDGE REED: You've done the analysis, you 10 just said that you - I don't remember your exact 11 words, but you were confident that nothing could fail 12 because you have done some upgrades to the dryer, is 13 that right?
14 MR. HOFFMAN: Yes.
15 JUDGE WARDWELL: In fact this failure 16 mechanism is - didn't you testify that it is low-17 stress cyclic low cadences from vibration as opposed 18 to any high peak stresses that causes this failure.
19 Low stress measurements during the power uprate are 20 significant in what fashion in regards to addressing 21 this mode of failure?
22 Mr. HOFFMAN: High-cycle fatigue is high 23 number of cycles at a lower stress than a low-cycle 24 fatigue, which is high stress low number of cycles.
25 But there still are stress levels associated with it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrQross.com
1282 1 that could cause a failure, and there are stress 2 levels below which you would not get a failure, 3 because of stresses below the endurance limit.
4 JUDGE WARDWELL: And that's where you are 5 in regards to measurements that were made during the 6 power uprate?
7 MR. HOFFMAN: That's correct. The 8 computational setting was below the endurance limit.
9 The power extension test program would further what 10 that remittance level would be, but we are confident 11 that we are below, the stress limit is below cycle 12 fatigue.
13 JUDGE REED: I'm a little puzzled. You 14 keep bringing up this issue of computations. How 15 significant is the analysis that you did prior to the 16 power uprate in the actions that you are taking with 17 regard to the steam dryer today? Is it a significant 18 factor?
19 MR. HOFFMAN: It is not significant 20 anymore, because we demonstrated at the time of power 21 uprate that the stress levels were below the endurance 22 limit and -
23 JUDGE REED: You demonstrated that. Now 24 help me understand how you demonstrated it? By 25 computation?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1283 1 MR. HOFFMAN: Analyses -
2 JUDGE REED: Analysis?
3 MR. HOFFMAN: Analyses were performed to 4 compute stresses. Confirmatory measurements were 5 taken during the power ascension test program to 6 validate those computations. And those are the stress 7 levels that the dryer saw then and continues to see.
8 So we no longer need to confirm those stresses, 9 because there is nothing to cause the stress to 10 change. They were caused by the operation at 120 11 percent power, and that's where we are.
12 So unless we change, unless we increase 13 the power there would be nothing to cause those 14 stresses to increase.
15 JUDGE REED: I believe Dr. Hopenfeld has 16 some contentions with regard to this issue. I would 17 like to give the floor to him for a minute.
18 JUDGE WARDWELL: Can we before we get to 19 -him, I'd like to get to a couple of more points on 20 these stresses if we could.
21 JUDGE REED: Yes, sur.
22 JUDGE WARDWELL: If we could.
23 How are those stresses measured during the 24 power uprate?
25 MR. HOFFMAN: They were measured by NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1284 1 instrumentation placed on the main steam lines.
2 JUDGE WARDWELL: So strain gauges of some 3 sort?
4 MR. HOFFMAN: Strain gauges and pressure 5 gauges.
6 JUDGE WARDWELL: Why didn't you measure the 7 dryer directly, stresses on the dryer directly rather 8 than the steam line?
9 MR. HOFFMAN: I cannot answer that. It 10 would require installation of strain gauges on the 11 dryers. I don't know why that is so.
12 JUDGE WARDWELL: And where are those strain 13 gauges now?
14 MR. HOFFMAN: It's just no longer in 15 service.
16 JUDGE WARDWELL: Are they still in place?
17 MR. HOFFMAN: I don't believe so.
18 JUDGE WARDWELL: Is there a reason why you 19 took them out, do you know?
20 MR. HOFFMAN: The requirement for 21 monitoring ended after a certain period of time.
22 JUDGE WARDWELL: But it seems to me - have 23 you ever heard - are both of you engineers?
24 MR. LUKENS: Yes, sir.
25 MR. HOFFMAN: Yes, sir.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1285 i JUDGE WARDWELL: In your general 2 engineering experience with other industries and 3 facets, have you ever heard of stress monitoring as 4 kind of a common practice for various other types of 5 engineered facilities in -order to assure that it's 6 meeting the design - the anticipation during the 7 design?
8 MR. LUKENS: No, sir.
9 MR. HOFFMAN: I have not.
10 MR. LUKENS: Never heard of anyone doing 11 it.
12 MR. HOFFMAN: I have not, no, sir.
13 JUDGE REED: Let's see, I was about to ask 14 Dr. Hopenfeld if he had any comments regarding this 15 issue.
16 DR. HOPENFELD: On a scale of zero to 100, 17 their liability for their calculation is about 20.
18 The reason - can you hear me?
19 JUDGE KARLIN: What's the basis for 20?
20 DR. HOPENFELD: My judgment, I told you.
21 JUDGE KARLIN: Oh, it's your judgment.
22 DR. HOPENFELD: I told you, from zero to 23 100, I would back him up. What they did, they had 24 strain gauges somewhere in the steam lines, I don't 25 know how many 16, whatever. From those strain gauges NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1286 1 they used an acoustic model, and they calculated what 2 the loads on the dryer are going to be at some 3 critical location using a similar code to what we 4 heard yesterday, some kind of FDN American analysis 5 code reading the stresses, that document sourced. Now 6 going from the steam line, and going to the dryer, is 7 a big step. These equations are not that simple. You 8 got a lot of different sources.
9 I imagine acoustic sources, different 10 interferences, they interact with each other, this is 11 not a trivial case. You just can't do that.
12 Nevertheless they did that, they came up and GE ran a 13 mockup at San Jose to benchmark, calibrate, in other 14 words to see if they can rationalize or explain that 15 those forces are really - are relevant to calculating 16 the stress on the dryer.
17 Then they really never provided the detail 18 of their analysis. They describe it to the ACRS, and 19 they almost laughed about it, they didn't think it had 20 any value, but never heard of -- if you look at NEC 21 JH-54 and 5, the language concludes, what the ACRS 22 conclusion there -
23 JUDGE REED: I'm sorry, could you give that 24 reference again?
25 DR. HOPENFELD: Yes, 54-5.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1287 1 JUDGE REED: Is the reference NEC JH-54 at 2 page 5, sir?
3 DR. HOPENFELD: Yes. ACRS.
4 JUDGE REED: Okay, that's your report.
5 DR. HOPENFELD: Yes, it's my report. I 6 don't see it - yes, okay, I said - I said in the 7 middle of the page there, you will see you there the 8 interpretation of the strain gauge data. If you ask 9 the ACRS questions about whether they have done LOCA 10 models -
11 JUDGE REED: Whoa, whoa, paragraph and line 12 number, please.
13 DR. HOPENFELD: The second paragraph.
14 JUDGE REED: The second paragraph?
15 DR. HOPENFELD: On page five.
16 JUDGE KARLIN: So in that second paragraph 17 it says, this is your report, this is what you wrote.
18 DR. HOPENFELD: Right.
19 JUDGE KARLIN: You are saying, and you 20 quote: quote, ACRS questioned the validity of the 21 analytical models, close quote.
22 Okay, that is your statement of what- you 23 are quoting yourself as to what you are saying ACRS 24 said.
25 DR. HOPENFELD: Right.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1288 1 JUDGE KARLIN: Now, how do we know they 2 really said that?
3 DR. HOPENFELD: I gave a reference.
4 JUDGE KARLIN: Is that an exhibit here?
5 DR. HOPENFELD: Is it? I don't remember.
6 I believe it is.
7 JUDGE KARLIN: No, I don't think it is.
8 DR. HOPENFELD: Well, it's reference 10.
9 Yes, it is.
10 MS. TYLER: I have to interject I think at 11 this point if I may.
12 I don't think the original contention 13 three was largely about the validity of the stress 14 load modeling. The validity of these models that you 15 are now discussing with Dr. Hopenfeld.
16 JUDGE KARLIN: Right, which is all thrown 17 out if I might add when we grant the motion for 18 summary disposition.
19 MS. TYLER: They represented that they were 20 not using the models and relying on their prior 21 analysis using the models. And on that basis the 22 board, as we understood it, prohibited us from 23 litigating this issue that you are now discussing.
24 JUDGE KARLIN: That's right. Are you 25 objecting to your witness testifying on this subject?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1289 1 MS. TYLER: I'm just noting I think that he 2 has one paragraph of testimony about this issue in his 3 testimony. And so we, based on instruction from the 4 board, we really haven't submitted evidence -
5 JUDGE KARLIN: Well, let me try to stop 6 you. Are you registering a motion or an objection of 7 some kind, or is this just a speech? There is not 8 motion here. We are allowing him to testify with 9 regard to these computer models.
10 I would expect the NEC and the applicant 11 to object to that, but we are allowing it.
12 JUDGE WARDWELL: And I'll modify a little 13 bit also what Judge Karlin just said. I don't believe 14 we are getting into the details of the model. We are 15 talking about the stress levels that were measured 16 during the uprate to indicate where we are at.
17 I'm sensitive of the fact that unless 18 there is a demonstration that Entergy is relying on 19 those models as part of their aging management plan, 20 the discussion of those stress levels is still 21 applying.
22 It is the motion for summary disposition 23 related specifically to not challenging those use of 24 those models in their aging management program, 25 because Entergy has stipulated that they are not using NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1290
.1 those models.,
2 If in fact it ever comes up here that they 3 do need them, and they testify and end up saying, yes, 4 we really do need that to reach a certain conclusion, 5 then in fact that opens up the door again, at least in 6 my opinion, and we'll have to discuss it as a board at 7 that time.
8 That's all thrown out. In the meantime we 9 are still wanting to have a feeling for how did these 10 stress levels come about, and so far as my question is 11 going to continue on in regards to whether or not it 12 i.s practical to do it as part of an aging management 13 plan, and a reasonable thing to do as an aging 14 management plan.
15 But that's where it's going with it, and 16 I don't believe we spent much time on the model. We 17 are talking mostly about the stress levels.
18 I did hear the ACM wants from them.
19 That's fine. We are not discussing how that applies 20 to the aging management plan yet that I heard.
21 JUDGE KARLIN: All right, so let's just 22 proceed.
23 DR. HOPENFELD: Well, going -
24 JUDGE KARLIN: Do we have a question on the 25 table?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1291 1 JUDGE REED: No, it was Entergy that 2 brought up this issue of models earlier.
3 (Simultaneous voices) 4 JUDGE REED: Did they bring up the models?
5' JUDGE WARDWELL: Yes, they did.
6 JUDGE REED: I thought they were just 7 talking about stress levels.' I didn't hear anything 8 about models from them.
9 JUDGE KARLIN: They didn't use the word 10 models, but they used the word, model, but they used 11 the word, analyses. So I think it's fair game for Dr.
12 Holdenfeld to speak to this subject.
13 DR. HOPENFELD: I think it's very important 14 to the model, when they talk about the validity of 15 this analysis based on these models, it's not based -
16 that's the key - it's not based - they didn't have -
17 they didn't have strain gauges on the dryer to show 18 you-19 JUDGE WARDWELL: So you are testifying, 20 just so -
21 (Simultaneous voices) 22 JUDGE WARDWELL: I'm stopping you now. To 23 simplify and curtail your testimony you are testifying 24 that in fact you object to the accuracy with which the 25 stress levels that they assume to be or calculate to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1292 1 be on their steam dryer during their uprate may not be 2 as accurate as they may think it is.
3 DR. HOPENFELD: Correct, and I'm giving you 4
5 JUDGE WARDWELL: And that-is all we need to 6 know.
7 Is there anything else -
8 DR. HOPENFELD: I said 20 percent, and I 9 was trying to explain why the liability of their 10 calculation is no better than 20 percent.
11 JUDGE KARLIN: We're not here to litigate 12 the validity of the models that were used for the 13 uprate. We are not here to litigate the uprate that 14 was already litigated.
15 Entergy has representatives, as Dr.
16 Wardwell stated. And we based our ruling on the 17 motion for summary disposition. On the representation 18 that those models and those calculations in the uprate 19 are not the basis for their aging management program 20 in this matter. So we are pushing at the margins to 21 talk about it at all. And unless and until Entergy -
22 or we conclude that Entergy is using those models, 23 then we are not here to litigate whether the models 24 are good or bad.
25 DR. HOPENFELD: We're going by the models NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1293 1 just because the validity of my statement is -
2 JUDGE KARLIN: Just let your counsel, Ms.
3 Tyler.
4 MS. TYLER: I'd like to - if you do reach 5 the conclusion -.that Entergy is relying on that 6 analysis as the basis for its program, then we need to 7 provide Dr. Hopenfeld the opportunity to actually 8 submit testimony, prefiled testimony, about the model, 9 and I don't think I don't think you. should be asking 10 him to testify extemporaneously about something that 11 he hasn't had the opportunity to -
12 JUDGE KARLIN: All right, I think that is 13 fair enough. But that is not the issue that is before 14 us here today. And if we devolve into an issue in 15 this case we may have to deal with that at the time.
16 But we don't see it as it, so I agree with that.
17 DR. HOPENFELD: Well, I'm sorry if I 18 strayed off the farm.
19 JUDGE KARLIN: That's fine.
20 JUDGE WARDWELL: I think it's fair for you 21 to put in perspective what you thought the accuracy of 22 that stress measurement was.
23 DR. HOPENFELD: That's all I was trying to 24 do.
25 JUDGE WARDWELL: Okay, we got that. Let's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1294 1 move on.
2 JUDGE REED: Okay, so let's go back to the 3 issue, which is detection, monitoring programs, how 4 you detect loose parts.
5 My understanding is that you monitor 6 certain plant parameters, and that they go off normal 7 to some degree, then you call in a plant engineer and 8 look at the situation and decide whether or not you 9 have loose parts, failure with the steam dryer.
10 Is that correct?
11 MR. LUKENS: Yes.
12 JUDGE REED: Do you have any loose parts 13 monitoring system that listens for loose parts?
14 Anything other that might alert you to the fact, the 15 system?
16 MR. HOFFMAN: We don't have a loose parts 17 monitoring system, no, sir. But I think I need to say 18 that the monitoring - we believe the monitoring will 19 detect dryer degradation long before we generate a 20 loose part. Because part of the industry experience 21 is loose part, if you are going to have a failure 22 that's going to generate loose parts, it happens 23 relatively quickly after you change operating 24 efficiency, as demonstrated by Quad Cities where they 25 increased their flow rates from high power in the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1295 1 course of three or four months they had failures.
2 We have right now over two years of 3 operation, and we'll have an inspection in October.
4 We haven't had any degradation as a result of our 5 increase.
6 JUDGE REED: There are several points I 7 would like to follow up on.-
8 What is your statement that you believe 9 your monitoring system can detect a potential failure 10 of the dryer, not - before loose parts are generated.
11 Did I hear that correctly?
12 MR. HOFFMAN: The monitoring program, 13 checking for the parameter that we monitor, will be 14 able to determine the development of dryer 15 degradation. And we do not believe that if that 16 degradation started to develop that it would progress 17 rapidly such that we cannot - that we won't be able to 18 detect and respond prior to the generation of a loose 19 part.
20 JUDGE REED: So what do you mean by dryer 21 degradation?
22 MR. HOFFMAN: Perhaps a crack developing, 23 a crack developing that's allowing some bypass flow 24 out of the dryer.
25 JUDGE REED: My mental picture of a crack NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1296 1 is a pretty small thing. It might be quite long; it 2 might be fairly deep; but it's microscopic in width.
3 Is that an erroneous idea of a crack?
4 MR. HOFFMAN: It could be. It could also -
5 and those would not challenge the integrity of the 6 dryer. But if you saw - if a crack were to progress 7 and perhaps for a better word fish mouth, start to 8 separate a little bit where flow bypass through it, 9 that's when you would see the change in those plan 10 parameters.
11 JUDGE REED: That's not really a crack.
12 That's a hole, isn't it? I mean what - when you say 13 a crack, to me - you're assuming this crack has opened 14 up significantly, a matter of inches?
15 MR. HOFFMAN: Or it could be a fraction of 16 an inch, enough to result in a bypass flow.
17 JUDGE REED: A fraction of an inch? And is 18 it your position - what - let's talk about sizes. How 19 big could this postulated crack be that you could 20 detect? Length? It's presumably all the way through 21 the metal.
22 MR. HOFFMAN: The study hasn't done - so 23 far we are looking at several inches of crack length -
24 25 JUDGE REED: Of length?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrcross.com
1297 1 MR. HOF.FMAN: And not even challenging the 2 integrity of the dryer.
3 JUDGE REED: Yes. But how wide would the 4 crack be? It'd be completely through whatever metal 5 structure we are talking about, the crack would have 6 to, in order to detect it, it would have to penetrate 7 completely through the metal.
8 MR. HOFFMAN: It would penetrate through; 9 that's right, sir.
10 JUDGE REED: So it's a full penetration 11 crack, several inches in length, and how wide?
12 MR. HOFFMAN: It could open a small 13 fraction of an inch, enough to allow the flow to start 14 bypassing the dryer and leak out through that crack, 15 that indication.
16 JUDGE REED: And it is your belief that a 17 fraction of an inch by a few inches long, that you 18 could detect a crack of that size and shut the plant 19 down before a part - a piece of the dryer comes loose?
20 MR. HOFFMAN: What I'm saying is that if 21 that started to develop, because we know we don't have 22 high-cycle fatigue, it would not progress rapidly 23 beyond that point where a failure would develop before 24 we could shut the plant down.
25 It would be a situation that slowly NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1298 1 developed; it would not be a rapidly propagating 2 failure, because we don't have - by the demonstration 3 of our successful operation so far, we don't have the 4 driving forces to cause that high-cycle fatigue.
5 JUDGE REED: So if you did have high-cycle 6 fatigue, and this crack developed, your point is that 7 you would proceed rapidly to failure.
8 MR. HOFFMANl: We would have seen that very 9 early. If the change in operating conditions due to 10 power uprate is going to result in a high-cycle 11 fatigue failure, we would have seen that already, 12 because we have far exceeded the number in the cycle.
13 JUDGE REED: Okay, so your belief, you are 14 ruling out high-cycle fatigue, as any consideration in 15 your dryer maintenance program? You've ruled that out 16 from consideration, is that what I'm hearing?
17 MR. HOFFMAN: The monitoring program simply 18 monitors dryer performance during operation coupled 19 with inspections looking for any cracking or 20 degradation that might develop.
21 JUDGE REED: I thought I heard you say that 22 you believe it's impossible to have high-cycle fatigue 23 cracking on this dryer?
24 MR. HOFFMAN: We don't believe we will have 25 high-cycle fatigue cracking in the dryer; that's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1299 1 correct, sir.
2 JUDGE REED: And so your programs for 3 monitoring the dryer have to do with what kind of 4 cracking?
5 MR. HOFFMAN: The cracking we've seen so 6 far hasý been typically IGSCC cracking that has not 7 grown very much. It's been either stable, or - Mr.
8 Lukens could discuss the inspection results better 9 than I could - but the cracks that we have seen from 10 one cycle to the next essentially have not changed 11 length, and where new cracks have been developed 12 during an operating cycle, they have been very small.
13 So we are not seeing the development of large cracks 14 during operating cycle.
15 JUDGE WARDWELL: Can I rephrase it that may 16 help you? To make sure I understand.
17 Your monitoring program is looking at 18 operational. parameters would indicate some type of 19 breach in the steam dryer, i.e. an opening, a bypass, 20 something of that nature, regardless of how it took 21 place. So it's not focused toward any mechanism that 22 causes that bypass or opening to occur, but is there 23 to observe the opening or the bypass, the effects of 24 the opening or the bypass.
25 MR. HOFFMAN: That's correct, sir; results-NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross~com
1300 i driven and not cause-driven.
2 JUDGE WARDWELL: So whether it's high cycle 3 or low cycle or just so accidentally during a shut 4 down punched a hole in it because - whatever reason, 5 it wouldn't matter, because your monitoring parameters 6 are intended to detect just a breach or a bypass?
7 MR. HOFFMAN: Right.
8 JUDGE WARDWELL: How would, how big - and 9 I think this is part of what Judge Reed was trying to 10 get to, and I want to get back to it, what is your 11 normal moisture carry-over reading during routine 12 operations, what is the value of that?
13 MR. HOFFMAN: If I may sir?
14 JUDGE WARDWELL: Yes.
15 MR. HOFFMAN: This morning it was 0.137 16 percent.
17 JUDGE WARDWELL: 0.137 percent? How big an 18 opening would you need to increase that? It seems to 19 me it would be fairly big, considering you have so 20 much mass of dry steam coming out, and you've got - if 21 you had just a small crack sitting at one location fo 22 one vein, and yes, that's bypassing, but there is an 23 awful lot of other stuff that is going through-that 24 dryer that ain't getting through that little opening 25 that it would be hard to change that parameter much.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1301 1 What indications do you have that i~t is-2 sensitive enough parameter to detect- the smaller 3 cracks so that you can anticipate taking some action 4 before the steam dryer actually creates loose parts?
5 Either oaf you.
6 MR. HOFFMAN: The way I would answer that 7 is that if we had a flaw developing, all our 8 inspections show that the flaws developed very slowly.
9 So if it got to a point where we saw a change in plant 10 performance due to a potential degradation of the 11 steam dryer, and we concluded that the change in say 12 moisture carry-over level was caused by a potential 13 degradation of the dryer, it would not progress to the 14 point of failure in the very short time it would take 15 to shut the plant down.
16 JUDGE WARDWELL: So another way to 17 interpret what you just said to me, and correct me if 18 I'm wrong in using this interpretation, that the 19 moisture carry-over may not show anything until you 20 have quite a bit larger crack or a larger number of 21 cracks at present, b~ut the smaller cracks that 22 wouldn't be sufficient size to impact moisture carry-23 over would be detected during inspections based on 24 what you ascertain or believe to be the low 25 propagation of those cracks.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1302 1 MR. HOFFMAN: Yes,. sir.
2 JUDGE WARDWELL: What is your basis for 3 assuming that those cracks propagate slowly?
4 MR. HOFFMAN: Demonstration by having 5 repeated inspections of the same indications and not 6 seeing any - in some cases zero change in length.
7 JUDGE WARDWELL: I've had a crack in the 8 windshield of my car that started off as a little rock 9 ding, and nothing happened until about two months into 10 it, and then it started going, and then it started 11 going fast. So it went many months doing nothing, and 12 then all of a sudden it started propagating like 13 crazy.
14 Couldn't that same behavior occur?
15 MR. HOFFMAN: No, sir, the material in the 16 windshield is a non-ductile material; it's a brittle 17 material; it can be subject as you said, as I have had 18 the same unfortunate experiences, very quickly fast-19 running flaws. Austenitic stainless steel is a very 20 ductile material, and you just do not get brittle 21 fracture fast-running flaws in stainless steel. It's 22 an extremely ductile material; very very ductile 23 material.
24 JUDGE WARDWELL: Thank you.
25 JUDGE REED: I still - oh, I'm sorry, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(2021 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1303 1 please, you've been trying to ask a question.
