Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 July 24, 2008 3F0708-07 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Crystal River Unit 3 - Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008
Dear Sir:
As requested by the referenced NRC Regulatory Issue Summary, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., hereby provides the attached completed NRC Form 536 delineating the proposed specific operator licensing examination schedule for calendar years (CYs),2009 through 2011 as well as adding an estimate for CY 2012.
The attached form provides an estimate of the number of applicants planning to take the operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
If you have any questions regarding this submittal, please contact Mr. Mark Van Sicklen, Superintendent, Operations Training at (352) 563-4452.
Sincerely, Richard Hons Training Manager RH/ff
Attachment:
NRC Form 536 - Operator Licensing Examination' Data xc:
Regional Administrator, Region II Malcolm T. Widmann, Region II NRR Project Manager Senior Resident Inspector Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT-3 DOCKET NUMBER 50-302 /LICENSE NUMBER DPR-72 ATTACHMENT NRC FORM 536 OPERATOR LICENSING EXAMINATION DATA
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Progress Energy Florida, Inc. -- Crystal River Unit 3 15760 West Power Line Street Crystal River, FL 34428-6708 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 4
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR 7
0 5
0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/07/2009 N/A 09/12/2011 N/A ALTERNATE DATE 09/28/2009 N/A 09/26/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
12 0
0 CANDIDATES N RC FORM 536 (8-2005)