2 JUDGE KARLIN: I may be interrupting this, 3 but if I could refer you to testimony, it helps me 4 understand where we are. Page 11 again of your dryer 5 managemen t monitoring program. I am positing there is 6 an inspection program every time there is a refueling 7 outage, and there is monitoring that goes on 8 continuously.
9 And here you are describing - and you say, 10 and I quote, the status of the steam dryer is assessed 11 continuously by the plant operators, and then you go 12 on to say, the following events could be - through the 13 monitoring of certain plant parameters. And the 14 following events could be indicative of significant 15 dryer damage, quote: A, sudden drop in main steam line 16 flow of greater than 5 percent; B, sudden drop in 17 steam dome pressure greater than two psig, pounds per 18 square - gauge.
19 And C, sudden drop in steam dome pressure 20 greater than ps - I guess, did I miss one in there?
21 MR. HOFFMAN: Yes, the bravo three.
22 JUDGE KARLIN: Yes, bravo, B, greater than 23 three-inch difference in reactor vessel water 24 instrument - water level instruments. So that is your 25 continuous monitoring, right? Those are the three NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1304 1 parameters that you are continuously monitoring?
2 MR. HOFFMAN: Yes, sir.
3 JUDGE KARLIN: And that is the monitoring 4 program, or at least part of it, that you are talking 5 about, right?
6 MR. HOFFMAN: Yes, sir.
7 JUDGE KARLIN: And then the next sentence, 8 quote: in addition, periodic measurements of moisture 9 carry-over are performed, and changes in moisture 10 carry-over are evaluated per - and it quotes SIL 644, 11 closed quote, right?
12 MR. HOFFMAN: Yes.
13 JUDGE KARLIN: I'm with you. So first 14 there are three parameters that are continuously 15 monitored, right?
16 MR. HOFFMAN: Yes, sir.
17 JUDGE KARLIN: And another parameter, 18 moisture carry-over, is periodically monitored, right?
19 MR. HOFFMAN: Yes, sir.
20 JUDGE KARLIN: And periodically, if I think 21 I remember somewhere, it's twice a day? How often is 22 the moisture carry-over periodic monitoring?
23 MR. HOFFMAN: Now it's weekly.
24 JUDGE KARLIN: Once a week?
25 MR. HOFFMAN: Once a week.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1305 1 JUDGE KARLIN: Okay, and so those are - and 2 that is the plan going forward, aging management 3 program, to do it once a week?
4 MR. HOFFMAN: Yes, sir.
5 JUDGE KARLIN: Okay, once a week, and that 6 is the monitoring program. And I guess - let me ask 7 this on the continuous monitoring of those A-, B an -d C 8 parameters, are those parameters just automatically 9 normally measured, monitored in a reactor? Or are 10 they being especially monitored because of the aging 11 management program?
12 MR. HOFFMAN: The parameters themselves are 13 monitored normally. What we are looking for in the 14 aging management program is anomalies.
15 JUDGE KARLIN: Okay, so that stuff is 16 monitored anyway. And how about the moisture carry-17 over, is that monitored anyway, or is it only 18 monitored because of this aging management program?
19 MR. HOFFMAN: I don't know the answer to 20 that, but it was done previously. I know it's done 21 now weekly.
22 MR. LUKENS: We perform moisture carry-over 23 measurements prior to uprate. However the frequency 24 was increased shortly before we went to uprate 25 conditions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1306 1 JUDGE KARLIN: Okay. So the only thing 2 different you are doing is, your moisture carry-over 3 is more frequently being monitored, and someone is 4 paying attention to these values, and there are some 5 action levels if they exceed the three or the five or 6 whatever; correct?
7 MR. HOFFMAN: Yes, sir.
8 JUDGE KARLIN: Now on page 16 - I'm sorry, 9 1 believe it is 14 of your testimony, in question #30, 10 here you talk about that.
11 Question: What happens if abnormal values 12 are measured?
13 And then you describe certain - if any of 14 the action levels are reached, procedure requires a 15 moisture carry-over. So if any of these action levels 16 that meets with a continuum, what do you do? First 17 thing you do, are you saying you got to go do a 18 moisture carry-over measurement?
19 MR. HOFFMAN: Yes.
20 JUDGE KARLIN: So that's the first thing.
21 And then what happens after that? The personnel 22 involved - quote, the personnel involved in 23 determining the significance of the moisture carry-24 over and other measured parameters are - apparently 25 you have someone who makes a judgment call at that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neairgross.com
1307 1 point?
2 MR. HOFFMAN: If you saw a change in the 3 monitored parameters, the first step would be, get a 4 moisture carry-over measurement. If that had changed 5 above normal, which would then be indicative of 6 potential dryer failure, there are action levels in 7 that procedure, ON-3178, that I spoke about, which 8 would involve reporting to plant management; getting 9 the engineering personnel involved; and starting an 10 evaluation of what was going on to determine if the 11 monitoring parameters, which can change for other 12 reasons, were being caused to change by a potential 13 dryer failure.
14 JUDGE KARLIN: Okay, I'm with you. And 15 you've got the three continuously monitored 16 parameters, which are normally monitored anyway, then 17 you have moisture carry-over that is periodically -
18 and we have been talking about cracks and the size of 19 cracks and two inches and what they are. But what you 20 are looking at is these four parameters as it were, 21 three parameters plus moisture carry-over, and then a 22 judgment call is made if there is some change in those 23 above these thresholds, somebody has to make a 24 judgment call whether that involves a problem with the 25 steam dryer.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C_ 20005-3701 www.nealrqross.com
1308 1 MR. HOFFMAN: A technical evaluation would 2 be multiple people getting involved, and assessing the 3 data and making a technical determination, is this 4 indicative of a dryer failure?
5 JUDGE.-KARLIN: Now are there other things 6 going on in a nuclear power plant that could also 7 cause these parameters to change, these values to 8 change, say, a sudden drop in main steam line flow 9 over 5 percent?
10 MR. HOFFMAN: It could be, and that's why 11 the party evaluation is something else potentially 12 causing that problem or that change.
13 JUDGE KARLIN: And a greater than three-14 inch difference in reactor water - vessel water level, 15 I mean that could be caused by a lot of things, 16 couldn't it?
17 MR. HOFFMAN: It might be, yes.
18 JUDGE KARLIN: So the parameters being 19 measured, the changes in them could be caused by a lot 20 of different things that are going on in a nuclear 21 power plant, correct?
22 MR. HOFFMAN: There could be other things 23 than a dryer failure causing changes in those 24 parameters, and that's what the evaluation -
25 JUDGE KARLIN: Could be a lot of other NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1309 1 things? Is that correct?
2 MR. HOFFMAN: I wouldn't quantify a lot or 3 a little, but it could be.
4 JUDGE KARLIN: All right. And so someone 5 -. has to make a judgment call at that point. Parameters 6 are exceeded, first thing you do is do a moisture 7 carry-over analysis. The moisture carry-over 8 analysis, and the parameters have been taken to some 9 group of people who make a decision as to whether this 10 indicates a problem with the steam dryer or a problem 11 somewhere else, or whatever, and it's a judgment call, 12 okay, but it's not like somebody has got a periscope 13 and is looking into the steam dryer and sees a crack 14 that is two inches long.
15 MR. HOFFMAN: Not at that point, no, sir.
16 JUDGE KARLIN: Okay. And I think.a lot of 17 the questions here are the same question I have is, 18 what are the resolution power of these parameters, the 19 measurements you are taking? To what degree is 20 judgment involved in - it's not like you have a 21 microscope. How much can you see? Is it a two-inch 22 crack? A one-inch crack? A ten-foot crack? What are 23 you seeing?
24 You are seeing - what causes - what in the 25 steam dryer other than a crack might cause this?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1310 1 Could the thing bend and cause a problem, or is that -
2 change in one of these parameters?
3 MR. HOFFMAN: I think it's the other way 4 around. Changes in power level, changes in say 5 feedwater temperature could affect one or more of 6 those parameters, perhaps moisture carry-over. So it 7 could be other plant parameter changes that are 8 causing - or plant operating changes that are causing 9 changes in those parameters, and that's what that 10 technical evaluation would sort out.
11 JUDGE KARLIN: Okay.
12 JUDGE WARDWELL: Let me add another 13 question on - along these lines, but worded a little 14 bit different way. In order to see - if it was - if 15 the steam dryer was cracked, due to vibration fatigue, 16 in a number of places, wouldn't it take quite a large 17 crack to see any steam flow drop of 5 percent, greater 18 than three-inch difference in reactor vessel water 19 level measurement, and a drop of two psi in the dome 20 pressure core?
21 MR. HOFFMAN: It potentially would. Yes, 22 sir, it potentially would. And I think that's where 23 our program is - because we don't have high-cycle 24 fatigue - the whole problem in the industry arose from 25 some initial plans that had some high-cycle fatigue NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1311 1 failures. And they saw changes in parameters.
2 So what the industry has done is said, 3 these folks had problems. They saw changes in these 4 parameters. Other people should look for those 5 similar changes in parameters as a precursor to 6 potential problems.
7 JUDGE REED: Once again, you've said you 8 don't have high-cycle fatigue. And I just want to 9 make sure I understand the basis on which you make 10 that claim. And I believe there are two things.
11 One is your analysis prior to the power 12 uprate, and the second thing is simply the fact that 13 you have uprated for, what, approximately three years 14 now, at the higher power and seen no failure? Is that 15 16 MR. HOFFMAN: It's really the second one.
17 JUDGE REED: It's really the second one?
18 MR. HOFFMAN: We never do this, and you 19 could conceivably - we could have built a component 20 and never analyzed it and simply operate it, and 21 operate it beyond a certain level without a failure 22 you would conclude without any knowledge of what the 23 stresses were that it was not subject to high-cycle 24 fatigue.
25 JUDGE REED: So since it hasn't broken, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1312 1 it's not going to break?
2 MR. HOFFMAN: That is essentially - hicrh-3 cycle fatigue -
4 JUDGE KARLIN: Yes, i agree, but let me 5 ask: Is your program trying to predict whether it's 6 going to break or detect whether it's broken?
7 MR. HOFFMAN: The monitoring program is a -
8 the in-service monitoring would be after the fact.
9 JUDGE KARLIN: Right, and so on page 15 of 10 your testimony, in answer to question #33, you say, 11 the question is, will the measurements of moisture, et 12 cetera, et cetera, for reactor, enable Entergy to 13 determine whether a dryer crack is about to form?
14 And you say, no. The purpose of the 15 measurements is to provide early warning that a crack 16 may have developed. You are not trying to predict a 17 crack; just trying to detect one that's occurred.
18 MR. HOFFMAN: Detect one that's occurred, 19 and that has resulted in a change in dryer -
20 JUDGE KARLIN: Because. a steam dryer is 21 not a safety component of the reactor, correct?
22 MR. HOFFMAN: That's correct.
23 JUDGE KARLIN: And the problem is not 24 whether a steam dryer fails, because that is not a 25 safety-related component of the reactor, but whether NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1313 1 a steam dryer failure, that is, a piece from the steam 2 dryer, -could cause a failure somewhere else on the 3 system; right?
4 MR. HOFFMAN: Yes, sir.
5 JUDGE WARDWELL: And a crack, a single 6 crack, wouldn't cause -it may be a failure of the 7 steam dryer, it doesn't have an impact on anything 8 else until it's large enough so it creates a loose 9 part?
10 MR. HOFFMAN: Yes, sir.
11 JUDGE WARDWELL: And you are also relying 12 on the slow propagation of cracks that do occur as 13 part of your plan in order to catch those during the 14 visual inspections that occur at selected refueling 15 outages?
16 MR. HOFFMAN: That's correct. If we do it 17 on high-cycle fatigue, it'd be a slow development of 18 any flaws.
19 JUDGE WARDWELL: But it wouldn't if it was 20 a high cycle?
21 MR. HOFFMAN: Yes.
22 JUDGE REED: Dr. Hopenfeld, do you agree 23 with Entergy's position that we can rule out fatigue 24 failure of the dryer on the basis that since they've 25 operated for an extended period of time at the 20 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1314 1 percent increased power, that we would have seen this 2 failure if it was going to occur?
3 DR. HOPENFELD: No, because the only way 4, you can show that would be by calculations, just by 5 the calculations we discussed yesterday. You-.would 6 have to show that you are not - where are you as far 7 as routine endurance. And the only way you can do 8 that if you knew what the loads on the dryers were.
9 This is just - this is an opinion, a 10 judgment of somebody, that 18 months is sufficient to 11 conclude that nothing will happen in the future.
12 If this was the correct situation, if this
.13 was a correct statement, then all the reactors in the 14 country would have been - we would have never seen any 15 failure from fatigue, from flow-induced vibration, 16 from any system after they operated for 18 months.
17 And I realize that I am a little bit vague 18 here, because each system is different. They may have 19 something that causes the vibration to change. But 20 the Vermont Yankee is not an operating room in a 21 hospital. Things change there, too.
22 JUDGE KARLIN: Can I ask a question, Dr.
23 Hopenfeld? I'd like to put a little different facet 24 on the question Dr. Reed was asking.
25 As I understand it, Entergy's position is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1315 1 a steam dryer is not a safety-related component. Over 2 the next 20 years there may - they are not saying that 3 there will never be a chunk or a piece of metal come 4 off the steam dryer. Let's assume there is. I think 5 they are not guaranteeing that it will never happen.
6 What I think they are saying is, look, we are going to 7 monitor it. We are going to monitor these parameters.
8 We are going to inspect it every 18 months visually.
9 And if a chunk falls off, we will detect it pretty 10 fast, and we will be able to manage it in a way that 11 no safety.problem will arise.
12 Now there is a debate whether a safety 13 program will arrive, but they are not trying to say 14 there will never be a chunk come off. They are just 15 saying, if it happens, we'll catch it and we'll deal 16 with it. Isn't that right?
17 DR. HOPENFELD: That's exactly what they 18 are saying. There are two things that are important.
19 There's the situation where you have a crack and it 20 hasn't gone through the wall. A bunch of cracks; they 21 haven't gone through the wall. They may be let's say 22 five mils from breaching the wall.
23 In the case of sudden large change in 24 forces on the dryer because of the DBA. And mind you, 25 DBA, it's not a hypothetical place. This is not a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1316 1 severe accident. This is something that, it's part of 2 the what the COB, they are responsible for that. They 3 have to show you that what this event in the dryer, 4 this formation of the crack, would extend the DBA.
5 It's part of DVC 40 and 42, which requires you to 6 provide protection to the public against events like 7 that. And I haven't seen anything -
8 JUDGE REED: Can we stop there, and ask the 9 NRC staff to verify your statement? Is it your belief 10 that the claim that Dr. Hopenfeld just made is 11 correct?
12 MR. SCARBROUGH: They are required to 13 evaluate the dryer for all possible floats, and local 14 loads and such as that.
15 JUDGE REED: Including design-basis 16 accidents.
17 MR. SCARBROUGH: Right, yes, sir. And they 18 did that as far as power uprate, and they evaluated 19 it. And the loads for - well, the allowable loads are 20 different for those types of situation. You are 21 allowed to have some structural deformation of the 22 dryer, because if you have a LOCA you are shutting the 23 plant down. It's not a long term fatigue oriented 24 level that you are looking for in normal operations.
25 So they did look. They did an evaluation. The NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1317 1 technical staff looked at that, and determined that 2 the allowable loads were adequate for that dryer.
3 JUDGE REED: So basically you are saying if 4 you have a LOCA, the dryers are the least of your 5 worries; it's not something you are concerned about?
6 MR. SCARBROUGH: Yes, sir.
7 JUDGE KARLIN: But I thought Dr.
8 Hopenfeld's point is, but if you have a LOCA and that 9 triggers a steam dryer, chunks of metal coming off the 10 steam dryer, I won't call it a total failure, LOCA 11 occurs, steam dryer has a failure, chunks come off.
12 Does that exacerbate the problem, the LOCA then? And 13 doesn't that have to be - isn't that something that 14 would have to be considered and dealt with?
15 MR. SCARBROUGH: If those chunks came out 16 they would be heading out the same hole that all the 17 steam would be heading out for the LOCA anyway. I 18 mean you are losing - that is the direct path out of 19 the -
20 JUDGE KARLIN: Has that been considered by 21 the applicant and the staff? I mean deciding that the 22 steam dryer is okay the way it is?
23 MR. SCARBROUGH: I don't know if they have 24 evaluated that specifically in terms of - their 25 evaluation was where the stresses are so high that you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1318 1 would exceed the allowable limits of the dryer. in 2 terms of looking at it beyond that, that is something 3 that the BWR VIP has looked at.
4 JUDGE KARLIN: You are focusing on the EPU, 5 right?
6 MR. SCARBROUGH: Yes, sir.
7 JUDGE KARLIN: Okay, so Mr. Hsu, were you 8 the one who looked at this for renewal?
9 MR. HSU: Yes, we looked for the renewal.
10 But from the renewal point of view. We are now 11 looking at an engineering point of view, and we are 12 looking at monitoring, the monitoring and detection, 13 that point of view; not look from the engineering 14 point of view.
15 JUDGE KARLIN: So if I may, you did not 16 look at, well, if there is a LOCA, and the LOCA causes 17 the steam dryer to break pieces off, -and those pieces 18 could exacerbate the LOCA and cause different 19 problems, you did not look at that?
20 MR. HSU: We did not look at that. We only 21 look at that because of this detection and worry that 22 it's the best. Normally it's not going to happen.
23 JUDGE KARLIN: So you are saying - no, I'm 24 not sure, I don't think there is a guarantee it isn't 25 going to happen. I thought it was, they are not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgiross.com
1319 1 evaluating prediction. They are just going to detect 2 it if it does happen, right? Is this right, Mr.
3 Hoffman? I mean the monitoring program is not to 4 predict what's going to happen but to detect if a 5 chunk has come off?
6 MR. HOFFMAN: The monitoring program will 7 not - cannot predict that a crack may develop to 8 start. It is there to determine if a degradation has 9 occurred that challenges dryer integrity, in which 10 case we would shut the plant down and take corrective 11 action, so that way.
12 JUDGE KARLIN: Thank you.
13 Now, Mr. Hsu, are you saying you8r 14 acceptance of this was based on some understanding 15 that the monitoring program would prevent any of these 16 things from happening?
17 MR. HSU: The monitoring program would 18 detect -
19 JUDGE KARLIN: Detect.
20 MR. HSU: - and give you the early warning 21 before these things happen, because a crack -
22 JUDGE KARLIN: Well, wait a second. Does 23 the monitoring program detect before a chunk comes 24 off? Or does it detect that in fact a chunk has come 25 off?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1320 1 MR. HSU: Before.
2 JUDGE KARLIN: Now I'm asking Mr. Hoffman, 3 or that a crack has developed or a hole -
4 MR. HOFFMAN: You are not - it could be 5 both, sir, in the sense that you have a spectrum of 6 events. It could be a small piece has come out that 7 results in a moisture carry-over of a certain failure.
8 Or it could be a contiguous flaw that has opened up a 9 little bit and allowed some bypass flow. So it will 10 not differentiate.
11 JUDGE KARLIN: Okay, let me ask - that is 12 that's a question. You talked about, I asked you 13 about the changes in the main steam line f low and the 14 difference in the water level. what if it's slow?
15 Over what timeframe does this change occur, that it 16 triggers this action? I mean if the sudden - you have 17 a sudden drop in the main steam line flow of greater 18 than 5 percent. Define sudden.
19 MR. HOFFMAN: The operators are 20 continuously scanning the control panel, so we are 21 talking minutes. They may have looked at the 22 instrument, then a couple of minutes later they check 23 it -
24 JUDGE KARLIN: So if it - and -- because 25 I'm concerned about the difference between creeping NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-370 1 www~neafrgross~com
1321 1 change of little pieces start falling off, and because 2 they are small they are not detected until some big 3 chunk finally - the dam breaks or something.
4 Is this going to distinguish - if there 5 was gradual breaking off of pieces, would there be a 6, sudden drop in the main steam line flow, would that 7 pick it up? Or would you miss a gradual increase 8 resulting from problems with the steam dryer?
9 MR. HOFFMAN: Once again, I don't think -
10 we don't conclude that there is going to be a gradual 11 breaking off of pieces, because those would be driven 12 by high-cycle fatigue failures, which we don't have.
13 We don't have a high-cycle fatigue situation.
14 JUDGE KARLIN: Yes, but this program is not 15 telling us that it is never going to happen. I 16 thought. you were saying, we're not telling you it 17 ain't going to happen. We're just saying if it 18 happens we are going to detect it.
19 MR. HOFFMAN: If it happens the program 20 would detect it, but implicit in that is that we don't 21 believe it's going to happen.
22 So I guess it's hard to answer the 23 question in that the parameters -
24 JUDGE KARLIN: Well, if we didn't think 25 anything was going to happen then we wouldn't have to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1322 1 monitor any of these things. If that was all we 2 needed, the EPU is granted, everything is fine, no 3 monitoring program, because it ain't going to happen.
4 But you are monitoring it, and you are 5 managing it, and this is part of your. plan. So I'm 6 positing that you are doing it for a reason, because 7 you believe, you want to be careful, and if it happens 8 you will detect it.
9 But I guess what you are saying is, your 10 detection program is focused not on the high - what 11 was the word?
12 MR. HOFFMAN: High cycle.
13 JUDGE KARLIN: Not on the high-cycle 14 fatigue but on the low-cycle fatigue type of problem.
15 MR. HOFFMAN: Which would happen very 16 slowly.
17 JUDGE KARLIN: I'm sorry, somewhat of a 18 digression, but thank you. ;
19 DR. HOPENFELD: I would like to comment on 20 that, because I really -
21 JUDGE REED: I want to ask you a question, 22 Dr. Hopenfeld.
23 DR. HOPENFELD: I didn't finish answering 24 the first one.
25 JUDGE KARLIN: Are you satisfied?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12021 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1323 1 JUDGE REED: Well, I'm going to ask you a 2 follow up.
3 DR. HOPENFELD: I had- two parts to my 4 answer to the question. And I started with the first 5 one. I said the crack will go through the wall.
6 Monitoring is irrelevant. Suddenly, we're talking 7 about monitoring. That's not what monitoring. In 8 effect, monitoring -
9 JUDGE WARDWELL: Can I stop you for a 10 minute?
11 DR. HOPENFELD: Yes.
12 JUDGE WARDWELL: What question are you 13 answering?
14 DR. HOPENFELD: I was answering a question 15 about commenting - I was asked I should comment about 16 -the monitoring program, and their perception about the 17 stresses. That's what I was answering.
18 JUDGE REED: I want to ask you a very 19 specific question. Earlier you made a point that I 20 would like to follow up on, which is you believe that 21 if we could rule out - let's see if I can state this 22 carefully - Entergy has asserted that they can 23 eliminate high-cycle fatigue as a cause for cracking.
24 You made a statement that you disagreed 25 with that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1324 1 DR. HOPENFELD: Correct.
2 JUDGE REED: And you gave a reason for 3 that?
4 DR. HOPENFELD: Correct.
5 JUDGE REED: And I'm- going to try to 6 paraphrase your reason. I think it was that if that 7 were the case, then we would never have seen a high-8 cycle fatigue cracking of a dryer beyond a few months 9 of operation being your point. Did you make that 10 statement?
11 DR. HOPENFELD: (No audible response.)
12 JUDGE REED: Pardon me?
13 DR. HOPENFELD: I said 18 months.
14 JUDGE REED: Eighteen months. So you did 15 make that statement?
16 DR. HOPENFELD: Yes, I said in all the 17 plants.
18 JUDGE REED: So can you cite for us an 19 example of a dryer that cracked beyond 18 months as a 20 result of high-cycle fatigue?
21 DR. HOPENFELD: Sir, I wasn't talking 22 specifically about dryers. I was more general. I 23 said you wouldn't see flow-induced vibration wouldn't 24 be a problem anywhere. Because if he's constant 25 there, what he was alluding, not just the dryers, he NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1325 1 said, we don't see - what he was saying, as I 2 understood him, he said, we don't see something happen 3 up to 18 months it's never going to happen. That 4 really is not specific-to the dryer; it's specific to 5 anything.
6 JUDGE WARDWELL: So can you cite any 7 examples where there have been failures at a given 8 power level several years after the initiation fo that 9 power level due to vibration -
10 DR. HOPENFELD: There have been many 11 failures due to vibration in various parts of the 12 system. I know there have been failures in BWR steam 13 generators. I am talking generally.
14 JUDGE WARDWELL: It does have something to 15 do with it, because Vermont Yankee is a BWR.
16 DR. HOPENFELD: No, I understand, but what 17 I'm talking about -
18 JUDGE WARDWELL: I'm asking you do you 19 know, can you cite any examples of failures of 20 components due to vibration fatigue, high-cycle 21 loadings, several years after a given power level has 22 been initiated?
23 DR. HOPENFELD: In BWRs?
24 JUDGE WARDWELL: In BWRs.
25 DR. HOPENFELD: I think there was some, but NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1326 1 I don't remember. I think there was some at least 2 tell me where the feedwater nozzle were, but I don't 3 remember the BWR. In this case I was just talking in 4 general.
5 - JUDGE REED: Let's ask the other witnesses 6 the same question. Are you aware of any circumstances 7 in which a component has failed due to fatigue beyond 8 18 months following a change in plant conditions?
9 MR. SCARBROUGH: Now for the Quad Cities 10 plants, we talked about those. They happened very 11 quickly.
12 JUDGE REED: I'm sorry, what?
13 MR. SCARBROUGH: For Quad Cities Unit #1 14 and #2, Quad Cities #2, first failure was like 90 days 15 after it first went up to the EPU, changed power 16 levels; and then it failed again, and then about a 17 year later. So about a year operations for Quad 18 Cities #1 in November of 2003, it failed.
19 And the sister plants for Quad Cities -
20 JUDGE REED: So there is an example of one 21 year.
22 MR. SCARBROUGH: One year, yes, sir.
23 JUDGE REED: One year. But we haven't 24 gotten as far as 18 months.
25 MR. SCARBROUGH: In Dresden it was along NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1327 1 that line. I wouldn't say a year or 18 months, but it 2 was a longer time period. They had actually been 3 trying to install modifications to the dryer to try to 4 strengthen it, and what they found was, when they went 5 in. and did inspections, because the Quad Cities had 6 failed, they went back and looked at those 7 modifications they had performed for Dresden, and they 8 found some cracks where they had put those 9 modifications in.
10 So what they found was the modifications 11 were not helping too much. So they ended up replacing 12 the dryers at Dresden as well just to deal with the 13 issue and get it over with.
14 So that was - if you are looking for 15 something that was a little bit longer, Dresden was a 16 little bit longer timeframe than Quad Cities, but the 17 loading was different, and they ended up putting the 18 modifications in to try to correct it and actually 19 found the modifications weren't -
20 JUDGE REED: In the Dresden case was it 21 attributed to this high-cycle fatigue?
22 MR. SCARBROUGH: Yes, sir, it was the same 23 phenomenon that happened at Quad Cities where there 24 was acoustic resonance that was upstream from the 25 relief valves hitting the resonance and hitting the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1328 1 dryer. And Quad Cities and Dresden are almost 2 identical plants in how they are designed, and so they 3 ended up - it's natural that they would have similar 4 issues going on. Dresden has a slight different 5 variations of how the branch lines were connected. It 6 ended up their loads were occurring at a lower power 7 level, the resonances were occurring at a lower power 8 level, and so the levels were not as high.
9 But the net result is, they did fail as 10 well. So those are the two plants, the two separate 11 plants, Quad Cities #1 and #2, Dresden #2 and #3, that 12 had this phenomenon. But those are the only ones that 13 I know of where there was this longer timeframe 14 involved.
15 There were places when plants first 16 started up years ago like Susquehanna where there were 17 small cracks that they found in the dryer as they 18 started the plants up.
19 JUDGE WARDWELL: Can you explain the 20 mechanism again of how Dresden and Quad Cities failed?
21 You said it, and you said it fast.
22 MR. SCARBROUGH: The steam lines - the 23 flows in fact put forth for this case, there are 24 various mechanisms that can occur and cause 25 vibrations. But the mechanisms that were the severe NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1329 1 mechanisms for Dresden and Quad Cities, the ones that 2 we're most concerned about, are where you have steam 3 flow down the line after the branch opening for a 4 relief valve, for a branch line, or something. When 5 it passes over that there will be vortices shed across 6 that branch opening. And when that vortices matches 7 the standing wave for - you may get an acoustic 8 resonance, get a reinforcement. And that will travel 9 back upstream through, and then strike the face of the 10 dryer. The face of the dryer is facing that main 11 steam line opening, and travels up and strikes that.
12 And that was what was obvious at Quad Cities when they 13 instrumented the steam lines. You could see that at 14 Dresden, as well when they implemented the replacement 15 dryers at Quad Cities, one of them was instrumented to 16 see actually what was happening. And that confirmed 17 what we were seeing downstream.
18 JUDGE REED: Was there a calculation done 19 to confirm that the vibrational frequency of the dryer 20 component that broke was essentially the same as - was 21 it in resonance with this acoustic -
22 MR. SCARBROUGH: My understanding was, the 23 forces coming back were just so high they exceeded the 24 fatigue limit. So when they did the calculations they 25 saw, that yes, it should fail, and it did fail, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1330 1 because those forces striking the dryer were above the 2 fatigue limit so it was a very high cycle. It happened 3 very quickly.
4 JUDGE REED: so it didn't really need to be 5 in resonance you are saying.
6 MR. SCARBROUGH: No, sir.
7 JUDGE WARDWELL: In fact it's almost like 8 a static, where your high enough cycles that you are-9 it's almost like a static load on, or a continuing 10 load on it.
11 MR. SCARBROUGH: Yes, it was very periodic.
12 JUDGE REED: So Dr. Hopenfeld has 13 postulated a possible resonance effect here. Is it -
14 what is your opinion about that with regard to this 15 particular plant, Vermont Yankee?
16 MR. SCARBROUGH: The steam dryers, as the 17 flow comes out and goes over the steam dryers out the 18 relief lines, or the main steam lines, there are 19 vortices shed across the edges of the dryer as it 20 rolls down. And there is a potential there for 21 resonance to occur with that structure.
22 What we found is, those types of issues 23 are not of concern. The reason concern was this 24 acoustic resonance traveling back upstream. That's 25 where the real heavy loads were.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1331 1 JUDGE KARLIN: The what kind of resonance?
3 JUDGE KARLIN: Acoustic? Okay.
4 MR. SCARBROUGH: And so there is that 5 potential, and that was looked at very closely back 6 when the first failures at Quad Cities occurred.
7 Because the - one of the cover plates that failed was 8 a quarter-inch thick; very thin. It failed off Quad 9 Cities Unit #2. And so there was a lot of discussion 10 of, could it be these vortices coming off, which shed 11 very low frequencies, below 100 Hertz, where these 12 acoustic resonance coming upstream are much higher 13 frequencies.
14 And so there was a lot of discussion of 15 where that was occurring. So that is possible, but 16 the concerns that we have now for this acoustic 17 resonance are the higher frequencies that come from 18 these lines downstream. But that was something that 19 was looked at and was evaluated.
20 At Vermont Yankee they did two types of 21 analyses to evaluate what would happen.
22 JUDGE KARLIN: With regard to the uprate?
23 MR. SCARBROUGH: Yes, sir.
24 JUDGE KARLIN: All right.
25 MR. SCARBROUGH: They did a computation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1332 1 fluid dynamics -
2 (Simultaneous voices) 3 JUDGE REED: But it did take place?
4 JUDGE KARLIN: It took place in fact. If 5 you start - go ahead.
6 JUDGE REED: I thought we were going to 7 listen to why it is important.
8 MR. SCARBROUGH: But they did look at that.
9 That was an area they looked at. But in terms of the 10 concern, the dryers have operated many many years in 11 the power plants without any significant failures that 12 we saw in Quad Cities due to cracking. And the cause 13 of that severe problem was this sort of acoustic 14 resonance that was occurring downstream; a very high 15 frequency that was occurring. And that was the 16 concern.
17 JUDGE REED: And that was - in both cases 18 Quad Cities and Dresden, was caused by a recent 19 uprate?
20 MR. SCARBROUGH: Yes, sir. Both of them 21 occurred in the operating time before that.
22 JUDGE KARLIN: Yes, my colleagues have 23 pointed out that it is lunch time, and this panel has 24 been on this hot seat for over two hours, or about two 25 hours, so I think we ought to give them a break too.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1333 1 So we will take an adjournment until let's 2 say 1:15. We will stand adjourned. Thank you.
- 3. (Whereupon at 12:04 p.m. the proceeding 4 in the above-entitled matter was 5 adjourned until 1:15 p.m.)
6 JUDGE KARLIN: May I remind the witnesses 7 that you're still under path, so recognize that. I 8 think absent anything from the parties at this point, 9 we'll just continue with the questioning related to 10 Contention Three. Dr. Reed.
11 JUDGE REED: Thank you. We find ourselves 12 still a little puzzled about the monitoring program, 13 and what you're able to detect. Would you please 14 confirm your earlier statement that you believe that 15 you can detect -
16 JUDGE KARLIN: And you're addressing this 17 to?
18 JUDGE REED: I'm sorry. This is to Mr.
19 Hoffman. Would you please confirm your earlier 20 statement that you believe that you can detect a crack 21 prior to any major failure of the dryer through your 22 monitoring program.
23 MR. HOFFMAN: Yes. The basis for my 24 statement on that was that we have observed that flaw 25 growth, if it's taking place in the dryer, is very NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
- 1334 1 slow, so that if we have a situation that occurs that 2 results- in a bypass of the dryer through-a defect or 3 something that has begun to develop because the flaw 4 growth rate is slow,- we will have time to evaluate 5 that condition. And if we determine that the change 6 in parameters is due to a dryer degradation, we would 7 be able to shut the plant down before that propagated 8 to a failure.
9 JUDGE REED: Can you be more specific as 10 to the size crack that you believe you can detect?
11 What's the minimum size crack? What's the resolution, 12 I think Judge Karlin put it that way earlier, what's 13 the resolution of this monitoring program in terms of 14 the size crack that you believe you can monitor and 15 detect?
16 MR. HOFFMAN: When you're saying 17 monitoring program, you mean the online monitoring or 18 the inspection part?
19 JUDGE REED: I'm talking about the online 2Q monitoring program.
21 MR. HOFFMAN: I cannot quantify that, sir.
22 JUDGE WARDWELL: Could you roughly guess?
23 Would it be a six inch crack opened up a quarter of an 24 inch, would it be a six foot crack opened up a foot?
25 MR. HOFFMAN: Can't quantify that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neairgross.com
1335 1 JUDGE WARDWELL: Do you believe the 2 parameters that you're monitoring are- sensitive enough 3 to detect a six inch crack opened up a quarter of an 4 inch? One six inch crack opened up a quarter of an 5 inch.
6 MR. HOFFMAN: I could not answer that.
7 JUDGE WARDWELL: You have no feeling on 8 whether it could or couldn't.
9 MR. HOFFMAN: No, sir.
10 JUDGE REED: Could we turn to the NRC, for 11 a moment, Mr. Scarbrough. Do you have any opinion 12 with regard to the ability of a monitoring program -
13 now, we're not talking inspection, but monitoring 14 these plant parameters, the particular parameters that 15 have been laid out in the testimony by Entergy, or 16 sudden drop in main steam line flow, difference in 17 reactor vessel water level instruments, and sudden 18 drop in steam dome pressure, do you believe that those 19 parameters would indicate a crack of the size that Dr.
20 Wardwell just specified?
21 MR. SCARBROUGH: I'm not familiar with the 22 crack size in terms of what -- I know at Quad Cities 23 Unit 1, they had a crack appear, and that was one of 24 the diagrams that's in the SIL 644 where they showed 25 that event, where the crack was rather long, and a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1336 1 couple of inches, I guess, in size. And you could 2 tell from the plant parameters the moisture carried 3 over the changed air and the distribution of flow 4 within the steam lines changed from that. And from 5 that, they were able to recognize they had issues 6 going on and they shut the plant.
7 JUDGE KARLIN: How do you know that? I 8 mean, did you work at Quad Cities, or are you reading a report?
10 MR. SCARBROUGH: No, I was part of the 11 group, when the information came in, because I was 12 assigned to steam dryer program. And so as it came 13 in, we got a report like the Region saying that the 14 parameters were changing, and we got involved, and 15 within a few days they shut the plant down, opened up 16 the -
17 JUDGE KARLIN: So you were part of the NRC 18 team that was involved with the Quad Cities incident.
19 MR. SCARBROUGH: Yes, sir.
20 JUDGE KARLIN: Okay. Great.
21 JUDGE WARDWELL: And what size did you 22 say, again, about?
23 MR. SCARBROUGH: It's -- the diagram is in 24 the 644 25 JUDGE WARDWELL: Yes, I don't need that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1337 1 MR. SCARBROUGH: It looks like it was a 2 couple of inches wide, and several feet long in terms 3 of the length.
4 JUDGE WARDWELL: A couple is like six to 5 eight.
6 MR. SCARBROUGH: Yes. It's hard to tell 7 from the diagram what it exactly was, but it was --
8 the whole plate was not missing. It was a crack.
9 JUDGE KARLIN: But are you saying -- okay, 10 so there was a crack there. Were they monitoring 11 according to the parameters that Dr. Wardwell just 12 gave you?
13 MR. SCARBROUGH: They were monitoring -- I 14 know they saw the change in flow distribution, and 15 that's one of the parameters that -
16 JUDGE KARLIN: No, but what we're trying 17 to figure out is, this particular protocol, three 18 parameters being continuously monitored, would that 19 have detected this crack, the crack you just 20 described?
21 MR. SCARBROUGH: I don't -
22 JUDGE KARLIN: They weren't doing that 23 monitoring.
24 MR. SCARBROUGH: I don't remember if those 25 parameters also were changing. All I do remember was NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1338 1 the flow distributions in the steam -
2 JUDGE KARLIN: Well, that's a different 3 parameter.
4 MR. SCARBROUGH: Yes, sir.
5 JUDGE KARLIN: It's not even going to be 6 monitored here.
7 MR. SCARBROUGH: Well, it's one of the 8 parameters that sits in the 644 document, if you look 9 at flow distributions and such.
10 JUDGE KARLIN: But it's not in what 11 Entergy testified that they were going to be doing.
12 Is it?
13 MR. SCARBROUGH: It's not one of the ones 14 they call out.
15 JUDGE WARDWELL: So what you're saying is 16 the distribution of flow is also a monitoring device -
17 device is the wrong word. I don't want to use 18 "parameter" either. Well, I could use parameter, and 19 it just doesn't have any critical limits on it. You 20 just look at that distribution, and if it seems 21 different than it was during normal operations, that 22 would indicate a potential problem.
23 MR. SCARBROUGH: Yes, the trending is very 24 important, because everything should stay relatively 25 normal and constant. When you see a change like that, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1339 1 operators pay attention and try to determine what's 2 happening.
3 JUDGE KARLIN: Well, that's all fine and 4 well, but on page 11 of NRC Entergy's testimony, they 5 say they're monitoring three things. They're not 6 monitoring that. Please describe the monitoring 7 program? They say the following events could be 8 indicative, they didn't say will be indicative, of a 9 significant -- A, B, C. So I guess what we're trying 10 to find out is what's the resolution of that program.
11 MR. SCARBROUGH: Right. I do not know how 12 closely the -
13 JUDGE KARLIN: Okay.
14 MR. SCARBROUGH: Identify that issue.
15 MR. HOFFMAN: May I just clarify one 16 issue? A sudden .drop in main steam line flow, there 17 are four main steam lines, so a sudden drop in a main 18 steam line flow would be indicative of a mismatch. If 19 you saw one steam line flow drop, that would be 20 indicative of a mismatch with the other three, 21 potential.
22 JUDGE WARDWELL: Mr. Scarbrough, I thought 23 I heard earlier today that at Quad Cities they saw a 24 difference in the moisture carry-over, also. Do you 25 remember anything with regard to -
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1340 1 MR. SCARBROUGH: Yes, they did say -
2 JUDGE WARDWELL: And that was prior --
3 that was several weeks or days, or months before they 4 shut down that they noticed this?
5 MR. SCARBROUGH: Well, this was actually -
6 the event I am familiar with that I was involved with 7 with Quad Cities Unit 1, which is later than the 8 earlier two Quad Cities, too. And there, because of 9 the past experience, when they saw moisture carry-over 10 change, and this flow distribution change, and 11 probably other parameters, as well, that's the only 12 one I recall, but from that, they knew something was 13 happening and they shut down very quickly, within a 14 week or so, they found the dryer was cracked.
15 JUDGE WARDWELL: Mr. Hoffman, did you 16 design this monitoring program that's presented on 17 page 11 in Answer 24 in order to detect a single crack 18 that is six inches long by a quarter inch wide?
19 MR. HOFFMAN: I did not develop this 20 monitoring program, no.
21 JUDGE WARDWELL: Okay.
22 JUDGE KARLIN: If I can understand the 23 process of - this is for Mr. Hoffman, I think - these 24 three parameters will be monitored continuously. If 25 a trigger occurs, as you've defined them, then what NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1341 1 happens? Someone goes and does a moisture analysis.
2 MR. HOFFMAN: If any of those parameters 3 fall outside the range, then the first step would be 4 the operators would request a moisture carry-over 5 measurement be taken.-.
6 JUDGE KARLIN: Okay. So first thing, any 7 of these triggers hit, moisture carry-over analysis is 8 done.
9 MR. HOFFMAN: Right. Then they would 10 assess -- they would get the results of the moisture 11 carry-over measurement.
12 JUDGE KARLIN: And then in Question 32, 13 "Will the plant continue to operate if values of 14 moisture carry-over or other parameters indicate that 15 steam dryer cracking may have occurred?" And you 16 answer, "No." That's correct. Right?
17 MR. HOFFMAN: That's correct.
18 JUDGE KARLIN: Of course, I think that 19 question hides a key question in there. What will be 20 the criterion by which it's determined whether the 21 moisture carry-over data indicates that a steam dryer 22 cracking may have occurred?
23 MR. HOFFMAN: Yes.
24 JUDGE KARLIN: I mean, presume the 25 conclusion, which is if the data indicates a crack may NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1342 1 have occurred, no, it won't continue operating. But 2 what is the criterion by which one looks at the 3 moisture content and say oh, this indicates a cracking 4 may have occurred, this doesn't indicate a cracking 5 may.have occurred. There's no objective criterion for 6 that, is there?
7 MR. HOFFMAN: If the change in moisture 8 carry-over cannot be attributed to a known plant 9 event, or operating mode change, or any of the 10 parameters with moisture carry-over, as well, that 11 would be caused by a known event, we would then get 12 into our operability, or Entergy's operability 13 evaluation process, which brings to bear technical 14 experts on the site, technical experts on other 15 Entergy sites, if necessary, outside consultants would 16 look and see -
17 JUDGE KARLIN: Well, if it can't be 18 explained by any other mechanism, then you'll shut 19 down the plant.
20 MR. HOFFMAN: If the conclusion is that we 21 cannot explain it, then the process would be shut the 22 plant down. If it cannot be ruled out that dryer 23 damage has occurred, you would shut the plant down, in 24 an orderly shut down as described.
25 JUDGE KARLIN: There's no -- can you cite NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1343 1 me to any document or criteria that says here is when 2 you shut down the plant, and here's when you don't?
3 MR. HOFFMAN: As far as-4 JUDGE KARLIN: It's a judgment call.*
5 MR. HOFFMAN: As far as moisture carry-6 over?
7 JUDGE KARLIN: Yes, sir.
8 MR. HOFFMAN: It would not be spelled out 9 as a number, because it would need to be evaluated.
10 JUDGE KARLIN: Okay.
11 JUDGE WJARDWJELL: Is that procedure spelled 12 out somewhere?
13 MR. HOFFMAN: That procedure is a spelled 14 out procedure, yes.
15 JUDGE WARDWELL: In the -
16 JUDGE KARLIN: Well, here's -
17 MR. HOFFMAN: In the ON-3178 then directs 18 to the other procedure, yes.
19 JUDGE WARDWELL: Okay. There it is. Yes.
20 JUDGE REED: I would like to follow up a 21 little on this large crack that Mr. Scarbrough 22 mentioned. Can you estimate how long it would have 23 taken that dryer to fail if the reactor had continued 24 to operate?
25 MR. SCARBROUGH: Well, the dryer had -- in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1344 I the sense of -- there was flow through -
2 JUDGE REED: I'm sorry. No loose parts 3 generated though.
4 MR. SCARBROUGH: Okay. Now, the event. that 5 I was involved with, the specific event with Quad 6 Cities Unit 1, November '03. And, actually, that grew 7 out to where there was a loose part, and that was in 8 November 2003; and there was a loose part that came 9 loose with that. So with that event, there was enough 10 flow and such that there was a piece, it was like six 11 inches by nine inches came off and escaped into the 12 main steam system.
13 JUDGE REED: You described a crack that 14 was about a foot and a half long by several inches 15 wide?
16 MR. SCARBROUGH: Yes, but -
17 JUDGE REED: Did I misunderstand -
18 MR. SCARBROUGH: Yes. I misspoke in terms 19 of the event. The event that we're -- the November 20 2003 event was a situation where it grew out, and then 21 there was a section that did come loose, so there was 22 -- the November '03 event was Quad Cities Unit 1, and 23 there was a loose part that came out of that.
24 JUDGE KARLIN: Can you tell us -- the 25 court reporter can't see where your hands are.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1345 1 MR. SCARBROUGH: Yes.
2 JUDGE KARLIN: How many inches?
3 MR. SCARBROUGH: It was a six by nine inch 4 piece. Six by nine.
5 JUDGE KARLIN: And how about the crack, 6 how big was that?
7 MR. SCARBROUGH: The crack was several --
8 it started small and then grew, so it was several 9 feet total.
10 JUDGE KARLIN: Okay.
11 JUDGE REED: Is this another crack on 12 another part of the steam dryer, or was this 13 associated with the piece that broke off?
14 MR. SCARBROUGH: This piece led from an 15 edge over to the sort of middle part of the dryer that 16 faces the main steam line exits, and so it came off on 17 that piece.
18 JUDGE REED: So a piece was broken off 19 adjacent to this crack that you mentioned. Is that 20 correct?
21 MR. SCARBROUGH: Yes. The crack grew, and 22 then as it got to the center point of the dryer plate 23 outer hood, a piece did peel off from that location.
24 JUDGE WARDWELL: And the void left by that 25 piece coming off was part of the size of the crack you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1346 1 described, or was it a piece that was appended to it, 2 and didn't create any more void, or was it another 3 void created?
4 MR. SCARBROUGH: It's sort of all one 5 continuous void. It started small, then grew at the 6 middle, and then the middle piece came out.
7 JUDGE WARDWELL: That's part of the 8 description of your several feet by six to eight 9 inches. In the middle portion of that, a solid piece 10 had been removed and went off as a loose part.
11 MR. SCARBROUGH: Yes.
12 JUDGE REED: So what we're interested in 13 is how rapidly we can go from initiation of a crack to 14 failure of the dryer with loose parts being generated.
15 In your estimation, if the cause is fatigue, what's 16 that period?
17 MR. SCARBROUGH: If it's fatigue, it 18 happens very quickly from -
19 JUDGE REED: Very quickly -
20 MR. SCARBROUGH: In terms of Quad Cities 21 was 90 days, when they went up in power for their EPU, 22 they passed the point where that acoustic resonance 23 was causing the fatigue limit to be exceeded on the 24 dryer plates, and so it happened very quickly. And 25 then they did some repairs, strengthened it, went up NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.om
1347 1 again, and within a year it failed again, Quad Cities 2 Unit 2. Quad Cities Unit 1 operated for about a year 3 at EPU conditions, and it failed, so it happens very 4 quickly. If you're above those fatigue limits, it 5 occurs very quickly, within a year.
6 JUDGE REED: Okay. And what's the 7 possibility of a crack being initiated through some 8 other mechanism, and then being amplified and leading 9 to failure through fatigue? Is that a possibility, or 10 is that considered?
11 MR. SCARBROUGH: You do usually start a, 12 fatigue crack in some location that has a high stress 13 riser, and that was part of the problem with Quad 14 Cities, is they had these braces inside that caused a 15 stress riser. It-helped initiate the crack and get it 16, moving. But you still have to be above the fatigue 17 limits for the dryer to occur. And you have little 18 weld issues and such all -- in the dryer, this big 19 device, this component, you're going to have little 20 places where there's higher stresses than other 21 places, and those could be potential sites to begin a 22 crack. So if you're above the fatigue limit, you're 23 going -- it's going to find a site to go ahead and 24 start propagating. And here, the analysis was shown 25 that they were below the fatigue limit with additional NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1348 1 uncertainties included. And then they'd be monitoring 2 every outage looking to see if there's any- issues 3 happening in the dryer, and so far as the last one 4 they had seen. So that's part of the extra 5 conservatism of making sure that all of those analyses 6 were reasonably accurate. We know there's 7 uncertainties, but we want to make sure that they're 8 still below the fatigue limit, and they see that 9 through the inspection.
10 JUDGE REED: So may I take what you just 11 said as supportive of the contention that Entergy put 12 forward earlier today, that since they've operated for 13 - how long - two years?
14 MR. HOFFMAN: A little bit over two years.
15 JUDGE REED: A little over two years at 16 the 20 percent uprate, it's very unlikely that a 17 fatigue -- it's very likely that if they had had a 18 situation where a crack was going to develop due to 19 fatigue, it probably would have already developed in 20 that two-year period. Is that correct?
21 MR. SCARBROUGH: Yes, sir.
22 JUDGE REED: So you confirm their -
23 MR. SCARBROUGH: Yes, sir. Their finding 24 small little -- they had been in there in the past and 25 they have not grown, and so this was the additional NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1349 1 confirmation that the analyses, that they really are 2 below the fatigue limit for the material.
3 JUDGE REED: Dr. Hopenfeld, did you have -
4 5 DR. HOPENFELD: Yes. I gave one example 6 before, but maybe too general about why, the rationale 7 that-8 JUDGE REED: I'm having trouble hearing 9 you.
10 DR. HOPENFELD: I gave one example before 11 as to why the rationale that one inspection is not 12 sufficient without doing, without showing the 13 calculations. It's not sufficient to demonstrate that 14 you are not going to have failure later on. The only 15 way that one can do that, because so many parameters 16 coming into this, is very, very plant-specific. The 17 only way you can do that is by doing the calculations, 18 or instrumenting the dryer. But let me give you 19 another example, because I gave you a very general 20 example.
21 Suppose that the requirements was that you 22 inspect the dryer every three months, so you inspect 23 it the first three months, and you look at it and say 24 well, nothing happened. Would you be able to conclude 25 without anything else that nothing is going to ever NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1350 1 happen forever? Obviously, not. Then you go to the 2 six month, where do you draw the line? The only way 3 you can draw the line is with calculations. There's 4 no other way.of doing it, because so many -- what you 5 have, you have the natural vibration of the different 6 components of the dryer, the location, the different 7 possibility of sources, and the different designs.
8 This design is different. Plus, there were 9 modifications in the dryer, also. So you just can't -
10 - I mean, it's impossible to take one situation that 11 happened in November and say well, I can conclude 12 that's the time scale.
13 JUDGE KARLIN: But, Dr. Hopenfeld, I still 14 am troubled by this. It's my understanding that 15 they're not trying to say it will never happen. The 16 program is there to detect if it does happen, so that 17 action can be taken in some time frame to shut the 18 facility down, or do whatever is necessary. They're 19 not trying to say it won't happen. They're trying to 20 detect it if it does, and then take action.
21 DR. HOPENFELD: Okay. I was addressing 22 the first part, now let me address this one. General 23 Electric concluded in SIL NO-644 on page 6, they 24 concluded from the November 2003 experience that the 25 failure -- they're referring to the November 2003 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealraross.com
1351 1 experience, that monitoring steam moisture content and 2 other reactor parameters does not consistently predict 3 imminent dryer failure.
4 JUDGE KARLIN: Yes, sir.
5 DR. HOPENFELD: Does not. And that's -- I 6 don't know what else he's going to say.
7 JUDGE KARLIN: I agree. I had that very 8 provision on page 6 of SIL 644 underlined. The 9 November 2003 hood failure - is this the one you're 10 referring to, Mr. Scarbrough?
11 DR. HOPENFELD: Yes.
12 JUDGE KARLIN: Mr. Scarbrough?
13 MR. SCARBROUGH: Right. Yes, sir.
14 JUDGE KARLIN: That's the one you were 15 involved in. "Demonstrated that monitoring steam 16 moisture content and other reactor parameters does not 17 consistently predict imminent dryer failure. My 18 question is they're not trying to predict. They're 19 trying to detect it, so that action can be taken.
20 DR. HOPENFELD: No, it says it doesn't 21 detect it either.
22 JUDGE WARDWELL: Where does it say that?
23 DR. HOPENFELD: Well, it doesn't need the 24 work, the indication it doesn't detect.
25 JUDGE KARLIN: Well, I think, as I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1352 1 understand it, Entergy is positive that they're not 2 trying to predict, they're trying to detect. So is 3 this a non-issue?
4 DR. HOPENFELD: Well, if that's the case, 5 then what they would have to do - this is a general 6 statement off the detection co-exhibit, because if you 7 detect, you know -- maybe they need to fill out -
8 JUDGE KARLIN: Well, let me back up. As 9 I understand your counsel's position, your position is 10 they need to predict it.
11 DR. HOPENFELD: Correct.
12 JUDGE KARLIN: They're saying they don't 13 need to predict it. They just need to detect it.
14 -DR. HOPENFELD: Well, if that's the case, 15 sir, I believe that they should be able to answer the 16 question that was brought here, is to tell me what is 17 the size of a crack, the minimum size of a crack and 18 its location. You have to realize, there are, many, 19 many locations these cracks can happen, and that may 20 be a long time for that steam to find itself somewhere 21 you could measure it, or you need to see a level 22 change, so you have to do a parametric study, 23 sensitivity study to show me. I haven't seen any of 24 that, and I don't believe that you have seen any of 25 that. So all we hear with the gentleman just talking, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1353 1 I mean, they're giving you an opinion completely based 2 on their feel. They don't -- I mean, this is not 3 engineering. You know, this is just not engineering 4 what you're hearing here.
5 JUDGE KARLIN: Well, let me ask, what are 6 we trying to predict, what are we trying to detect?
7 It seems to me that we're not -- there's something 8 between dryer failure and a crack. It's not either 9 one of those, it seems to me. It seems to me what 10 we're concerned about is a threat, or a problem with 11 regard to the safety. And as I understand it, if such 12 a problem would arise, if a piece breaks off, drops 13 down, gets into some valve somewhere and causes a 14 problem, so that's not a crack, that's a piece 15 breaking off. And it's not failure of the whole steam 16 dryer either. It's something in between there.
17 DR. HOPENFELD: Correct.
18 JUDGE KARLIN: And so the fact that they 19 can't detect a crack of X amount, or a steam dryer 20 total collapse failure, I don't know what the 21 definition of failure is. There's more -- are they 22 going to be able to detect a piece dropping off such 23 that if it -- anything that might affect safety, 24 something -
25 DR. HOPENFELD: I'll tell you, if somebody NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1354 1 gave me a Job, I was making some time to do that, and 2 somebody would ask me okay, just answer that question.
3 I'll start with a piece of paper. I'll start with 4 ýthis a different size of crack, different location, 5 and then find out how many of those do I need, what's 6 the total surface, I mean opening area that I need for 7 me to detect it at Point A, B, and C, whatever, 8 whatever they detect. The next thing I'm going to do 9 is take a look at these cracks and see what kind of 10 geometry configuration or topography I need for these 11 things to cause a loose part. If I have a little part 12 here, and a little crack somewhere far away, maybe 13 this is a single crack, maybe that's not going to 14 cause any rupture. maybe that by itself, you detect 15 it, that's fine. I'd like to tell you that everything 16 was -- they say doesn't 'make sense. Some of it does, 17 because it does a certain amount of that, but that's 18 not how you look at safety.
19 JUDGE WARDWELL: How are your calculations 20 going to result in anything better in regards to -
21 DR. HOPENFELD: Well, because I'll tell 22 you, what -
23 JUDGE WARDWELL: -- any prediction, 24 because it's just supposition of where you happen to 25 select the -
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1355 1 MR. HOFFMAN: Right. But that's all you 2 can do. I mean, then you say look, you're going the 3 probability, probabilistic basis on that. You would 4 say well -
5 JUDGE WARDWELL: What then would you use 6 to support the probability of a failure occurring, a 7 crack in a given location?
8 DR. HOPENFELD: You have to see what's the 9 minimum ambunt of cracks they need -
10 JUDGE WARDWELL: What data are you going 11 to use to select -- to indicate the probability at a 12 given location? You don't have any, do you?
13 DR. HOPENFELD: Yes, I have -- well, what 14 data are you asking me? I haven't started working on 15 that problem. I believe that's their job.
16 JUDGE WARDWELL: Yes, but think about it.
17 DR. HOPENFELD: What data?
18 JUDGE WARDWELL: You would need some 19 observational data -
20 DR. HOPENFELD: You need calculation to 21 see how fast these cracks grow, and how they form.
22 JUDGE WARDWELL: You can't make up the 23 calculations in a void in a probability. risk 24 assessment. You have to -
25 DR. HOPENFELD: No, no, but stuck with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1356 1 crack, you come up with some assessment. You're going 2 to look at how you stress the area to begin with.
3 You're going to look at existing cracks. That's how 4 you're going to start.
5 JUDGE KARLIN: Doctor, may I jjast -- let's 6 just double check here. Mr. Scarbrough, perhaps I 7 could ask you if you agree with this, which is the 8 statement out of SIL 644, page 6. It was quoted 9 earlier. I won't read it. I'll quote, "The November 10 2003 BWR-3 hood failure demonstrated that monitoring 11 steam moisture content. and other reactor parameters 12 does not consistently predict imminent dryer failure, 13 nor will it preclude the generation of loose parts."
14 Do you agree with that statement?
15 MR. SCARBROUGH: Yes, I agree with that 16 statement.
17 JUDGE KARLIN: Okay. Mr. Hoffman from 18 Entergy, or Mr. Lukens, do you agree with that 19 statement?
20 MR. HOFFMAN: Yes, sir.
21 MR. LUKENS: Yes.
22 JUDGE KARLIN: Okay. The next statement 23 is, "Monitoring is still useful in that it does allow 24 identification of a degraded dryer, allowing 25 appropriate action to be taken to minimize the damage NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1357 1 to the dryer and the potential for loose parts 2' generation." Do you agree with that, Mr. Hoffman?
3 MR. HOFFMAN: Yes, sir.
4 JUDGE KARLIN: Mr. Scarbrough?
5 MR. SCARBROUGH: Yes, I do.
6 JUDGE KARLIN: Dr. Hopenfeld?
7 DR. HOPENFELD: In general, yes.
8 JUDGE KARLIN: You agree with that. So 9 we're all in agreement.
10 DR. HOPENFELD: In general, yes.
11 JUDGE KARLIN: Okay.
12 JUDGE REED: Okay. I would like to focus 13 now on the inspection component of this program. I 14 don't know whether you consider inspection as part of 15 the monitoring program, or separate.
16 MR. LUKENS: There's probably some 17 confusion about that, because what we referred to as 18 the steam dryer monitoring plan contains both online 19 monitoring and inspection.
20 JUDGE REED: I see. Okay. So, to date, 21 we've been talking about the online monitoring.
22 MR. LUKENS: Yes, sir.
23 JUDGE REED: I would now like to talk 24 about the visual inspections that you do. Before we 25 begin, maybe we should talk about existing cracking of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1358 1 the dryer. It's my understanding that cracks have 2 been observed in the dryer, and been repaired. Is 3 that correct?
4 MR. LUKENS: Yes, sir.
5 - JUDGE REED: Could you briefly describe 6 what the -
7 MR. LUKENS: A brief history?
8 JUDGE REED: Yes.
9 MR. LUKENS:. The first comprehensive 10 examination of the dryer was in 2004 in anticipation 11 of power uprate. That examination found 20 12 indications by visual examination. Of those 20, two 13 were determined that they needed repairs. We ground 14 them out and re-welded them.
15 JUDGE REED: Well, why would a particular 16 crack need repairing and another one would not?
17 MR. LUKENS: The decision about whether a 18 crack needs to be repaired or not goes to how big is 19 the section that it's in, and what is the critical 20 size for a flaw in that location, and how fast using 21 standard methodology, how fast will that crack grow, 22 and how big will it be at the end of 18 months, the 23 next refueling outage?
24 JUDGE REED: So what kind of methodology 25 would predict that rate of crack growth?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1359 1 MR. LUKENS: The rate of crack growth 2 inter- granular stress corrosion cracking, IGSCC, the 3 industry-accepted number is 5 times 10 to the minus 4 5 "h inches per hour, which roughly translates to 5 something on the order of half an inch a year.
6 JUDGE REED: So you assumed that all of 7 the cracking that was observed was inter-granular 8 stress corrosion cracking?
9 MR. LUKENS: No, sir, we did not assume 10 that it was inter- granular stress corrosion cracking, 11 we observed that. It is possible.
12 JUDGE REED: What are the characteristics 13 14 JUDGE WARDWELL: It's possible what?
15 MR. LUKENS: To determine by visual 16 examination whether a crack is IGSCC or petite.
17 JUDGE WARDWELL: And what is that visual 18 indication?
19 MR. LUKENS: IGSCC typically occurs in 20 the heat affected zone adjacent to a weld, because 21 that's the area that's been sensitized. IGSCC requires 22 stress and the right material properties, and the 23 right environment to cause it to propagate. The heat 24 affected zone adjacent to a weld in austenitic 25 stainless steel typically has the right material to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1360 1 propagate an IGSCC crack.
2 The dryer was essentially cold formed and 3 welded together, so that there are very large residual 4 manufacturing stress, so we anticipate finding IGSCC 5 cracks in the dryer, and we did. A petite crack - let 6 me characterize an IGSCC crack.
7 Inter-granular stress corrosion cracking 8 goes between grain boundaries, therefore, the 9 appearance of an IGSCC crack is going to be jagged.
10 A petite crack tends to be a straight line, and based 11 on where the crack is; that is, is it in a high-12 stress, low-stress area, is it in heat affected zone, 13 is it crooked or is it straight? We can tell whether 14 a crack is IGSCC or petite.
15 JUDGE WARDWELL: And all of these were?
16 MR. LUKENS: All of these were IGSCC.
17 JUDGE WARDWELL: IGSCC.
18 MR. LUKENS: Yes, sir.
19 JUDGE WARDWELL: Did any of them penetrate 20 the entire thickness?
21 MR. LUKENS: IGSCC cracks are typically 22 very tight so that we can't actually determine depth.
23 For purposes of analysis to determine whether it's 24 acceptable to run another 18 months, we assume the 25 crack goes all the way through.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealroross.com
1361 1 JUDGE REED: Okay. You were in the process 2 of doing -
3 MR. LUKENS: I'm sorry, yes. That was 4 2003. 2005, we did an augmented partial examination.
5 We had not yet reached uprate conditions.
6 JUDGE KARLIN: May I stop you for a 7 moment?
8 MR. LUKENS: Yes, sir.
9 JUDGE KARLIN: If I may, and say maybe we 10 could -- while you're -talking, I'm reading your 11 testimony on this.
12 MR. LUKENS: Yes.
13 JUDGE KARLIN: This is page 22 of your 14 staff exhibit, or Entergy Exhibit 01, which is now, of 15 course, in the record. I'm following your testimony, 16 page 23, we're at the 2005 refueling outage.
17 MR. LUKENS: Yes, sir.
18 JUDGE KARLIN: Fall of 2005.
19 JUDGE WARDWELL: We've been under the 20 power uprate now for -
21 MR. LUKENS: The outage of 2005 was prior 22 to uprate. We had not -
23 JUDGE WARDWELL: Prior to.
24 MR. LUKENS: -- yet achieved uprate 25 conditions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1362 1 JUDGE WARDWELL: And what number was this?
2 MR. LUKENS: This was RFO-25.
3 JUDGE WARDWELL: Okay.'
4 MR. LUKENS: We did an augmented 5 examination of the dryer; that is, it was larger than 6 the required scope by the BWR VIP, but it was less 7 than all accessible susceptible areas because we had 8 just done one of those the previous outage. And since 9 we hadn't achieved uprate conditions, nothing had 10 changed, so we performed the examinations. We found 11 66 indications in the dryer in that examination. It's 12 worth pointing out that we found 66 indications, even 13 though the actual number of exams was significantly 14 less than it had been in 2004. The reason for that is 15 that the examination quality in 2005 was superior to 16 what we got in 2004.
17 A VT-l examination, which is what we do, 18 has a specific resolution requirement to meet the --
19 to be called a VT-l. The examinations in 2004 met 20 that requirement. The examinations in 2005 exceeded 21 that requirement. And, as a result, their resolution 22 was much better than the resolution in 2004, and we 23 found a lot of indications.
24 JUDGE REED: Do you recall off the top of 25 your head what is the resolution requirement of a VT-NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1363 1 I?
2 MR. LUKENS: VT-I requires, and this is 3 also in testimony, VT-i -
4 JUDGE REED: I've listened to the 5 testimony but I've forgotten.
6 MR. LUKENS: VT-i requires that we be able 7 to distinguish a point zero or four inch lower case 8 character without ascenders or descenders. That would 9 be, for example, an A, an 0, an E.
10 JUDGE REED: Yes.
11 JUDGE WARDWELL: .044, 44 thousandths?
12 MR. LUKENS: 44 thousandths of an inch, 13 and I struggled before these hearings began to try to 14 make that mean something. It turns out that 44 15 thousandths of an inch is slightly larger than the 16 micro engraving on a dollar bill.
17 JUDGE KARLIN: So the difference between 18 the 2004 and 2005 detection of indications was not a 19 function -- I thought 2004 was a VT-3 exam, and the 20 2005 was a VT-i.
21 MR. LUKENS: No, sir.
22 JUDGE KARLIN: No, they're both VT-is?
23 MR. LUKENS: They were both VT-is.
24 JUDGE KARLIN: But this was sort of VT-i 25 plus, even better than -
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1364 1 MR. LUKENS: Yes, sir. That's a good way 2 to characterize it.
3 JUDGE KARLIN: Okay.
4 JUDGE REED: Is the surface condition of 5 this dryer after 30 something years of operation such 6 that you can see cracks, or is the surface rather 7 eroded, or is it hard to see a crack? Is it a nine 8 shiny surface and you can see a crack, or -
9 MR. LUKENS: There are places that are 10 nice and shiny. There are places where there are 11 corrosion products, and more recently, some residue 12 from noble metals treatment, which in some cases makes 13 a surface examination a little more difficult.
14 However, despite that, using the VT-l plus, if I may, 15 we found a lot ore indications in 2005 than we did in 16 2004. We found all of the 2004 indications, and none 17 of them had grown. We also examined the modifications 18 made in 2004, and the two repairs that we made in 19 2004, and there were no indications.
20 In 2007, we did another comprehensive exam 21 of all susceptible areas, so this was the same scope 22 as the 2004 exam. Under the resolution requirements 23 that we achieved in 2005, we specified to the 24 examiners that they had to be able to see as well in 25 2007 as they did in 2005. We weren't going to take a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1365 1 sort of bottom acceptable VT-I. We'd already seen 2 what we can get with a better exam, and we wanted it.
3 We got 66 indications, 66 relevant 4 indications in 2007. We found 48 of the previous 5 indications, none of th-em had grown. We found 28 new 6 ones, which were all IGSCC, and were all 7 dispositioned, use as-is, and there were 9 indications 8 from 2005 that were determined in 2007 to be non-9 relevant indications.
10 (Clock chime.)
11 JUDGE REED: -- as a non-relevant -
12 MR. LUKENS: A non-relevant indication is 13 something that does not produce a surface irregularity 14 within the resolution of a VT-l examination. What 15 that really means is they went to the location where 16 there had been an indication the previous outage. But 17 one indication that I'm particularly familiar with, 18 they illuminated it from the left-hand side, and it 19 looked just like it had in the previous outage. They 20 illuminated it from the right-hand side, and the 21 indication went away. It was a shadow, so that became 22 a non-relevant indication.
23 JUDGE KARLIN: You talked in your 24 testimony, sir, written testimony about recordable.
25 Is that the same as -- when you say "relevant", it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1366 I seems like a new term to me, as opposed to 2 "recordable". Is it the same or different?
3 MR. LUKENS: Relevant is the correct 4 terminology in non-destructive examination. All 5 relevant indications must be recorded. In addition, 6 we may record indications that turn out to be not 7 relevant. And I apologize for the confusion.
8 JUDGE KARLIN: No, I was just confused, 9 because on page 20 you testified that "an indication 10 is classified as recordable or relevant if it is 11 visible to the resolution of the examination 12 technique."
13 MR. LUKENS: That is correct.
14 JUDGE KARLIN: Okay. And so those are 15 interchangeable terms in this sense?
16 MR. LUKENS: Yes, they are.
17 JUDGE KARLIN: Recordable and relevant?
18 MR. LUKENS: Yes.
19 JUDGE KARLIN: All right.
20 JUDGE REED: So what's a VT-3 inspection, 21 and when would you use that?
22 MR. LUKENS: A VT-3 inspection does not 23 have the same resolution requirements as VT-I. VT-3 24 is a more general examination for looking at material 25 condition, and it is typically used in visual NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1367 1 examination of other reactor internal components other 2 than the steam dryers. In earlier times, the dryer 3 was examined by VT-3, but in the recent past, 4 certainly the last three outages at Vermont Yankee, 5 dryer examinations have been by VT-l.
6 JUDGE REED: Are all the locations on the 7 steam dryer where cracks could potentially form 8 subject to inspections? Can you see everywhere that 9 you need to see?
10 MR. LUKENS: Yes, sir, you can. The areas 11 most susceptible to failure are the outer surfaces of 12 the steam dryer, vertical, the sides, cover plates.
13 Those are all on the exterior, and they are easily 14 accessible, so all of the susceptible areas are 15 accessible.
16 JUDGE REED: All right.
17 JUDGE KARLIN: So there's only been --
18 since the uprate, there's only the Spring 2007 visual 19 inspection event?
20 MR. LUKENS: That's correct. Spring 2007 21 was the first inspection -
22 JUDGE KARLIN: The next one is due?
23 MR. LUKENS: -- following uprate. We'd 24 been operating about a year.
25 JUDGE KARLIN: And the only one since the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1368 1 uprate.
2 MR. LUKENS: And the only one so far.
3 JUDGE KARLIN: Okay.
4 MR. LUKENS: The next one will be in 5 October this year.
6 JUDGE KARLIN: Okay.
7 JUDGE WARDWELL: Referring to the SIL 644, 8 page 6, A-l(c).
9 MR. LUKENS: Yes, sir..
10 JUDGE WARDWELL: It says, "Flaws left as-11 is should be inspected during each scheduled refueling 12 outage until it has been demonstrated that there are 13 no further crack growth and the flaws have been 14 stabilized."
15 MR. LUKENS: Yes.
16 JUDGE WARDWELL: Are all of these crack 17 detections considered flaws?
18 MR. LUKENS: Yes. We do not distinguish 19 between -- for the purposes of complying with the SIL, 20 we don't make a distinction between an indication, a 21 flaw, and a crack. If it's big enough to see in a VT-22 1, we record it as relevant and we track it to verify 23 that it's not growing.
24 JUDGE WARDWELL: What is the definition of 25 a demonstration that no further crack growth is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1369 1 occurring, and the flaws are stabilized?
2 MR. LUKENS: Our position, which is 3 consistent with ASME and the industry, is that if a 4 crack is shown not to be growing in the two 5 inspections following its initial discovery, it's not 6 growing, and need not be inspected.
7 I point of fact, we haven't even had a 8 discussion about not looking at old indications, 9 because all of -- since we're doing comprehensive 10 dryer examinations, we're going to be there anyway, so 11 we just continue to look for those indications, record 12 their size, and compare them to what they were.
13 JUDGE REED: Is there any role for 14 ultrasonic testing? I know this is done -- we talked 15 earlier in this hearing about testing of a feedwater 16 nozzle, and completely different techniques are used..
17 I just would like to know why on some locations in the 18 reactor you use different techniques to look for 19 cracks. Why here is it strictly visual?
20 MR. LUKENS: Ultrasonic techniques are 21 typically used on pressure-retaining components, like 22 feedwater nozzles and reactor cooling system lines.
23 The steam dryer is a non-pressure-retaining component.
24 JUDGE REED: What's the reason for that?
25 Is it more sensitive, a higher resolution, can it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1370 1 detect the depth of a crack, Or -
2 MR. LUKENS: Ultrasonic can do a lot of 3 things, but it's not an unmixed blessing. It may show 4 things in a piece of stainless steel that are not 5 flaws, they're called reflectors.
6 JUDGE REED: So you get false positives?
7 MR. LUKENS: We get false positives. And 8 the consensus is that visual examination at the VT-l 9 standard is the right test for determining dryer 10 integrity.
11 JUDGE REED: And when you talk about crack 12 growth, you can't see the depth of the crack, so 13 you're really talking about the longitud-inal -
14 MR. LUKENS: That's correct. The only 15 visual we have is length. We assume that it's all the 16 way through.
17 JUDGE REED: Okay.
18 JUDGE KARLIN: Can I ask a question? On 19 page 25 of your testimony, this is part of the 20 testimony I think you corrected.
21 MR. LUKENS: Yes.
22 JUDGE KARLIN: But my question is not 23 directed to any of the corrections, I don't think.
24 And you discussed earlier in your testimony that the 25 total number of examinations that you conducted in the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1371 1 2007 inspection were greater.
2 MR. LUKENS: Yes.
3 JUDGE KARLIN: Significant, 463, than the 4 total number of dryer exams in 2005, which is 113, and 5 2004, which is 287. Presumably, is it laid out 6 somewhere, how many -- can you just do as many as you 7 feel like, or what's the standard for how many dryer 8 exams will be done each time there's a refueling 9 outage?
10 MR. LUKENS: The standard for how many 11 dryer exams will be done, if I may simply address the 12 13 JUDGE KARLIN: Well, obviously, you-have 14 to look at the cracks that were existing before to see 15 if they're grown.
16 MR. LUKENS: That's correct.
17 JUDGE KARLIN: But maybe that's sort of a 18 baseline, and then -
19 MR. LUKENS: That's actually a small 20 piece.
21 JUDGE KARLIN: Yes.
22 MR. LUKENS: The fundamental scope using 23 SIL 644 is all the accessible susceptible areas. And 24 the SIL shows in color diagrams where the susceptible 25 areas are. However, the SIL is somewhat generic in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(2021 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1372 1 its reference to weld numbers, so it is the job of the 2 program engineer to take those diagrams and distill 3 out of them all of the weld numbers in our dryers.
4 It's a very site-specific number. All of the weld 5 numbers in our dryer need to be examined.
6 JUDGE KARLIN: But then shouldn't this 7 number be the same for each one of the exams, because 8 the non-relevants aren't going to change for Vermont 9 Yankee.
10 MR. LUKENS: That's correct. The 2005 11 exam, as I said, was not a comprehensive exam. It was 12 an augmented exam, but not comprehensive. And the 13 difference between 2004 and 2007, we both had the same 14 requirement of accessible susceptible.
15 JUDGE KARLIN: Oh, yes.
16 MR. LUKENS: The difference between those 17 is that different companies perform those two sets of 18 exams, different people count an exam a different way, 19 and in one case one weld may be one examination, in 20 another case a weld may be two examinations, and so it 21 -- we have struggled with this. And with experience, 22 we have identified by examination number all of the 23 welds that are in the scope. And I would expect in 24 this fall that that number that we examined in 2005, 25 463, very, very close to the actual count in 2007.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1373 i JUDGE KARLIN: And you have this done by 2 an outside contractor, I think your testimony, 3 typically.
4 MR. LUKENS: Typically do, yes.
5 JUDGE KARLIN:. Did you change your 6 contractors between the -
7 MR. LUKENS: Yes, we did.
8 JUDGE KARLIN: -- two events, 2005, 2007?
9 MR. LUKENS: And we changed again between 10 2005 and 2007.
11 JUDGE KARLIN: Okay.
12 MR. LUKENS: But the burden of 13 establishing the scope and deciding what gets looked 14 at is our's. That's the program engineer's job.
15 JUDGE KARLIN: All right.
16 MR. LUKENS: The company that we call in 17 to do the exam simply performs the exams we tell them 18 to do.
19 JUDGE KARLIN: It doesn't seem like it 20 should change that much.
21 MR. LUKENS: It doesn't seem like it 22 should change that much, 100 percent should be 100 23 percent.
24 JUDGE KARLIN: Yes.
25 JUDGE WARDWELL: Can you comment somewhat NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1374 1 in regards to the potential for the IGSCC cracks to 2 provide a basis, or a logical location for additional 3 cracking and crack growth associated with fatigue?
4 MR. LUKENS: Yes. For an IGSCC crack to 5 become a.site for fatigue failure, it has to occur in 6 a high-stress area. It has to occur in an area that 7 had been subject to cyclic stress loads that exceed 8 the endurance limit. To-date, we have never found an 9 indication in a high-stress area of the dryer. IGSCC 10 indications we have found have been in low-stress 11 areas of the dryer, which is another way of confirming 12 that, in fact, they're not really -
13 JUDGE WARDWELL: May I refer you to NEC 14 JH-68, which is -
15 MR. LUKENS: Yes, sir.
16 JUDGE WARDWELL: It's probably some other 17 number, but it's your condition report of May 2 8 1h, 18 '07, 2133 did you say?
19 MR. LUKENS: Yes.
20 JUDGE WARDWELL: Yes, that's the CRB VTY 21 2007-002133.
22 MR. LUKENS: That's correct.
23 JUDGE WARDWELL: Yikes, a quarter of inch 24 of pages into that - I can't go any further - where 25 it's evaluation of steam dryer indications.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1375 1 MR. LUKENS: Yes, sir.
2 JUDGE WARDWELL: It's probably the first 3 real page of text, full text.
4 MR. LUKENS: Yes. Let's see.
5 JUDGE WARDWELL: Probably going to guess 6 my question.
7 MR. LUKENS: I hope so.
8 JUDGE WARDWELL: And I'm looking at the 9 section that's entitled, "Evaluation of indications",t 10 the third section down, "Introduction, Discussion, and 11 Evaluation of Indications. " The first paragraph, one, 12 two, three, four, five, six, seven, eight lines -
13 seven lines down, one word in, the sentence starts, 14 'However, continual growth by fatigue cannot be ruled 15 out in regards to these", I assume it's in the -
16 MR. LUKENS: Yes, that's what it says.
17 JUDGE.WARDWELL: Would you like to comment 18 on what does that mean? That seems to indicate to me 19 that you found something, an IGSCC that you referred 20 to in the first sentence of this evaluation.
21 MR. LUKENS: This wording was part of what 22 became a -- part of a draft that became a signed 23 issued report. This page is not part of a signed 24 report. This page was used to clear an outage 25 constraint so that this indication would not cause us NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www~nealrgross.com
1376 1 to delay start-up. The standard of rigor for what it 2 takes to clear an outage restraint is different than 3 the standard of rigor that it takes to perform the 4 actual investigation and corrective action for a 5 condition report. And that standard of rigor was met 6 in the corrective action to investigate and correct 7 this. And the document that did that is - actually, 8 it's in front of the page that we're reading from -
9 the document that did that is VY-RPT-07-00011. That 10 is the -
11 JUDGE WARDWELL: You lost me on where this 12 document is.
13 MR. LUKENS: Yes. About a 1 6 h of an inch 14 ahead of where you are.
15 JUDGE WARDWELL: Hah-hah, something I 16 understand.
17 (Laughter.)
18 JUDGE WARDWELL: I gotcha. Yes.
19 MR. LUKENS: That's the final report, an 20 engineering report by Vermont Yankee, that 21 dispositioned this indication. The phrase that 22 appeared in the draft does not appear in the final 23 report, and the reason that phrase does not appear is 24 because that phrase added no engineering or technical 25 value to the conclusions in that report.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1377 1 JUDGE WARDWELL: But yet, someone made 2 this statement, and is it a false statement?
3 MR. LUKENS: It's not false in the sense 4 that there are millions of things that could not be 5 ruled out. It raises a question that didn't exist.
6 JUDGE WARDWELL: Because of your previous 7 testimony that this crack or cracks that this was 8 referring to was not in a location for high -
9 MR. LUKENS: That is correct.
10 JUDGE WARDWELL: -- stresses.
11 MR. LUKENS: That sentence lended an air 12 of ambiguity that the engineering evaluation did not 13 support. We knew that these were IGSCC cracks.
14 JUDGE WARDWELL: Clarify for me then, 15 again, why was it in the draft, that it was just a 16 stream of consciousness writing that someone just 17 added that, or was it something else?
18 MR. LUKENS: That occurred on the first of 19 June. That's the date that the corrective action was 20 cleared.
21 JUDGE WARDWELL: What year?
22 MR. LUKENS: 2007. This was actually 23 during the outage. And I simply don't recall 24 conversations that we had around that time.
25 JUDGE WARDWELL: How come it's not marked NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1378 1 "draft" anywhere, or is it? Point to me where it is.
2 MR. LUKENS: It's actually not marked at 3 all. It is simply a piece of paper that was attached 4 to a corrective action to close it, and that was 5 accepted by flight management as adequate 6 justification to clear that outage. But it is not, in 7 any sense, an engineering evaluation.
8 JUDGE WARDWELL: Are you all done? Yikes, 9 now we're not going to be as organized as Dr. Reed.
10 I'd like to go back, if we could, to talk about the 11 practicality of measuring stress loads directly on the 12 steam dryer.
13 MR. LUKENS: Yes, sir.
14 JUDGE WARDWELL: Is that a feasible thing 15 to do?
16 MR. LUKENS: Not in our view. No, sir.
17 JUDGE WARDWELL: And why not?
18 MR. LUKENS: It would involve attaching 19 strain gauges to the dryer, and those strain gauges 20 would have to be attached by welding, so if the 21 attachment of the strain gauges introduces high-stress 22 areas in the dryer that didn't exist before, then the 23 electrical wires from those strain gauges have to be 24 led out of the reactor vessel. All of that 25 paraphernalia becomes potentially loose parts.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.Gom
1379 1 JUDGE WARDWELL: But there is internal 2 monitoring of the core, isn't there, within there, and 3 they have that same challenge, don't they, in regards 4 to getting wiring out of the -
5 MR. LUKENS: Core monitoring that involves 6 instruments that have wires coming out of the reactor 7 vessel is nuclear instrumentation. And nuclear 8 instrumentation goes in from the bottom of the vessel, 9 and the wires come out the bottom. And those 10 detectors are not in the steam flow path, and we don't 11 have to put tack welds on components to get them 12 installed.
13 JUDGE WARDWELL: Are those the only 14 instruments that are inside the reactor vessel, are 15 those core detectors that have external leads coming 16 out?
17 MR. LUKENS: Those are the only ones that 18 I can think of. Pressure and level detectors are a 19 different set of instruments, and they don't have any 20 analog to nuclear instrumentation, or to strain 21 gauges.
22 JUDGE WARDWELL: But how do they work?
23 MR. LUKENS: Well, the way they work is -
24 JUDGE WARDWELL: This is the other ones, 25 the pressure levels, or the water levels?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1380 1 MR. LUKENS: Pressure level, essentially, 2 we -- well, pressure, we have a little pipe that comes 3 out of the side of the reactor, and we put a pressure 4 gauge on it, very simple.
5 JUDGE WARDWELL: So that's external.
6 MR. LUKENS: External. Water level, we 7 essentially do that twice. We do it once low, and 8 once high, and -
9 JUDGE WARDWELL: It's a manometer.
10 MR. LUKENS: And it's a manometer.
11 JUDGE WARDWELL.: Mr. Hoffman?
12 MR. HOFFMAN: The nuclear instrumentation 13 that goes in the bottom of the vessel doesn't enter 14 the water. It's in what they call a dry tube. It 15 goes up and down, so it's not exposed to reactor 16 temperature or reactor pressure.
17 JUDGE WARDWELL: These difficulties are 18 circumvented by measuring within the steam line, is 19 what you did during the power uprate.
20 MR. LUKENS: That's correct.
21 JUDGE WARDWELL: That is feasible to do, 22 because you did it already.
23 MR. LUKENS: We did it. Yes, sir.
24 JUDGE WARDWELL: The drawback is now you 25 have to have some type of mechanism to extrapolate NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1381 1 that data into what the pressures would be in at the 2 steam dryer. With that information, you'd have to --
3 from that monitoring, from that information, you'd 4 have to extrapolate to what the measurements would be 5 in at the steam dryer in order to be of any use.
6 MR. LUKENS: That's the process that was 7 used during power extension. Yes, sir. Strain gauge 8 data was manipulated into ultimately cyclic pressure 9 sources.
10 JUDGE WARDWELL: And if one was to 11 consider. augmenting an aging management plan to 12 include some type of mechanism to determine the 13 stresses on the dryer, and were going to conclude that 14 the only reasonable way to do it was to remotely 15 measure them in the steam line, and then extrapolate 16 to what they would be in the steam dryer, you'd have 17 to come up with a mechanism to do that extrapolation.
18 MR. LUKENS: Yes, sir, we would. I think 19 that assumes that we need to.
20 JUDGE WARDWELL: Correct. That was where 21 I was going with the next question. Dr. Hopenfeld, of 22 what use would these stress measurements be on the 23 steam dryer as an aging management plan to -- what 24 incremental use would there be of this?
25 DR. HOPENFELD: Would be tremendous NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1382 1 incremental use because, to answer the question of 2 being able to -
3 JUDGE WARDWELL: Speak up.
4 DR. HOPENFELD: It would answer the 5 question where are you with respect to the endurance -
6 7 JUDGE WARDWELL: Don't the inspections do 8 that for us?
9 DR. HOPENFELD: No, they don't.
10 JUDGE WARDWELL: Let me finish. Let me 11 finish my question so that you can know what you're 12 answering.
13 DR. HOPENFELD: Yes.
14 JUDGE WARDWELL: Do not the inspections do 15 that if they demonstrate that, in fact, there are no 16 fatigue cracks?
17 DR. HOPENFELD: No.
18 JUDGE WARDWELL: That the endurance level 19 hasn't been exceeded?
20 DR. HOPENFELD: No, they do not, because 21 it depends on the number of cycles, and it depends on 22 the load.
23 JUDGE WARDWELL: How many cycles are 24 needed?
25 DR. HOPENFELD: Well, I couldn't answer NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealraross.com
1383 1 how many cycles, it depends on the load. It depends 2 on what the -- the intensity of the pressure in the 3 dryer.
4 JUDGE WARDWELL: How long, in your 5 professional opinion, do you think stress loads would 6 have to be monitored - I mean, sorry - strike that -
7 how long, in your opinion, do you believe that 8 observations of no cracking associated with vibration 9 fatigue would have to occur before you would be 10 comforted that, in fact, the endurance limit is not 11 being exceeded under the normal power uprate that now 12 exists?
13 DR. HOPENFELD: I thought a lot about that 14 question myself before I -
15 JUDGE WARDWELL: Well, you must have an 16 answer then.
17 DR. HOPENFELD: Yes, well, I don't. I'll 18 tell you, because I could give you the answer that I 19 want, that the problem is -- first you have to realize 20 you're not talking -
21 JUDGE WARDWELL: I don't want any answer 22 I want, I would like to know what is your professional 23 opinion.
24 DR. HOPENFELD: I do not have one.
25 JUDGE WARDWELL: Anyone from the staff who NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1384 1 feels they wish to answer that question, feel free to.
2 MR. SCARBROUGH: Well, in the power uprate 3 license condition, we require three consecutive 4 inspections to look for any cracking that might occur 5 from a fatigue, or any type cracking. But they had to 6 do three full inspections, and that was the license 7 condition that we had.
8 JUDGE WARDWELL: So to translate that 9 indirect answer, you believe a time frame over which 10 three inspections could take place would be sufficient 11 to comfort the staff that fatigue -- that the stress 12 loads are below the endurance limits if there's no 13 fatigue cracking.
14 MR. SCARBROUGH: Yes. And then you go 15 into the long-term program after that, like the SIL, 16 more graded approach. But every outage, the first 17 three they have a look, and then after that they go 18 into something, a longer -
19 JUDGE WARDWELL: Under the current steam 20 dryer management program, Rev. 3, steel trap mind, 21 what action would take place if, in fact, some fatigue 22 cracking is observed over the next two cycles? So 23 there's two more cycles left to go. Right? They've 24 done one.
25 MR. SCARBROUGH: Yes, sir. That would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1385 1 initiate an engineering evaluation of what the source 2 of that fatigue crack was, because they should not be 3 seen. And if they did, they would have to evaluate 4 that before they started the plant back up. They need 5 to determine what that was, see if they need to do 6 repairs in the dryer. And it would reopen that whole 7 question,. because they should not be seeing any 8 fatigue-type cracks. And if they did, that would open 9 up-10 JUDGE WARDWELL: Have you reviewed the 11 2006, is it, results, refueling outage 26?
12 MR. SCARBROUGH: 2007?
13 .JUDGE WARDWELL: Yes, 2007, the most 14 recent.
15 MR. .SCARBROUGH: Yes, the most recent one.
16 Yes, they presented those to a team of staff and our 17 consultants, and we looked through all of those, and 18 discussed those with them, and the NRC staff decided 19 that there was no significant issues, and there were 20 the small little things that they saw. But it was 21 very typical. You see that typical when you do steam 22 dryer inspections, there was nothing there that showed 23 any type of fatigue related to a power uprate.
24 JUDGE WARDWELL: Okay. Did the staff have 25 any concerns with regards to the statement that this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1386 1 draft condition report that stated "fatigue cracking 2 at these locations of inter-granular stress corrosion 3 cracking cannot be ruled out." Did that create any 4 concerns for the staff?
5 MR. SCARBROUGH: No. From the 6 discussions, we do not have a concern with that. And 7 from the final decision, that there was nothing 8 significant going on in terms of the discussion.
9 JUDGE WARDWELL: The discussions you had 10 were similar to what was presented to this Board this 11 afternoon -
12 MR. SCARBROUGH: Yes, sir.
13 JUDGE WARDWELL: -- in regards to the -
14 MR. SCARBROUGH: They would go through 15 every indication, and the staff would look at them, 16 and discuss them with the licensee.
17 JUDGE WARDWELL: Turning to Entergy, I 18 assume you agree that certainly no more than three are 19 needed. Is that correct?
20 MR. SCARBROUGH: Yes, sir.
21 JUDGE WARDWELL: You may take an even more 22 liberal position, but you certainly don't feel more is 23 needed.
24 DR. HOPENFELD: Could I continue in part 25 to answer your question.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrQross.com v
1387 I JUDGE WARDWELL: I thought you answered 2 it.
3 DR. HOPENFELD: Well, I didn't really 4 complete it.
5 JUDGE WARDWELL: You answered to my 6 satisfaction. Go ahead.
7 MR. HOFFMAN: I didn't give a complete 8 answer, -because if there was a simple answer to your 9 question, sir, then I don't think that GE would be 10 considering instrumenting their dryer and the steam 11 lines at the same time in their advanced reactor on 12 their prototype, because they may have a different 13 design. I'm not familiar with the design. But the 14 issue that was brought up about loose parts can be 15 there, no matter what the design, and I was going to 16 get to there, but I -
17 JUDGE WARDWELL: Thank you. Dr.
18 Hopenfeld, in your engineering experience, 19 specifically outside of the nuclear field, if you have 20 any interactions with other engineers or understand 21 what they do, if you ever heard of monitoring for 22 stress conditions as a tool to evaluate the 23 performance to insure it's consistent with design of 24 an engineered facility.
25 DR. HOPENFELD: Well, one of them -- I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
1388 1 think probably a lot of them, I know -- I think it 2 should be here for the University of Vermont had a 3 fiber optic program for installing fiber optic cables, 4- fiber optic monitors to monitor fatigue and structure 5 integrity. That's one sense. The problem is that the 6 number of places these people -- really, that's very 7 important. But that's one, done on a large industrial 8 basis.
9 JUDGE WARDWELL: Thank you. Dr. Hoffman, 10 can I refer you to NEC JH-63 at 34, and I think it's 11 in relationship to ACRS questioning.
12 DR. HOPENFELD: Are you talking to me?
13 JUDGE WARDWELL: No, no, I'm sorry. Mr.
14 Hoffman. We have way too many H witnesses.
15 MR. HOFFMAN: Could you repeat the page 16 for me, sir?
17 JUDGE WARDWELL: 63.
18 MR. HOFFMAN: Yes.
19 JUDGE WARDWELL: At 34.
"20
ý' MR. HOFFMAN: 34.
21 JUDGE WARDWELL: I hope I don't surprise 22 myself.
23 DR. HOPENFELD: What page?
24 JUDGE WARDWELL: I've got to find it now.
25 I've got the wrong reference. Dr. Hopenfeld, do you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1389 1 know where your JH-63, where I would find JH-63 again?
2 DR. HOPENFELD: Well, maybe Marcia -
3 JUDGE WARDWELL: Here it is. I got it.
4 It's attached to the rebuttal, the June 6 h rebuttal.
5 JUDGE KARLIN: We've got it, Marcia.
6 JUDGE WARDWELL: At page 34.
7 MR. HOFFMAN: Thirty-four?
8 JUDGE WARDWELL: Strike that question 9 entirely. I see this has been redacted. It's not 10 crucial.
11 As a general comment, while I think of it, 12 especially I think for tomorrow so I don't forget 13 tomorrow when we start NEC-4, I'm sure Entergy is 14 aware of that, but if we start getting into 15 proprietary questions accidentally, I'm sure you will 16 notify us. Good. Thank you very much. We would 17 appreciate the help with that, because we're liable to 18 get excited, and get on a roll, and not realize where 19 we are.
20 Dr. Hopenfeld, besides stress levels on 21 the steam dryer, are there any other parameters that 22 you think should be added to the monitoring program 23 that would practically, and -
24 DR. HOPENFELD: The steam lines.
25 JUDGE WARDWELL: That would be of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1390 1 practical use, and significantly improve the aging 2 management of that -
3 DR. HOPENFELD: I don't think so.
4 JUDGE WARDWELL: Thank you. Continuing on 5 with NEC JH-63, page 24, either Mr. Hoffman or Mr.
6 Lukens, whoever feels interested in responding to 7 this, Dr. Hopenfeld presents a quote from the PNL, 8 Pacific Northwest National Labs that says under Answer 9 36 on that page, "Unlike the previously discussed 10 mechanism (corrosion) vibration fatigue does not lend 11 itself to periodic in-service examinations, 12 volumetric, surface, et cetera, as a means of managing 13 this degradation mechanism." And he goes on to then 14 quote, "Once a crack initiates, failure quickly 15 follows."
16 What's your reaction to that statement by 17 the National Lab in regards to -
18 MR. LUKENS: Your Honor, I would like to 19 put that statement in the context of the document from 20 which it was quoted.
21 JUDGE WARDWELL: Please do.
22 MR. LUKENS: The title of the document is 23 "Life prediction and monitoring of nuclear power plant 24 components for service-related degradation", and it 25 discusses at some length the methods used by the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1391 1 nuclear industry to address aging effects in power 2 plant components.
3 The quote that Dr. Hopenfeld provided in 4 his exhibit, page 62 of the document from which it 5 comes, it is page 4 of the exhibit.
6 JUDGE KARLIN: Which exhibit number are we 7 talking about now? I mean, for the record, I'm lost.
8 MR. LUKENS: This is NEC JH-69.
9 JUDGE KARLIN: Okay. Thank you. I'm 10 sorry.
11 MR. LUKENS: In the first-hand column 12 about halfway down there's a paragraph entitled, "High 13 cycle mechanical vibration fatigue." And it states, 14 and I quote, "More and more attention has recently 15 been paid by operating plants to prevent unexpected 16 piping failures due to high cycle vibration fatigue.
17 Small bore pipe, less than one inch nominal pipe size, 18 socket welded vent and drain connections in the 19 immediate proximity of vibration sources tend to be 20 most susceptible to this failure mechanism." The next 21 sentence is the one Dr. Hopenfeld quoted, so this 22 paragraph is talking about socket welded vent and 23 drain connections less than one inch in power plants.
24 This statement has nothing to do with steam dryer in 25 boiling water reactors.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealraross.com v * ... .
1392 1 JUDGE WARDWELL: Dr. Hopenfeld, how do you 2 extrapolate this particular statement to a steam dryer 3 and boiling water reactor at Vermont Yankee?
4 DR. HOPENFELD: I don't think this 5 statement used strictly for that very specific welding 6 of piece of equipment. Looking at physically, it was 7 stated before, they want you to get a fatigue drawing 8 with those very facts, and to draw in between the time 9 that you have inspected. It's not restricted to that 10 particular thing. There's nowhere there it's -- this 11 was an example. Even forgetting about that, just 12 going to the mechanism of particular observation, and 13 I think in the context, if you really want to say, I 14 think there's somewhere in that paper where PNL says 15 well, you can spend most of your life in indication of 16 fatigue, you can spend most of your life in initiation 17 process, but once it gets started, it goes. So I 18 don't think that's really restricted to that. It was 19 written in that context, but -- I mean, that 20 paragraph, that's not restricted -
21 JUDGE WARDWELL: I don't have the 22 reference in front of me, and rather than take the 23 time to get it, maybe you can lead to this. I know 24 there's testimony in it, but this is directed to, I 25 think, Mr. Hoffman, would be the best, if my NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1393 1 recollection is correct, to describe, if you could, 2 the qualifications of the individuals that will be 3 assessing the results of the parameters that you are 4 monitoring for, and the qualifications of the people 5 that are making decisions to verify that, in fact, you 6 are having qualified people in that management program 7 that is driving it.
8 MR. HOFFMAN: As I stated earlier, just 9 for a basis, if the off and on procedure requires an 10 engineering evaluation, it gets sent to the 11 engineering organizations. All of the engineers at 12 Entergy, in order to perform independent work, need to 13 be qualified to do that work. And they're qualified 14 through a prescribed Institute of Nuclear Power 15 Operations INPO Engineering Support Personnel ESP 16 Training Program that prescribes the training 17 methodology, the kind of training they need, the 18 experience they need before they can work 19 independently. In addition to having that training, 20 they need to have their supervisor sign off that they 21 have properly completed the training, and that they 22 have performed the work under the guidance of someone 23 else, and the supervisor is satisfied with the level 24 of the work that's performed.
25 We also have, as part of our training NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1394 1 program, an annual -- as a minimum, an annual 2 assessment by the engineer and his supervisor. if 3 either one of- them feel that there particular job 4 responsibility require additional training or if 5 something has developed in the industry where they 6 feel they need this training to do their job properly, 7 it's put into the training program. It's part of 8 their performance evaluation to get that training, and 9 have that training executed. The training program 10 itself is, I believe it's a triennial basis, but INPO 11 comes in and audits our training program. *And it's 12 very extensive, having been through it, a very 13 thorough detailed assessment of the quality of the 14 training program to insure that personnel are 15 qualified to do their job.
16 The industry, in general, Entergy, in 17 particular, takes it very seriously that unqualified 18 personnel do not perform safety-related work. People 19 need to meet the qualifications to do the work.
20 JUDGE WARDWELL: From the NRC staff, Mr.
21 Rowley, or Hsu, or Scarbrough, whoever feels in the 22 best position to answer this, have you reviewed their 23 qualification program, and determined that, in fact, 24 yes, it does meet your - I think at one point you use 25 the phrase "the need for a qualified structural NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1395 1 engineer, for instance, to assess some of this 2 information, if my memory is correct. But are you 3 satisfied that that training program is going to meet 4 the level of expertise needed to evaluate the data 5 associated with this aging management program?
6 MR. HSU: Yes.
7 JUDGE WARDWELL: Would you speak a little 8 louder?
9 MR. HSU: Yes.
10 JUDGE WARDWELL: You have reviewed it, and 11 you have determined that it does meet your -
12 MR. HSU: It's not a review. Okay.
13 Because this thing is part of the aging management 14 program audit, and I remember the first time that 15 qualification issue come out is when we're doing the 16 Entergy's so we know there's a program, they do have 17 the qualification. We asked if they're doing the 18 inspection, and then what is it their personnel 19 qualification. They do have program. I think in the 20 -- that what's there. Now for this specific plan, we 21 did not probably specifically look at that. According 22 to our experience with Entergy, we do know they do 23 have this program. They do have the personnel 24 qualification program.
25 JUDGE WARDWELL: And why did you not look NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neairgross.com
1396 1 at it for this specific program? Is that what you 2 just said, that you did not look at it specifically 3 for Vermont Yankee?
4 MR. HSU: Yes, because that's probably the 5 -- because all activity be limited when we go -to the 6 audit. We only have probably around eight days, so 7 all this program is going to be audited by the last 8 year's resident inspector, and they are going to 9 implement all this site activity.
10 JUDGE WARDWELL: Okay. Thank you.
11 MR. ROWLEY: Yes, that's something we 12 don't look at directly in license renewal. That's not 13 part of what we do, but NRC, other aspects of NRC 14 looks at that, but not license renewal.
15 JUDGE WARDWELL: And is that because you 16 believe it's part of ongoing operations, and is a 17 continuation of that through the renewal period that 18 you don't? Why wouldn't you, specifically as relating 19 to the aging management plan, you have to evaluate the 20 adequacy of that in regards to demonstrating that it 21 can achieve the results of Part 54.
22 MR. ROWLEY: These inspections are 23 something they have to do now, not wait until they get 24 to license renewal, so that's a current operating 25 thing. By the time we get to license renewal, it's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealraross.com
1397 1 already set, and we don't look at it.
2 JUDGE WARDWELL: Okay.
3 JUDGE KARLIN: I have one.-
4 JUDGE WARDWELL: I did not mean to tell a 5 lie. I've got one more, then..I want to add a note to 6 get back to something. This was something you 7 mentioned, Dr. Hsu, and it was a conversation between 8 Mr. Scarbrough - not a conversation, it was an 9 iterative stepping that we went through between Mr.
10 Scarbrough, who reviewed lots of this information in 11 regards to .the steam dryer associated with the power 12 uprate, and then Mr. Hsu, who's reviewed it, as I 13 understand it, for the extended period of operation.
14 And it dealt with our discussions of the design-basis 15 accident, and the need to demonstrate that the steam 16 dryer can maintain its integrity during that. And you 17 said, Mr. Scarbrough, I believe, that you did review 18 it for the power uprate and found it to be adequate in 19 regards to Entergy's review of that effort. Is that 20 correct?
21 MR. SCARBROUGH: The NRC staff team did, 22 as indicated in the safety evaluation for that power 23 plant.
24 JUDGE WARDWELL: And you're familiar with 25 it, and you stand by that in representing the staff.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1398 1 MR. SCARBROUGH: Yes, sir.
2 JUDGE WARDWELL: And, Mr. Hsu, you 3 mentioned that you did not do that as a license 4 renewal.
5 -MR. HSU: Yes, we did not do. The aging 6 management program is look at it from the inspection 7 and the monitoring point of view. But inspection 8 point of view, we try to detect something, so if 9 anything happen between the inspection period, the 10 monitoring program is going to tell you what's going
.11 to happen, so that's supplemental that your inspection 12 activity. So we concentrate in this area.
13 JUDGE WARDWELL: And the reason that you 14 didn't -- part of the reason that you didn't look at 15 the integrity of the steam dryer in regards to a 16 design-basis accident is, again, back to the fact that 17 it's an operational issue that has been reviewed by 18 Mr. Scarbrough, and that same analysis will take 19 place, as long as the steam dryer maintains its 20 integrity, and you've got a monitoring program, a 21 management program, I should say, for aging, which you 22 feel is satisfactory to help assure that that steam 23 dryer maintains its integrity.
24 MR. HSU: Yes.
25 JUDGE WARDWJELL: I think I understand that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www~nealrgross.com
1399 1 now. Thank you. Now I'm done.
2 JUDGE KARLIN: Okay. I think I need to 3 ask, or clarify and understand one final point, and 4 then we'll probably be done, and take a break.
5 Because I think I'm over-simplified, or my 6 understanding was over-simplified with regard to the 7 dichotomy between whether the monitoring program is 8 there for a prediction purpose, or for detection 9 purpose. And it's apparently not quite as simple as 10 that.
11 Can I direct Mr. Hoffman to the testimony 12 that you gave on your pre-filed exhibit at page 28, 13 Question 53, Answer 53. And probably when I'm done, 14 and this hopefully won't take too long, then I will 15 ask Mr. Hsu and Mr. Rowley, perhaps, their thoughts on 16 this. And this is the prediction/detection question 17 I was over-simplifying before, I think.
18 Question - "Dr. Hopenfeld states that 19 moisture monitoring only indicates that a failure has 20 occurred. It does not prevent the failure from 21 occurring." And you're asked a question about that, 22 and you state, and this sentence is one I need to 23 focus on. "Monitoring of plant parameters will not 24 predict the incipient formation of cracks, but it will 25 identify the existence of cracks sufficiently large to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1400 1 adversely affect dryer performance, and flag the risk 2 of structural failure of the dryer."
3 So, as I understand it, everyone is in 4 agreement that monitoring of the plant parameters 5 isn't going to predict the cracks. Mr. Hoffman?
6 MR. HOFFMAN: Yes, sir.
7 JUDGE KARLIN: But it will detect cracks.
8 Is that what you're saying here? "Identify the 9 existence of a crack sufficiently large to adversely 10 affect dryer performance."
11 MR. HOFFMAN: If one was developing 12 sufficiently large, you might be -- you would detect 13 it through the monitoring, the online monitoring 14 program.
15 JUDGE KARLIN: You might, you would?
16 MR. HOFFMA: No, if-it was sufficiently 17 large -
18 JUDGE KARLIN: Sufficiently large, you 19 would. "Sufficiently" is the operative word.
20 MR. HOFFMAN: That's correct.
21 JUDGE KARLIN: Okay. And then it says -
22 and so what good is that, detecting the -
23 "sufficiently large to adversely affect dryer 24 performance." And then the next phrase, "And flag the 25 risk of structural failure of the dryer. Flag the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1401 1 risk." So is it predicting, is that a predictive 2 function then? When you say "flag the risk", you mean 3 it's telling us what's going to happen in the future, 4 giving us an indication.
5 MR. HOFFMAN: Not predictive in the sense 6 of say predictive maintenance. What .I was trying to 7 say there was that -
8 JUDGE KARLIN: It's giving us an early 9 warning as you say at the bottom of this page.
10 MR. HOFFMAN: It's indicative of something 11 is changing in the dryer to affect its performance, 12 and based on our monitoring to date, and we're talking 13 right now, even though we are executing the same 14 program -
15 JUDGE KARLIN: No, no, no. I don't want 16 the monitoring to date, I want the monitoring of plant 17 parameters. You're saying that it will detect cracks 18 sufficiently large that will predict the risk of 19 structural failure.
20 MR. HOFFMAN: Yes. What I'm saying is that 21 this program which goes into place following 2012, 22 will have built on the operating experience that we're
.23 seeing now between 2006 and 2012, the EPU conditions, 24 demonstrations to-date by the inspections, and what we 25 certainly anticipate and expect by the future NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1402 1 inspections betwvýeen now and 2012, we'll see that we 2 don't have a high cycle fatigue phenomena going on on 3 the dryer, so anything is developing, it's very slowly 4 developing. It will give us time to, if we see these 5 parameters starting to change, it's not going to be 6 this very rapid propagation for failure, because we 7 don't have that mechanism. And, therefore, it would 8 give us time to respond, to shut the plant down. It's 9 not a case of -- you wouldn't see the moisture go up 10 today and tomorrow have the dryer fail. That's what 11 I was trying to say, so it's not going to predict the 12 failure, but it says something is going on. You need 13 to take a look at it. And the length of time for it 14 to develop beyond where it is is sufficiently long 15 that our procedure would enable us to perform those 16 evaluations and shut the plant down, if necessary.
17 JUDGE KARLIN: okay. Then the first 18 sentence, 'And flag the risk of structural failure of 19 the dryer. "What do you mean by "structural failure"?
20 Let me ask this more specifically. Would the breaking 21 off of a chunk, say six by six inches, qualify as 22 structural failure of the dryer?
23 MR. HOFFMANJ: In my terminology for here, 24 the dryer is intended to be nominally a cylinder all 25 in tact, and a structural failure would be a loss of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1403 1 that in-tactness, so to speak, of the dryer.. It could 2 be.a piece coming out, it could be -
3 JUDGE KARLIN: All right. So if a six 4 inch piece comes off the dryer, is that a structural 5 failure of the dryer?
6 MR. HOFFMAN: In this terminology, yes.
7 I'm sorry.
8 JUDGE KARLIN: We're not talking about a 9 total collapse of the dryer or something.
10 MR. HOFFMAN: No. The piece is no longer 11 the same piece it was before it started.
12 JUDGE KARLIN: Okay. I think that's 13 probably good enough. I don't need to ask the staff 14 on this one. Thank you.
15 I think we are going to take a break at 16 this point and review our notes to see if there's any 17 questions we think we have missed, or maybe need to 18 follow-up on. This is where we have the time when 19 parties will have the opportunity to give us 20 suggestions as to questions that they think we've 21 missed, or would counsel that we ask, and so we'll do 22 the same procedure as we did before.
23 It is now -- let me ask, do the parties 24 think that they have some questions that may be 25 wanting to ask us to propound?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1404 1 MR. RAUBVOGEL: Yes.
2 JUDGE KARLIN: All right.
3 MS. BATY: Possibly.
4 JUDGE KARLIN: Possibly. All right. Why 5 don't we take a -- Entergy?
6 MR. LEWIS: No.
7 JUDGE KARLIN: No, you probably don't.
8 All right. -Well, I'm not holding you to it, but okay, 9 just an indication. That's good enough to tell me.
10 Why don't we take a 15-minute break, and reconvene at 11 10 after the hour. And at that time, you can submit -
12 - well, are you going to submit them to us in writing?
13 MR. RAUBVOGEL: We were planning to.
14 JUDGE KARLIN: NRC staff? And during the 15 15 minutes, or how much time do you need?
16 MR. RAUBVOGEL: We need 10 minutes or so, 17 and then we can give them to you typewritten and 18 ready.
19 JUDGE KARLIN: All right. Well, maybe we 20 ought to extend the break a little bit longer so we 21 can read them and digest them, as we did before.
22 Vermont, do you all have anything, Ms. Hofmann?
23 MS. HOFMANN: We actually gave them to 24 NEC.
25 JUDGE KARLIN: Oh, that's right. That's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1405 1 what you all did' yesterday. And, Mr. Roth, do you 2 think you have anything?
3 MR. ROTH: Yes, I have a few.
4 JUDGE KARLIN: Okay.. Well, why don't we 5 make it 20 minutes, during, which time if you have 6 written questions, and you can get them to us during 7 the 20 minutes, please get them to the law clerks, and 8 we'll try to look at them, and reconvene. Three 9 copies, if possible. Yes, sir?
10 MR. TRAVIESO-DIAZ: Are we going to get to 11 Contention Four today?
12 JUDGE KARLIN: It somewhat depends -- we 13 may very, well get to some of Contention Four. It 14 depends on what kind of questions we get, or what we 15 think we may need to ask. I think it's a pretty good 16 bet that we'll at least -- I think our theory would be 17 we at least want to swear the witnesses in, and get 18 the exhibits out on the table, and get that procedure 19 done today, if nothing more than that, so we could hit 20 it fresh in the morning. Okay? So we'll take a 20-21 minute adjournment.
22 (Whereupon, the proceedings went off the 23 record at 2:58 p.m., and went back on the record at 24 3:32 p.m.)
25 JUDGE KARLIN: On the record. We're now NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neatrgross.com
1406 1 back in session. I would like to go back on the 2 record and remind the witnesses you're still under 3 oath.
4 We've received some questions from several 5 of the parties. May I ask? Are there any of the 6 parties that want to offer questions orally at this 7 time?
8 (No verbal response.)
9 Okay. So we'll just deal with the ones 10 that were submitted in writing. And as we proceed, I
.11 think I'll just give you anticipation of our hope for 12 the reminder of the afternoon. It's about 3:30 p.m.
.13 right now. We will go through these questions 14 hopefully relatively crisply and then thank the 15 witnesses on Contention 3 and our thought is to make 16 as much progress as we can on Contention 4 today as 17 well and the thought being we would ask for the 18 Contention 4 witnesses to be brought forward, to be 19 sworn in and ask the counsel to introduce the 20 associated exhibits for each of them and then also to 21 have the presentation by Dr. Horowitz, his 12 slides 22 or whatever it is that we asked for and I think that 23 will take us up to 5:00 p.m. and we'll be done for the 24 day and then we can start crisply in the morning 25 tomorrow and may be able to finish tomorrow. That's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1407 1 the idea.
2 Dr. Horowitz is available to do that?
3 (No verbal response.)
4 Great. Okay. So any other questions or 5 points at this time?
6 (No verbal response.)
7 All right. . Then we have some follow-up 8 questions for the panel. (Aside.) Do you want to go 9 first? Okay. Let me ask a question.
10 JUDGE REED: If you're not ready, I'll go.
11 JUDGE KARLIN: No, I think I'm ready.
12 This is for -- Again, I'm not sure who it's for, but 13 I'm going to ask it of two parties, one NRC Staff, Mr.
14 Scarbrough and Mr. Hsu, Mr. Rowley, whatever. If you 15 believe that there were a higher chance of a crack 16 occurring in the steam dryer than you currently 17 believe, would you have a different monitoring or 18 inspection program? If, for example, you were not 19 sure about the -- Well, would you change anything?
20 Mr. Scarbrough.
21 MR. SCARBROUGH: Yes. The information I 22 was provided by the Licensee as part of power uprate 23 with the review of the Staff and its consultants 24 reached their assurance findings that. the stresses 25 were below the fatigue limits and part of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1408 1 conditions of that were to evaluate the uncertainties 2 and we were comfortable with that. However, because 3 of the past occurrence at Quad Cities, we wanted to be 4 doubly sure that we had a very robust monitoring and 5 inspection program and that's what you see in the 6 license conditions that were imposed. I mean, there 7 was a very slow and deliberate power ascension that 8 took place and I was a member of that team that 9 monitored it as it went Up.
10 JUDGE KARLIN: Let me cut through it. The 11 power ascension program with regard to the EPU, it's 12 occurred. You all are having some reliance upon the 13 confidence that is gained from that. If you were not 14 so confident about the iVibration (phonetic), you 15 know, that program, would you change anything about 16 the ongoing monitoring program?
17 MR. SCARBROUGH: And the answer to that is 18 if we weren't confident in the evaluation we would not 19 have granted the power uprate.
20 JUDGE KARLIN: I'm positing something 21 which is different which is if you weren't that 22 confident would you have done something different.
23 MR. SCARBROUGH: Yes. I would imagine if 24 there was some additional areas that we might have 25 decided that we had needed for a series of inspections NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., NW.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1409 1 during outage, I mean, we could have done something 2 like that. We could have added another one, I guess.
3 If there was some sort of small amount of additional 4 uncertainty, you might have added another inspection 5 in terms of series of outage. We might have.
6 But in terms of what was done, in terms of 7 having a repetitive inspection process, where you did 8 a full inspection based on the GE SIL documents 644.
9 JUDGE KARLIN: Okay. I think you answered 10 the question.
11 Another question for the Staff, I'll focus 12 on Mr. Scarbrough I guess. We talked about the GE Sil 13 644.
14 MR. SCARBROUGH: Yes.
15 JUDGE KARLIN: Is a part of Vermont 16 Yankee's current licensing basis only via the steam 17 dryer monitoring plan Revision 3?
18 MR. SCARBROUGH: It's part -- It was part 19 of the license conditions for the EPU and the license 20 amendment that was granted in March of 2006.
21 JUDGE KARLIN: And that was the steam 22 dryer monitoring plan, was it not?
23 MR. SCARBROUGH: Right.
24 JUDGE KARLIN: So is that the only way 25 that SIL 644 gets into the current licensing basis as NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1410 1 part of the steam dryer monitoring plan that was 2 imposed on the EPU?
3 MR. SCARBROUGH: I would assume so. I'm 4 not familiar with all the other possible --
5 JUDGE KARLIN: Maybe I'll ask Mr. Hsu. Is 6 there any -- Are you aware of any other way that that 7 SIL 644 gets into the current licensing basis?
8 MR. HSU: I'm not aware of it. I think 9 that's the correct way.
10 JUDGE KARLIN: All right. Mr. Rowley.
11 MR. ROWLEY: It is -- If there's any other 12 way, I'm not sure. But the current license does 13 specifically state that 644 --
14 JUDGE KARLIN: Right. Mr. Lukens, perhaps 15 you know or could answer that question please.
16 MR. LUKENS: I'm only aware of the 17 connection between 644 and our current licensing basis 18 through the license condition that currently exists as 19 a --
20 JUDGE KARLIN: All right. Thank you. I 21 have a couple- mole here. This is a question for Mr.
22 Scarbrough or whoever else on the Staff feels it's --
23 We talked about the BWR VIP-139 Program and you talked 24 about it might be approved by NRC sometime this year, 25 Mr. Scarbrough.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrQross.com
1411 1 MR. SCARBROUGH: Yes.
2 JUDGE KARLIN: Okay. And let's say that 3 it is approved by the NRC and Vermont Yankee ýsays it's 4 unacceptable and they take exception to some part of 5 it. Will there be an opportunity for public 6 participation when that event occurs?
7 MR. SCARBROUGH: At's part of the license 8 condition power uprate, it does specify that the steam 9 dryer monitoring plan incorporates the SIL 644 10 Revision 1. So that's part of their steam dryer 11 monitoring plan. If they decided not to follow the 12 VIP-139 or they were making changes, I would imagine 13 what might happen would be a public meeting between 14 the NRC Staff and the Licensee to discuss what their 15 proposal.
16 Becausetypically what we do when we have 17 for the steam dryer issue, we'll have public meetings 18 with the licensees and they'll describe what they plan 19 to do. So that's where there would be some public 20 participation in that.
21 JUDGE KARLIN: So the scenario is NRC 22 approves 139 and Entergy takes exception to 139 and 23 the opportunity for public input as to whether that 24 exemption should be granted is what, if anything?
25 MR. SCARBROUGH: I don't believe there is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1412 1 any direct input in terms of a comment period of 2 things of that nature unless there was --
3 JUDGE KARLIN: So there is no opportunity 4 for public input or comment on whether the exemptions 5 should be granted.
6 MR. SCARBROUGH: Other than to a public 7 meeting where there might be public risk involved.
8 JUDGE KARLIN: Is there a public meeting 9 where the Staff and the Applicant have a talk?
10 MR. SCARBROUGH: Yes.
11 JUDGE KARLIN: And does Public get to ask 12 questions?
13 MR. SCARBROUGH: At the end, typically 14 they'll be allowed to raise questions.
15 JUDGE KARLIN: Will there be an 16 opportunity for -- Will a notice for opportunity for 17 hearing be issued on whether or not that exemption 18 should be granted?
19 MR. SCARBROUGH: I'm not aware of any.
20 JUDGE KARLIN: And you think not?
21 MR. SCARBROUGH: I think not.
22 MS. BATY: They said there wouldn't be an 23 exemption because it's not a regulation. It would be 24 -- Depending on what they're doing, it could be 25 license amendments.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1413 1 JUDGE KARLIN: All right. Thank you.
2 MS. BATY: But it wouldn't technically be 3 an exemption.
4 JUDGE KARLIN: Okay. The terminology.
5 MS. BATY: The -terminology just to be 6 clear on that.
7 JUDGE KARLIN: Would this be an exemption 8 under 50.13?
9 MS. UTTAL: No. An exemption would be 10 from the regulations. So if they were seeking -- on 11 regulations, then 50 would be appropriate.
12 JUDGE KARLIN: Thank you. So I think the 13 terminology was used that they take exception to it.
14 So thank you. That's helpful. But the bottom line is 15 whatever the event is there will be no opportunity 16 for, no notice of opportunity, to request a hearing on 17 that by the public.
18 MR. SCARBROUGH: As far as I know, that's 19 correct.
20 JUDGE KARLIN: Will the Staff 21 determination on whether or not to grant Entergy an 22 exception from 139 be appealable to the Commission by 23 the public, a member of the public?
24 MR. SCARBROUGH: I don't know really the 25 normal process. I mean, there are requests in some NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1414 1 areas and things of that nature. I guess it goes to 2 that process because I'm not --
3 JUDGE KARLIN: All right. Thank you.
4 JUDGE REED: Okay. I've tried to organize 5 these a little bit, but there are questions that are 6 kind of scattered. I'll start with this one.
7 I guess this would be addressed probably 8 to Mr. Lukens. After the 2003 BWR 3 event, and I 9 presume that's the Quad Cities event.
10 MR. LUKENS: Yes sir.
.11 JUDGE REED: A number of corrective 12 actions were taken to fortify the steam dryer. How 13 did Vermont Yankee perform similar corrective actions?
14 MR. LUKENS: I have as an exhibit the RAI 15 that was submitted as part of our license renewal 16 process. Okay. I've nearly misspoke. It's an RAI 17 that came from an EPU application and what it contains 18 in part is a table that showed the modifications we 19 proposed to do initially and then the modifications we 20 did ultimately. And this is Exhibit --
21 JUDGE REED: Could you simply summarize 22 the results of that examination?
23 MR. LUKENS: The results are that we 24 either did what we said we would do earlier or we did 25 more than that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1415 1 JUDGE REED: Okay. But can you tell us 2 what actions were taken?
3 MR. LUKENS: We replaced the vertical 4 sections of hood, the reinforcing vessels in that 5 vertical section. We replaced end plates. We 6 replaced high bars.
7 JUDGE REED: And when you replaced them 8 did you replace them with an identical component of 9 new or were they -- in some way?
10 MR. LUKENS: No, they were not identical.
11 All of them were made more robust. For example, in 12 the vertical hood, we replaced one quarter inch 13 material to 5/8ths and we replaced, if I may, little 14 bitty reinforcing gussets with full lengthwise. That 15 was part of the experience that came out of the 2003 16 event. They had clipped these gussets in the Quad 17 Cities' dryer, but they weren't full length and it 18 turned out that a couple of gussets became in stress 19 range. So informed by that information, we changed 20 them out.
21 JUDGE REED: Now does this run from bottom 22 to top or are we talking -- I'm not sure.
23 MR. LUKENS: They run from the bottom of 24 the vertical hood to the top of vertical hood.
25 JUDGE REED: The top of the vertical hood.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1416 1 MR. LUKENS: They're on the order of four 2 feet high.
3 JUDGE REED: Thank you.
4 MR. LEWIS: Judge Reed, do you want to 5 witness to identify the location of this. It is an 6 exhibit.
7 JUDGE REED: it is an exhibit?
8 MR. LUKENS: Yes sir.
9 MR. LEWIS: Yes.
10 JUDGE REED: Yes, if it's an exhibit, 11 please.
12 MR. LUKENS: It's Exhibit E3-04-VY.
13 JUDGE REED: Thank you.
14 MR. LUKENS: Its title is "Attachment 2 to 15 Vermont Yankee Nuclear Power Station Proposed Tech 16 Spec Change NO. 263, Extended Power Uprate Supplement 17 No. 8, Response to Request for Additional 18 Information. " And given a few minutes, I can tell 19 what page that's on.
20 JUDGE REED: I think that's okay. I think 21 we can locate it with what you've given us. We're not 22 going to take the time to look it up here today.
23 Any other changes that were made?
24 MR. LUKENS: The table in this exhibit 25 captures all the modifications that were made for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1417 1 Vermont Yankee steam dryer.
2 JUDGE REED: Okay. If it's in the record, 3 we will look it up.
4 MR. LUKENS: Right.
5 JUDGE REED: Thank you for identifying 6 that.
7 So this is a -- I think you've answered 8 this question, but I'm going to ask it just to make 9 sure. What modifications did you make to steam dryer 10 prior to EPU and I think this is --
11 MR. LUKENS: Those 2004 modifications were 12 the EPU-related modifications.
13 JUDGE REED: Okay.
14 JUDGE REED: Another question again for 15 you, Mr. Lukens. Can Entergy inspect the dryer 16 whenever the plant shuts down such as a parameter 17 accedence shutdown? So if the plant shuts down for 18 whatever reason, can you inspect the dryer?
19 MR. LUKENS: Typically, on a shutdown that 20 occurs on some simple event, and parameter accedence 21 is an example of one of those, we never enter primary 22 containment. We never take a head off of a reactor 23 vessels. So the answer to that would be no. It would 24 not be practical.
25 JUDGE REED: So in order to inspect, you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1418 1 have to take the head off the vessel.
2 MR. LUKENS: We have to take the head off.
3 We have to take the dryer out.
4 JUDGE REED: So it would not be practical 5 to do inspections on other than refueling cycles.
6 MR. LUKENS: That's correct.
7 JUDGE REED: I think that's the gist of 8 this question. Okay.
9 Now I have several questions that relate 10 to IGSCC. I'm not sure I have them in any particular 11 order. Can IGSCC cracking eventually result in sudden 12 breaking apart of steam dryer components? Again, for 13 you, Mr. Lukens.
14 MR. LUKENS: The real answer to that is 15 no. For an IGSCC crack to become a site for fatigue, 16 it has to be in a location where there is a cyclic 17 stress above the endurance limit and the location we 18 have identified IGSCC cracks are not in high stress 19 areas of the dryer. We have not found any indications 20 in the high stress areas of the dryer.
21 JUDGE REED: Thank you. In 2007 22 inspection that you spoke of, were there cracks that 23 could not be immediately classified as IGSCC and took 24 further evaluation?
25 MR. LUKENS: Yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
14.19 1 JUDGE REED: If so, what was the nature of 2 that further evaluation?
3 MR. LUKENS: There were -- I can think of 4 two different sets of indication that took us a day or 5 two to evaluate and this was not done simply by 6 Vermont Yankee. These indications because they're 7 captured on CD by a camera, that information, the real 8 time inspection data, was transmitted to structural 9 engineers at General Electric. These are the folks 10 who know as much about a steam dryer as anybody knows 11 and we worked with them to characterize, those 12 indications.
13 JUDGE REED: And the results came back.
14 MR. LUKENS: And the results came back 15 IGSCC.
16 JUDGE REED: IGSCC. Thank you.
17 And I have one last question and again I 18 think it's for you. Isn't Vermont Yankee switching 19 from an 18-month to a 24-month interval between 20 refueling outages and therefore inspections of the 21 dryer?
22 MR. LUKENS: I am 90 percent confident 23 that we are not. It's been investigated and my 24 current understanding is that it is somewhere between 25 unlikely and not possible that the current NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrqross.com
1420 1 configuration in the reactor vessel with the number of 2 control rods we have, the size core we have, that we 3 could control a 24-month cool.
4 JUDGE REED: Okay.
5 JUDGE KARLIN: Is there some intermediate 6 extension or is it 18 months into the future?
7 MR. LUKENS: I'm not aware of --
8 JUDGE KARLIN: We go to 20 months.
9 MR. LUKENS: -- intervals except 18 and 10 24.
11 JUDGE KARLIN: Okay.
12 JUDGE REED: That's all I have.
13 (Off the record discussion.)
14 JUDGE KARLIN: I think we have completed 15 our inquiries and questions related to Contention 3.
16 Again, our appreciation to the witnesses who spent a 17 lot of time preparing, submitting materials and then 18 being patient with answering our questions here, 19 especially mine here being the least technical of 20 everyone in this room probably.
21 But, anyway, thank you and you all may 22 step down now. We don't need you anymore. You may be 23 dismissed and thank you for your testimony.
24 What I'd like to do is ask the parties to 25 -- Yes, Mr. Raubvogel.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1421 1 MR. RAUBVOGEL: We would request that 2 questions that we submitted both yesterday and today 3 and any others be part of the record in the same 4 manner that our direct examination plan was submitted 5 to the Board just so that it's a part of the entire 6 record.
7 JUDGE KARLIN: I think that would be --
8 Any reaction from the other parties? Staff? Yes, I 9 think that's -- Sir?
10 MR. TRAVIESO-DIAZ: I believe that was 11 what was done in other nuclearproceedings. It was 12 put on the record at the end.
13 JUDGE KARLIN: Yes, I think that's right 14 and that's the appropriate thing to do. So what -- We 15 have handwritten questions from some of you and 16 actually we only have one copy of some of these 17 handwritten questions and I did want to remark that 18 whoever did these gets an A for penmanship.
19 (Laughter.)
20 MR. RAUBVOGEL: Would you like to provide 21 additional copies to the clerk?
22 JUDGE KARLIN: Yes. I don't know how we 23 can get an additional copy of this. Mr. Roth, for 24 example, this is your only copy. Right?
25 MR. ROTH: That's correct.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, DýC. 20005-3701 www.nealrgross.com
1422 1 JUDGE KARLIN: So I think we'll just have 2 to put these in the record after the record closes.
3 I think that's the appropriate time. We'll follow the 4 same procedure under the Reg. about putting these 5 questions .in with one exception, Mr. Raubvogel. We're 6 not going to ask SECY to put it on the electronic 7 hearing docket then until we're sure.
8 With that, you are all dismissed. Thank 9 you.
10 (Panel of witnesses excused.)
11 And if we could get -the witnesses for 12 Contention 4 up, we will have them sworn and introduce 13 their exhibits and then proceed to Dr. Horowitz's 14 presentation. Off the record.
15 (Whereupon, at 3:55 p.m., the above-16 entitled matter recessed and reconvened at 3:59 p.m.)
17 JUDGE KARLIN: All right. Can we go back 18 on the record, Mr. Reporter? Thank you.
19 The Atomic Safety Licensing Board is now 20 ready to begin consideration or the evidentiary 21 hearing portion of consideration of NEC Contention 4 22 and I see we have the witnesses sitting in the witness 23 box and so I will ask you all to rise please and raise 24 your right hand. Please stand and raise your right 25 hand.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1423 1 Whereupon, 2 CONTENTION 4 PANEL 3 were called as witnesses and, after having been first 4 duly sworn, were examined and testified as follows:
-. 5 JUDGE KARLIN: Thank you. Please be 6 seated.
7 Welcome. Now I will ask counsel for 8 Entergy to interrogate its witness so that we can 9 introduce the exhibits please.
10 MR. LEWIS: Thank you, Judge Karlin. I'm 11 going to direct these questions to Entergy's 12 witnesses, Mr. Horowitz and Mr. Fitzpatrick.
13 Gentlemen, do you have before you a 14 document bearing the caption in this proceeding 15 entitled "Testimony of Jeffrey S. Horowitz and James 16 C. Fitzpatrick on NEC Contention 4, Flow Accelerated 17 Corrosion" dated May 12, 2008?
18 DR. HOROWITZ: Yes.
19 MR. FITZPATRICK: Yes.
20 MR. LEWIS: Did you prepare this testimony 21 for this proceeding?
22 DR. HOROWITZ: Yes.
23 MR. FITZPATRICK: Yes.
24 MR. LEWIS: Do you have any corrections to 25 this testimony?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1424 1 DR. HOROWITZ: Yes.
2 MR. LEWIS: What are they please?
3 DR. HOROWITZ: On page 33, answer 49, 4 lines six and eight, -I believe the sentence that says 5 "The portion of this statement concerning elbows and 6 by extension other geometries, other than straight 7 pipe is incorrect."
8 MR. LEWIS: Thank you. For the record, 9 this is a duplicate of the leading-up prior statement.
10 So it's simply repeated or a redundant statement.
11 Copies have been given to the other parties and copies 12 of this corrected testimony has been given to the 13 court reporter.
14 JUDGE KARLIN: All right.
15 MR. LEWIS: With this correction, is this 16 testimony your true and accurate testimony in this 17 proceeding?
18 DR. HOROWITZ: Yes.
19 MR. FITZPATRICK: Yes, it is.
20 MR. LEWIS: I would move that this 21 testimony be moved into evidence as is read.
22 (Whereupon, the document 23 referred to was marked as 24 Entergy Exhibit E4-01 for 25 identification.)
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1425 1 JUDGE KARLIN: Any objections?
2 (No verbal response.)
3 Hearing none, it is admitted into 4 testimony.
5 (The document referred to 6 having been previously marked 7 for identification as Entergy 8 Exhibit E4-01, was received in 9 evidence.)
10 MR. LEWIS: At the same time, Entergy 11 moves to introduce Exhibits E4-02 through E4-43. These 12 are Entergy's exhibits that are referenced in the 13 testimony and relate to this contention. There was on 14 exhibit E4-08 which was missed three pages in the 15 copying. The copies have been given to the court 16 reporter and the parties now have the three missing 17 pages added. It was a fact reference booklet with 18 missing pages. We move those exhibits into evidence 19 at this time.
20 (Whereupon, the documents 21 referred to were marked as 22 Entergy Exhibits E4-02 through 23 E4-43 for identification.)
24 JUDGE KARLIN: Any objections?
25 (No verbal response.)
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1426 1 Hearing none, they're admitted.
2 (The documents referred to 3 having been previously marked 4 for identification as Entergy 5 Exhibits E4-02 through E4-43, 6 were received in evidence.)
7 Anything else, Mr. Lewis?
8 MR. LEWIS: That is it.
9 JUDGE KARLIN: Thank you. NRC Staff 10 please.
11 MR. SUBIN: I direct this to Mr. Hsu and 12 Mr. Rowley. Do you have before you the affidavit of 13 Kaihwa R. Hsu and Jonathan G. Rowley concerning NEC 14 Contention 4, Flow Accelerated Rate Corrosion and the 15 rebuttal to this contention?
16 MR. HSU: I do.
17 MR. ROWLEY: Yes.
18 MR. SUBIN: Did you prepare this testimony 19 for this proceeding?
20 MR. ROWLEY: Yes.
21 MR. HSU: Yes.
22 MR. SUBIN: Okay. Do you have any 23 corrections or additions of this testimony?
24 MR. HSU: Yes.
25 MR. SUBIN: Can you state that for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neatrgross.com
1427 1 record?
2 MR. ROWLEY: Corrections. On Question 21, 3 change "pease" to "please."
4 On Question A, answer B, delete "license" 5 and insert "were the" after "evaluate of."
6 On Question A8, change "managed" to 7 "management." Same question, change "program" to 8 "programs." Change "program generically" to "programs 9 generically." Change "existing program" to "existing 10 programs."
11 Question A10, insert "a" before "computer 12 code."
13 Question A14, change "model" to "model's."
14 Change Question A15 to insert "a" before 15 "FAC."
16 Question A17, insert the word "the" before 17 "CHECWORKS."
18 Question A18, insert "of" after the word 19 "input."
20 Question Q19, insert "are needed" after 21 "cycles."
22 Question A19, I guess, like 12, insert 23 "of" after "five to tens years."
24 Question Q20, line 3, delete the extra 25 period.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1428 1 Question A22, line four, insert a period 2 after the word "plant."
3 Question A24, line nine, change "increase" 4 to "increases."
5 Question A24, line 11, change.. "ware" 6 spelled W-A-R-E to "wear" spelled W-E-A-R.
7 Question A25, line four, delete "instead."
8 Question A26, Answer A26, line nine, 9 delete the word "to" after "CHECWORKS."
10 A27, line four, delete "to" after 11 "continue." A27, line five, insert "in" after 12 "parameter."
13 A28, line three, delete "necessary" after 14 "need to."
15 Q30, line one, change "managing" to 16 "manage."
17 A30, line two, insert "that" after "mine.
18 A30, line three, change "selected" to select." A30, 19 line four, change "structurally" to "structural."
20 Q31, line one, delete "to" after "modify."
21 A32, line eight, insert "for the following 22 four reasons." A32, line 33, change "ruptured" to 23 "rupture." A32, line 37, change "the" to "that."
24 A34, line five, insert "to be" before 25 "acceptable."
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1429 1 A35, line four, delete "of" after 2 "selecting." A35, line nine, insert "of" after 3 "section."
4 A37, line six, insert "the" before "EPU."
5 A37, line six,. insert "the"..between "of" and "last."
6 A37, line 11, change "used" to "use."
7 Q38, line one, change "Q38.." to "Q38."
8 A39, line three, change the comma to a 9 semicolon. A39, line five, change the period after 10 "EPU" to colon "and." And A39, line nine, insert "due 11 to" after. "aging."
12 MR. SUBIN: Do you adopt your testimony as 13 your testimony in this proceeding?
14 MR. ROWLEY: We do.
15 MR. SUBIN: I move to have this testimony 16 admitted to the transcript as it is read.
17 (Whereupon, the document 18 referred to was marked as NRC 19 Staff Exhibit No. for 20 identification.)
21 JUDGE KARLIN: Thank you, Mr. Subin. Any 22 objections?
23 (The document referred to 24 having been previously marked 25 for identification as NRC Staff NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1430 1 Exhibit, was received in 2 evidence.)
3 MR. ROTH: No objections, Your Honor. But 4 just going back, setting backwards a little bit, there 5 was corrected exhibits that were handed out by 6 Entergy. I didn't get a copy of those both with 7 respect to the steam dryer and Exhibit 8.
8 JUDGE KARLIN: All right. Mr. Diaz, could 9 you get that to Mr. Roth please?
10 MR. TRAVIESO-DIAZ: Yes.
11 JUDGE KARLIN: Did you have something, Mr.
12 Subin?
13 MR. SUBIN: Yes, I also wanted to admit 14 the corresponding exhibits.
15 JUDGE KARLIN: Yes, certainly.
16 MR. SUBIN: Sixteen, 17, 18, 20, 21, A, B, 17 C and Exhibits 1 and 19 have already been admitted.
18 JUDGE KARLIN: All right.
19 MR. SUBIN: I move to have those admitted.
20 (Whereupon, the documents 21 referred to were marked as NRC 22 Staff Exhibits 17-21 and A-C 23 for identification.)
24 JUDGE KARLIN: So have all of them already 25 been admitted?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1431 1 MR. SUBIN: No, just the last two that I 2 mentioned earlier.
3 JUDGE KARLIN: But the others you are 4 moving for-admission?
5 MR. SUBIN: Right. Correct.
6 JUDGE KARLIN: Any objections?
7 (No verbal responses.)
8 Hearing none, they're admitted.
9 (The documents referred to 10 having been previously marked 11 for identification as NRC Staff 12 Exhibits 17-21 and A-C were 13 received in evidence.)
14 Is that all, Mr. Subin?
15 MR. SUBIN: Yes, that's all.
16 JUDGE KARLIN: Ms.- Tyler.
17 MS. TYLER: The direct and rebuttal 18 testimony of Joram Hopenfeld has already been 19 admitted. I now move to admit the exhibits referenced 20 in that testimony which are exhibit NEC JH-36 through 21 exhibit NEC JH-53 and Exhibit NEC JH70 through NEC 22 JH72.
23 (Whereupon, the documents 24 referred to were marked as NEC 25 Exhibit JH36-JH53 and JH70-JH72 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1432 1 for identification.)
2 Now directing questions to Dr. Rudolf 3 Hausler.
4 JUDGE KARLIN.: Are there any new exhibits 5 associated with Dr. Hopenfeld's testimony?
6 MS. TYLER: NEC would like to admit all 7 the exhibits associated with his testimony.
8 JUDGE KARLIN: I'm sorry. Are there any 9 new exhibits associated with his Contention 4 10 testimony --
11 MS. TYLER: I just mentioned --
12 JUDGE KARLIN: -- that haven't already 13 - been admitted?
14 MS. TYLER: I just did mean to admit 15 those.
16 JUDGE KARLIN: Okay. Any objections?
17 (No verbal response.)
18 No. Then they're admitted.
19 (The documents referred to 20 having been previously marked 21 for identification as NRC 22 Exhibits JH36-JH53 and JH70-23 JH72, was received in 24 evidence.)
25 Yes. Okay. Now proceed.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neaIrgross.com
1433 1 MS. TYLER: Okay. Directing questions to 2 Dr. Rudolf Hausler, Dr. Hausler, do you have in front 3 of you the pre-filed direct testimony of Dr. Rudolf 4 Hausler regarding NEC's Contention 4 and the pre-filed 5 rebuttal testimony of Dr. Rudolf Hausler regarding 6 NEC's Contention 4?
7 DR. HAUSLER: I do.
8 MS. TYLER: Did you prepare this testimony 9 for submission in this proceeding?
10 DR. HAUSLER: I'm sorry -- A little 11 difficulty hearing.
12 MS. TYLER: Did you prepare this testimony 13 for submission in this proceeding?
14 DR. HAUSLER: Yes.
15 MS. TYLER: Do you have any corrections to
- 16. make to the testimony at this time?
17 DR. HAUSLER: No ma'am. Not at this time.
18 MS. TYLER: Do you adopt this testimony as 19 your sworn testimony in this proceeding?
20 DR. HAUSLER: I do.
21 MS. TYLER: I move to admit Dr. Rudolf 22 Hausler's testimony.
23 (Whereupon, the document 24 referred to was marked as NEC 25 Exhibit for identification.)
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1434 1 JUDGE KARLIN: All right. Any objections?
2 (No verbal response.)
3 Hearing none, it is admitted.
4 (The document referred to 5 having been previously marked 6 for identification as NEC 7 Exhibit, was received in 8 evidence.)
9 MS. TYLER: I also move to admit the 10 exhibits referenced in that testimony which are 11 exhibits NEC RH02 through NEC RH05.
12 (Whereupon, the documents 13 referred to were marked as NEC 14 Exhibit RH02-RHO5 for 15 identification.)
16 JUDGE KARLIN: Any objections?
17 (No verbal response.)
18 Hearing none, they're admitted.
19 (The documents referred to 20 having been previously marked 21 for identification as NEC 22 Exhibits RH02-RHO5, were 23 received in evidence.)
24 MS. TYLER: Directing questions now to 25 Ulrich Witte, Mr. Witte, do you have before you the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1435 1 pre-filed direct testimony of Ulrich Witte regarding
.2 NEC Contention 4 and the ore-filed rebuttal testimony 3 of Ulrich Witte regarding NEC Contention 4?
4 MR. WITTE: Yes, I do.
5 MS. TYLER: And did you prepare this 6 testimony for submission in this proceeding?
7 MR. WITTE: Yes, I did.
8 MS. TYLER: Do you have any corrections to 9 make to it at this time?
10 MR. WITTE: No.
11 MS. TYLER: Do you adopt this testimony as 12 your sworn testimony in this proceeding?
13 MR. WITTE: Yes, I did.
14 MS. TYLER: I move to admit Mr. Witte's 15 testimony for the record.
16 (Whereupon, the document 17 referred to was marked as NEC 18 Exhibit for identification.)
19 JUDGE KARLIN: Any objections?
20 (No verbal response.)
21 Hearing none, it is admitted.
22 (The document referred to 23 having been previously marked 24 for identification as NEC 25 Exhibit, was received in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1436 1 evidence.)
2 MS. TYLER: I also move to admit the 3 exhibits referenced in Mr. Witte's testimony which are 4 Exhibits NEC W02-NEC W22.
5 (Whereupon, the documents 6 referred to were marked as NEC 7 Exhibit W02-W22 for 8 identification.)
9 JUDGE KARLIN: Any objections?
10 (No verbal response.)
11 Hearing none, they so be admitted.
12 (The documents referred to 13 having been previously marked 14 for identification as NEC 15 Exhibit W02-W22, were received 16 in evidence.)
17 Anything else, Ms. Tyler?
18 MS. TYLER: No.
19 JUDGE KARLIN: All right. Thank you.
20 I think that's helpful to get the 21 witnesses sworn in and their exhibits brought in to 22 the evidentiary record this afternoon. Normally, at 23 this point, we would begin questioning the witnesses.
24 But we did have the request prior to the beginning of 25 the evidentiary hearing in a written notice that Dr.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1437 1 Horowitz and I apologize, Dr. Horowitz, that your name 2 tag says "Mr. Horowitz." We know it's Dr. Horowitz.
3 We asked him to put together a brief presentation on 4 CHECWORKS.
5 I would like to call upon you to give us 6 that presentation at this point, sir, and you may go 7 over to the podium if you find that helpful.
8 (Off the record comment.)
9 JUDGE KARLIN: All right. Let's take a 10 pause.
11 (Pause.)
12 JUDGE WARDWELL: We requested a 13 presentation that would be kind of a nuts and bolts 14 discussion of how CHECWORKS works. I reviewed the 15 slides and I think all the slides do achieve that goal 16 with the exception of Slide 12. I think we will get 17 to some of the things you want to talk about in Slide 18 12, but I'd rather do it as part of questioning rather 19 than have you present it because I want it to be 20 strictly as best we can an impractical presentation of 21 what CHECWORKS is about.
22 So I would ask you to stop at Slide 11.
23 Slide 13 is merely questions and we will have plenty 24 of questions for you tomorrow on this which will cover 25 what you said in Slide 12 also.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
143-8 1 At this time, I would like to ask NEC's 2 witnesses if they've had a chance to review these 3 overhead slides. Have you received these overhead 4 slides before today?
5 -(Off the record comment.)
6 With the exception of Slide 12, is there 7 anything there that you feel is editorialized in 8 regards to Dr. Horowitz's presentation of just the 9 mechanics of how CHECWORKS works? Do you see any 10 professional opinions on how effective it is or what 11 it does, how it achieves it in a relative fashion of 12 effectiveness or that type of thing? Do you have any 13 objections to what he's saying?
14 MR. WITTE: Your Honor, for the record, I 15 have not had a chance to review this.
16 JUDGE WARDWELL: You did receive it before 17 though.
18 MR. WITTE: Yes, sir.
19 JUDGE WARDWELL: Thank you.
20 Dr. Hausler. Thank you, Dr. Hopenfeld.
21 DR. HAUSLER: (Off microphone) Your Honor, 22 the slides are really in the sense of radiation what 23 Dr. Horowitz is going to explain to us. In that 24 sense, they really are -- objection or opinion of --
25 JUDGE WARDWELL: Fine, we will wait until NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1439 1 later then.
2 Dr. Horowitz, proceed and if I do stop 3 you, it is because I have the feeling that it's more 4 editorialized also and I'll ask you to move on. But
. 5 other than that, proceed until either --
6 DR. HOROWITZ: First of all, good 7 afternoon. I appreciate the opportunity to speak 8 about CHECWORKS before you this afternoon.
9 (Inaudible.)
10 Should I announce that?
11 JUDGE WARDWELL: Yes, that would be fine.
12 DR. HOROWITZ: So background, the story 13 I'm about to tell really begins with the Surry 14 accident of Unit 2 in December 1986. Surry is a two-15 unit PWR station located in Virginia. As a result of 16 that accident, four men were killed. There was plant 17 damage. There was also injuries to other workers and 18 that prompted an investigation by all sorts of parties 19 and, as a result of the investigation, it was 20 determined that the cause of the rupture was flow 21 accelerated corrosion as we now call erosion corrosion 22 mechanism. This mechanism is a dissolution of the 23 iron oxide coating from steel surface and if it 24 continues on unabated it will eventually result in 25 rupture.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1440 1 The fact is that there were large portions 2 of the elbow in question eroded away. It corroded 3 away. In fact, about half of the material, more than 4 half of the material, of the elbow was gone.
5 So, as a result of this accident, there 6 was a need for U.S. nuclear units to inspect single 7 phase piping. By single phase, I mean water only and 8 water only as opposed to two phase which contain water 9 and steam. At the time of the accident back in '86, 10 there were only very limited programs in the U.S. to 11 inspect single phase piping.
12 Because of the situation, both EPRI and 13 NUMARC, an industry organization, committed to develop 14 a computer program to assist utilities in selecting 15 inspection locations to look for flow accelerated 16 corrosion damage.
17 At the same time, back in the spring of 18 '97, NULMARC issued programmatic guidance which is in 19 effect the father of NSAC-202L.
20 JUDGE KARLIN: What does NUMARC stand for 21 please?
22 DR. HOROWITZ: Nuclear Utility Management 23 and Resources Council.
24 JUDGE KARLIN: All right. Thank you.
25 DR. HOROWITZ: Over the past 20 something NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1441 1 years, CHEC has evolved in the CHECWORKS and I'll talk 2 about the evolution a little bit.
3 Okay. Next slide, Slide 3, in view of the 4 current constraint, the U.S. utilities were planning 5 for outages and had to have selection inspection 6 locations selected. So we were under a great deal of 7 pressure to develop this tool to help them to select 8 inspection locations and, in fact, the program was 9 released within seven months of the Surry accident.
10 It was released from a little over three months since 11 NUMARC made the decision to go ahead with the program.
12 So what we did is we gathered laboratory 13 data from England from Central Electricity Generating 14 Board and from France from the Electricity of France, 15 the national utility, and we also gathered plant and 16 laboratory data from Siemens in Germany. In fact, at 17 the time, we obtained all known laboratory data on the 18 subject and we were in a unique position because 19 nobody had ever looked at all that data together.
20 JUDGE KARLIN: May I ask? When you say 21 "we," who is "we"?
22 DR. HOROWITZ: We at the time of starting 23 the CHECS was the EPRI program manager and myself.
24 JUDGE KARLIN: Okay.
25 DR. HOROWITZ: So what we did and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1442 1 essentially the two of us and later in the game we had 2 help from a programmer used the scientific knowledge 3 available at EPRI of corrosion experts and the 4 laboratory data and they are mostly from Europe and we 5 designed a new correlation to relate the plant 6 conditions with rates of corrosion. Now Slide 4 7 please.
8 So we were not the first to do this.
9 There was previous work, again, mostly in Europe and, 10 in fact, gentlemen named Keller and Kastner, both from 11 Germany and both work for Siemens, had during the past 12 roughly 15 years developed their own models for 13 predicting rates of flow accelerated corrosion. We 14 also had the benefit of some scientific work done with 15 Phillipe Berge who has since retired from EIF who did 16 a great deal of background work in this area and we 17 came up with a simple looking model.
18 I say simple looking because it's a 19 product of seven factors. Now naturally the factors 20 themselves are not simple numbers. They're 21 complicated functions in general. And you can see 22 these six factors, the first six factors, we used in 23 CHEC and when we extended the program to two phase, we 24 added factor seven for void fraction.
25 Just very, very briefly, the factors we NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1443 1 considered are temperature of the .fluid, the mass 2 transfer factor which is related to the mass transfer 3 that a straight pipe would experience, a geometry 4 factor which relates the straight pipe mass transfer 5 to that in the fixings such as an elbow, the pH factor 6 and oxygen factor that accounts for water chemistry 7 and the alloy factor to account for the composition of 8 the material. Next Slide No. 5.
9 So coming along was basically the last of 10 the first generation programs. We had the advantage 11 over previous workers and we knew what they did. But, 12 more importantly, we had the largest database of 13 experimental and eventually plant conditions.
14 We also took the more sophisticated 15 approach particularly when we went to CHECHATE two 16 years later of incorporating local conditions of water 17 chemistry and the flow and we did that by having 18 separate features to form detailed calculation of the 19 plant chemistry and also a flow as desired by the 20 analysts.
21 We also used geometry factors based on 22 plant data. In the past, geometry factors were a 23 concept developed by Keller in the early 170s and 24 Keller was working steam turbine. So he developed a 25 large number of geometry factors. From what we can NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross~com
1444 I tell and a lot of this knowledge has been lost, what 2 he used is he used comparisons between overall 3 pressure drop and the rate of flow accelerated 4 corrosion. We, on the other hand, use plant data from 5 actual plants compared to straight pipes and we also 6 had insight from copper modeling tests which is 7 explained in one of my exhibits how exactly that's 8 works.
9 What we've done over the years, this was 10 1987, in the 21 years or so is we have continually 11 looked at the data as it becomes available.
12 Laboratory data has becomes available, limited now to 13 France, particularly in the 1990s and periodically 14 we'll go back and we'll look at all available plant 15 data and go back and examine how well the correlation 16 performs. When a new issue occurs or we get reports 17 from users that something is not working as well as 18 we'd like it we will do a separate study and look at 19 that individual parameter.
20 Slide 6, Input Parameters. When we 21 designed the program, one of our foremost goals was to 22 have a program that utility engineers could use. So 23 therefore the inputs to the program had to be readily 24 available to utility engineers. The way it's 25 structured currently in CHECWORKS is we have five NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1445 1 classes of input data just to divide this out for some 2 --
3 The first is a heat balance diagram and 4 the heat balance diagram is a logical representation 5 of how the major components in the power are 6 connected, having feedwater heaters and injection 7 lines, whether it's a reheat or not, and we have kind 8 of a computerized tinker toy to allow. the user to 9 connect them up together. But this is done once when 10 the model is put together.
11 To make the program work, you also have to 12 include global conditions, in other words, things that 13 affect everything in the plant such as operating 14 hours, power level, water chemistry parameters and 15 operating time. This is done for each operating 16 period. So this is a relatively small job to complete 17 for the plant..
18 By far, the most information that's put in 19 is at the component level and I've listed some of the 20 things here. So, for each component you're analyzing, 21 you have to define the geometry and material, the flow 22 rate, the thermal dynamic conditions, parameters like 23 this. If it's a valve, some other information. If 24 it's an elbow, some other information. But that's 25 pretty low level.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1446 1 You also can input the component 2 replacement information. The component is operated 3 for awhile. It needs to be replaced. You could put 4 that in the program to find the new component, to find 5 whether it was replaced and this becomes very 6 important because the way the program works is it does 7 a step-wise integration of the wear and you have to 8 know how old it is to do that properly.
9 And, lastly, inspection data. If 10 available, you can input inspection data which is 11 normally a thickness matrix at a given time. Okay.
12 Slide 7 please.
13 Plant Modeling. So conceptually, we've 14 put together a plant model. How do we use it? We 15 have all the data in. What do we do next?
16 The analyst goes through and divides the 17 plant into a number of lines. We call them analysis 18 lines and the lines do not have to be physically 19 attached, but they represent components which have the 20 same water chemistry and generally the same 21 temperature. What that means is there are components 22 we expect to behave in the same way and depending on 23 the complexity of the reactor itself and the amount of 24 inspection data we have available here, there's 25 typically between 20 and 50 of these lines, sometimes NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1447 1 more. But that 20 to 50, 25 to 50 is a good 'rule of 2 thumb.
3 Using all the information available to the 4 program, now the analyst tells the program to 5 calculate for a given analysis line. That program 6 will for each operating point, excuse me, for 7 operating period calculate the corrosion rate, 8 multiply by the time and calculate the amount of 9 incremental wear for that operating period. At the 10 end of the process, the individual pieces will be 11 summed up and the total predicted wear will be 12 obtained.
13 Next slide is No. 8. So specifically we 14 tried to design CHECWORKS to do is to handle changes 15 of conditions and the reason it's true is if 16 conditions aren't changing and I was in Japan last 17 year and the Japanese reactors tend to run at 18 consistent conditions, consistent chemistry, forever 19 and that's the way to do things over there the tool is 20 much less useful because the advantage of the tool, 21 for example, in the early '90s pressurized water 22 reactors were going through a large improvement of 23 water chemistry. They changed the chemicals they 24 used. They changed the pH. They changed the mix of 25 chemicals used and having a tool like this you can NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1448 1 evaluate in advance of making a change what the 2 impacts would be. Changes of operating conditions and 3 water chemistry and for each operating period in the 4 program, the conditions are defined and the 5 calculations are made.
6 In doing this design of the program, 7 forecasting change is one of the main things we were 8 concerned about and the second was in like all the 9 components, both components with inspection data and 10 without inspection data. It's important to keep in 11 mind that CHECWORKS is a tool to help the engineer 12 select inspection locations. CHECWORKS does not 13 produce a list of inspection locations. It's not 14 automatic. You need a human being between the program 15 output and the inspection list generated. Slide 9.
16 That's overall how the program works. Now 17 I'll get into a little more detail about how it's 18 actually used. There are two modes of operation 19 called Pass 1 and Pass 2 and Pass 1 does a prediction 20 using the correlation without any consideration of 21 inspection data and this just gives you a raw 22 prediction. It's typically only used when a line has 23 not been inspected. A line is not considered. And as 24 I said, it's seldom used particularly in the CHECWORKS 25 program.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1449 1 Pass 2, on the other hand, at the opinion 2 of the. analyst considers inspection data and Pass 2 in 3 the -- relates the predicted amount of wear and the 4 amount of wear measured at that time. The next slide 5 please.
6 So a user using the program after doing 7 the Pass 2 analysis has the ability to look in 8 graphical basis and also tabular basis how the 9 predictions compare and this is an important part of 10 the process and we strongly recommend that users 11 consider spending time looking at the information and 12 trying to understand what the information is teliing 13 the analyst. Note that the line correction factor is 14 computed separately for each line analyzed and the 15 user has the ability to, I mentioned that before, see.
16 the results. And keep in mind that the line 17 correction factor is calculated by the program and is 18 displayed to the user. Next slide which is the lat 19 one, Slide 11.
20 So does the program give the user? The 21 program in the various forms, tabular and graphical, 22 gives information for each component to analyze and 23 proves the predicted wearing on an average basis and 24 for the last operating period, the predicted thickness 25 and the predicted time for each user-defined critical NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
1450 1 thickness. And for Pass 2 analysis, the user also 2 gets the line correction factor.
3 Thank you. Any questions?
4 JUDGE WARDWELL: Thank you, Dr. Horowitz.
5 We'll have questions for you tomorrow on this. But 6 we'll wait until then to start pulling that back out 7 again and get into the middle of that.
8 JUDGE KARLIN: Thank you, Dr. Horowitz.
9 Yes. I think with that we probably have hit a 10 breaking point that would be good to break now and 11 reconvene tomorrow morning at 8:30 a.m. crisply if we 12 can. It may be a long day. We may go later than 5:00 13 p.m. tomorrow, as late as they will let us stay here 14 and it takes. But I don't think we'll have to go 15 late. We're just going to ask questions and see how 16 far we get.
17 Right now, it's a little anticlimactic for 18 all these excellent witnesses to be sworn in and not 19 get a chance to speak. But.we will ask the questions 20 tomorrow rest assured. You'll get your chance. So we 21 will stand adjourned for the day and reconvene 22 tomorrow at 8:30 a.m. Thank you. Off the record.
23 (Whereupon, at 4:34 p.m., the above-24 entitled matter was concluded to reconvene at 8:30 25 a.m. the next day.)
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
CERTIFICATE This is to certify that the attached proceedings before the United States Nuclear Regulatory Commission in the matter of: Entergy Nuclear Vermont Yankee, LLC & Entergy Nuclear Operations, Inc.
Name of Proceeding: Hearing Docket Number: 50-271-LR, ASLBP No. 06-849-03-LR Location: Newfane, Vermont were held as herein appears, and that this is the original transcript thereof for the file of the United States Nuclear Regulatory Commission taken by me and, thereafter reduced to typewriting by me or under the direction of the court reporting company, and that the transcript is a true and accurate record of the foregoing proceedings.
Ar Toby lter Offi 1 Reporter Neal R. Gross & Co., Inc.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.